From Wikipedia, the free encyclopedia

A monument along the right-of-way in Stanton, commemorating the Pacific Electric streetcars.
West Santa Ana Branch
Watts Junction
Long Beach Boulevard
Paramount/Rosecrans
Bellflower Bike Trail
Bellflower
Pioneer
Medal of Honor Trail
Harbor Transit Center
Willowick
optional
Fairview
Maintenance and
Storage Facility
Raitt Street
Santa Ana Boulevard

light rail projects built or planned since
Pacific Electric service ended
unused right of way

The West Santa Ana Branch is a rail right-of-way formerly used by the Pacific Electric's (PE) Santa Ana route in Los Angeles County and Orange County in Southern California. The Los Angeles County Metropolitan Transportation Authority (Metro) owns the segment of the right-of-way in Los Angeles County, and the Orange County Transportation Authority (OCTA) owns the segment in Orange County. [1] [2]

The line runs from the Watts Towers in the city of Los Angeles, southeast to the intersection of 4th Street and Santa Ana Boulevard in downtown Santa Ana. A two-mile (3.2 km) portion of it is occupied by Interstate 105 and the C Line. The right-of-way runs nearly straight on a diagonal between the two cities, in contrast to the cardinal grid of Orange County.[ citation needed]

History

The right-of-way was established as an interurban route for the Pacific Electric Railway. Grading of the route began on September 30, 1904, [3] and service commenced in 1905. The line was double-tracked for its length except for single track bridges. One set of tracks was removed in 1941. [4] Service was truncated to Bellflower in 1950, and finally discontinued in 1958. Southern Pacific continued to use the line for freight. A Caltrans survey in 1981 reported that the line had been reduced to a single track railway, which had several level crossings removed and was in poor condition. [4] The 12.5-mile (20 km) section in Orange County between Paramount and Stanton was acquired by the Southern California Regional Rail Authority in 1990 as part of the $450 million package deal with Southern Pacific (equivalent to $1.05 billion in 2023). [5] The Century Freeway and the Green Line were constructed along a segment in Lynwood, opening in 1993 and 1995 respectively.

Remnants

Pacific Electric Sub-Station No. 14 in Santa Ana was added to the list of National Register of Historic Places on September 22, 1983.

The Ghost Town & Calico Railroad attraction at Knott's Berry Farm uses a PE depot formerly located at Hansen station along the ROW in Stanton as the main station building. The building was moved to the theme park in 1952. [6] [7] [8]

The Bellflower station was restored to its opening condition in 2008.

Despite the inactivity of the line, parts of the right-of-way still hold tracks that are in working order. For example, a warehouse stub of the San Pedro Branch Rail is located between Garfield Avenue and Rosecrans Avenue. The Paramount Industrial Lead, another branch of the San Pedro Branch Rail, also occupies the right-of-way with a non-gated level crossing at the intersection of Rosecrans Avenue and Paramount Boulevard, a gated crossing at Downey Avenue, and a depot near Somerset Boulevard's Paramount Petroleum plant.

Several disconnected and dilapidated fragments of tracks remain at random intervals throughout the right-of-way.

Future development

The Southern California Association of Governments (SCAG), in conjunction with Metro and OCTA, [9] [10] conducted an alternatives analysis to determine the list of all feasible alternatives for the project.[ needs update] These alternatives may use all or part of the ROW. Modes under consideration were bus rapid transit, light rail, commuter rail and high-speed rail. SCAG organized a first round of public meetings in June 2010. A second round of public meetings were held in November and December 2010. [11] All currently planned projects on the WSAB right-of-way have been various forms of light rail, including modern streetcars using light-rail vehicles (LRVs).

Los Angeles Metro project

Metro has prioritized the corridor on its Long Range Transportation Plan (LRTP), and funding for it was guaranteed in the LA County Measure R and Measure M transportation funding ballot measures. [12] [13] As proposed, the light rail line will travel between Artesia and Union Station, using the ROW between Paramount and Artesia. [14]

OC Streetcar

As of 2016, the Orange County Transportation Authority (OCTA) is collaborating with the cities of Santa Ana and Garden Grove to build a streetcar line. The western terminus of the proposed route would follow the Pacific Electric right-of-way near the intersection of Harbor Boulevard and Westminster Avenue in Garden Grove. [15]

See also

References

  1. ^ "West Santa Ana Transit Corridor". Los Angeles Metro. Retrieved January 1, 2014.
  2. ^ "Pacific Electric Right of Way Study". Orange County Transportation Authority. Retrieved January 1, 2014.
  3. ^ "Finest line work begun". The Los Angeles Times. October 1, 1904. p. 13. Retrieved December 15, 2022 – via Newspapers.com. Free access icon
  4. ^ a b "1981 Inventory of Pacific Electric Routes" (PDF). Caltrans. February 1982. Retrieved June 3, 2020.
  5. ^ Rail Passenger Development Plan: 1991-96 Fiscal Years (PDF). Sacramento, CA: Division of Mass Transportation, Caltrans. 1991.
  6. ^ DeCaro, Dave. "Knott's Berry Farm: Calico Railroad". Daveland. Retrieved May 7, 2017.
  7. ^ "The Santa Ana Branch". Abandoned Rails. Retrieved May 7, 2017.
  8. ^ Brigandi, Phil. "Historic Knott's Berry Farm". So Cal Historyland. Retrieved May 7, 2017.
  9. ^ "About the Project". Pacific Electric Corridor. Southern California Association of Governments. Archived from the original on May 1, 2012. Retrieved January 6, 2014.
  10. ^ Chan, Steven (September 5, 2008). "Bravo! rapid bus, part III: A massive expansion, plus light rail in Orange County?". Resonance:Steven Chan's website. Retrieved January 1, 2014.
  11. ^ "Community Meetings". Pacific Electric Corridor. Southern California Association of Governments. Archived from the original on May 3, 2012. Retrieved January 6, 2014.
  12. ^ "2009 Long Range Transportation Plan Attachment A" (PDF). Los Angeles County Metropolitan Transportation Authority. Retrieved January 6, 2014.
  13. ^ "Proposed One-Half Cent Sales Tax for Transportation" (PDF). Los Angeles County Metropolitan Transportation Authority. Retrieved January 6, 2014.
  14. ^ "LACMTA to begin environmental process for West Santa Ana Branch line". RT&S. Simmons-Boardman Publishing. September 23, 2016. Retrieved May 7, 2017.
  15. ^ Marroquin, Art & Pimentel, Joseph (March 3, 2016). "Anaheim releases proposed map for streetcar that would link ARTIC to Disneyland". The Orange County Register. Retrieved March 5, 2016.

External links