PhotosLocation


Redondo_Beach_(Los_Angeles_Metro_station) Latitude and Longitude:

33°53′41″N 118°22′09″W / 33.8947°N 118.3693°W / 33.8947; -118.3693
From Wikipedia, the free encyclopedia

Redondo Beach
C Line 
Redondo Beach station platform
General information
Location5301 Marine Avenue
Redondo Beach, California
Coordinates 33°53′41″N 118°22′09″W / 33.8947°N 118.3693°W / 33.8947; -118.3693
Owned by Los Angeles County Metropolitan Transportation Authority
Platforms1 island platform
Tracks2
Connections
Construction
Structure typeElevated
Parking340 spaces [1]
Bicycle facilities Racks and lockers [2]
AccessibleYes
History
OpenedAugust 12, 1995; 28 years ago (1995-08-12)
Previous names
  • Marine Ave/Redondo Beach Ave (1995-2003) [3]
Services
Preceding station Metro Rail Following station
Terminus C Line Douglas
toward Norwalk
Future services
Preceding station Metro Rail Following station
Douglas K Line
(2024)
Terminus
Location

Redondo Beach station is an elevated light rail station on the C Line of the Los Angeles Metro Rail system. It is located over Marine Avenue in the city of Redondo Beach, California, after which the station is named. It opened with the commencement of Green Line service on August 12, 1995. [4] The station is currently the western terminus of the C Line. An extension beyond Redondo Beach into Torrance is in the planning stages. [5]

Under current Metro plans, the C and K Lines will be restructured by the end of 2024; Redondo Beach station will be served by the K Line, while the C Line will be rerouted to terminate at the future LAX/Metro Transit Center station. [6]

The station was initially named Marine Ave/Redondo Beach Ave but was later simplified to Redondo Beach in 2003. [7] [8]

The train platform, currently suitable for two-car trains, is planned to be lengthened by 2028 to accommodate longer three-car trains. [9] [10]

Service

Station layout

Platform Eastbound   C Line toward Norwalk ( Douglas)
Island platform, doors will open on the left or right
Eastbound   C Line toward Norwalk ( Douglas)
G Street level Entrance/Exit, faregates, ticket machines, bus plaza, park and ride

Hours and frequency

C Line service hours are approximately from 4:00 a.m. until 12:30 a.m. daily. Trains operate every 10 minutes throughout the day. Night and early morning weekend service is every 20 minutes. [11]

Connections

As of December 10, 2023, the following connections are available: [12]

Notable places nearby

The station is within walking distance of the following notable places:

In popular culture

The station appeared as the light rail station in the opening montage to the 1995 film Heat. The station also appeared in the closing moments of another film directed by Michael Mann, Collateral.[ citation needed]

References

  1. ^ "Metro Parking Lots by Line". Los Angeles County Metropolitan Transportation Authority. Archived from the original on August 10, 2020. Retrieved November 5, 2021.
  2. ^ "Secure Bike Parking on Metro" (PDF). Los Angeles County Metropolitan Transportation Authority. Archived from the original (PDF) on September 6, 2021. Retrieved November 5, 2021.
  3. ^ "Image showing Marine Ave / Redondo Beach Ave sign". www.nycsubway.org. Archived from the original on November 13, 2021. Retrieved November 13, 2021.
  4. ^ "Green Light for the Green Line". The Los Angeles Times. The Los Angeles Times. August 12, 1995. p. 334. Retrieved June 30, 2023 – via Newspapers.com. Free access icon
  5. ^ Sharp, Steven (August 9, 2022). "Metro rolls out new options for C Line extension to Torrance". Urbanize Los Angeles. Retrieved August 12, 2022.
  6. ^ "Board of Directors – Regular Board Meeting". Los Angeles County Metropolitan Transportation Authority. Retrieved June 23, 2023.
  7. ^ "August 2003 Board Meeting - Item 10" (PDF). Los Angeles County Metropolitan Transportation Authority. August 21, 2003. p. 4. Retrieved March 16, 2024.
  8. ^ "Metro Bus and Metro Rail System Map - West/Central Los Angeles" (PDF). Los Angeles County Metropolitan Transportation Authority. August 2003. Archived from the original (PDF) on December 12, 2003. Retrieved April 6, 2024.
  9. ^ Sharp, Steven (January 14, 2020). "Metro Seeks State Funds to Extend Green Line Platforms". Urbanize Los Angeles. Retrieved April 7, 2023.
  10. ^ Steven, Sharp (April 25, 2023). "State awards more funding for L.A. area transportation projects". Urbanize Los Angeles. Retrieved April 25, 2023.
  11. ^ "Metro C Line schedule". December 10, 2023. Retrieved December 25, 2023.
  12. ^ "C Line Timetable – Connections section" (PDF). Los Angeles County Metropolitan Transportation Authority. December 10, 2023. p. 2. Retrieved December 26, 2023.
  13. ^ "LADOT Commuter Express 438 Map & Schedule" (PDF). Los Angeles Department of Transportation. July 31, 2021. Retrieved December 26, 2023.

Media related to Redondo Beach (Los Angeles Metro station) at Wikimedia Commons