Chengdu–Dazhou–Wanzhou high-speed railway 成达万高速铁路 | |
---|---|
Overview | |
Status | Under construction |
Termini | |
Stations | 13 |
Service | |
Operator(s) | China Railway Chengdu Group |
Technical | |
Line length | 477 km (296 mi) [1] |
Track gauge | 1,435 mm (4 ft 8+1⁄2 in) |
Operating speed | 350 km/h (217 mph) |
The Chengdu–Dazhou–Wanzhou high-speed railway or Chengdawan HSR ( Chinese: 成达万高速铁路; pinyin: Chéngdáwàn Gāosù Tiělù) is a high-speed railway currently under construction in China. This line forms part of the Shanghai–Chongqing–Chengdu high-speed railway.
This railway was planned as early as 2015. [2] Construction began on 30 September 2022. [1]
The section between Tianfu and Tianfu Airport is shared with the Chengdu–Zigong high-speed railway.
Station Name [1] | Chinese |
Metro transfers/connections | ||||||||
---|---|---|---|---|---|---|---|---|---|---|
Tianfu | 天府 | 18 19 | ||||||||
Tianfu Airport | 天府机场 | 18 | ||||||||
Ziyang West | 资阳西 | |||||||||
Lezhi | 乐至 | |||||||||
Suining | 遂宁 | |||||||||
Pengxi South | 蓬溪南 | |||||||||
Nanchong North | 南充北 | |||||||||
Yingshan West | 营山西 | |||||||||
Quxian North | 渠县北 | |||||||||
Dazhou South | 达州南 | |||||||||
Kaijiang South | 开江南 | |||||||||
Yuexi | 岳溪 | |||||||||
Wanzhou North | 万州北 |
成达万高铁全线共设天府站、天府机场站、资阳西站、乐至站、遂宁站、蓬溪南站、南充北站、营山西站、渠县北站、达州南站、开江南站、岳溪站、万州北站等13座车站