Dongguan-Huizhou intercity railway | |||
---|---|---|---|
Overview | |||
Native name | 莞惠城际轨道交通 莞惠线 | ||
Status | Operational | ||
Owner | China Railway | ||
Locale | Guangdong Province, China | ||
Termini | |||
Stations | 18 | ||
Service | |||
Type | Intercity Higher-speed rail | ||
System | Pearl River Delta Metropolitan Region intercity railway | ||
Operator(s) |
CR Guangzhou (until 23 January 2024) Guangdong Intercity (since 23 January 2024 [1]) | ||
Rolling stock | CRH6 EMU | ||
History | |||
Opened | 30 March 2016 28 December 2017 (West section) | (East section)||
Technical | |||
Line length | 103.1 km (64 mi) [2] | ||
Track gauge | 1,435 mm (4 ft 8+1⁄2 in) standard gauge | ||
Minimum radius | 2,200 m (1.4 mi; 7,200 ft) (Normal curves) 2,000 m (1.2 mi; 6,600 ft) (Difficult curves) | ||
Electrification | 25 kV 50 Hz AC ( Overhead lines) | ||
Operating speed | 200 km/h (124 mph) | ||
Maximum incline | 3.0% | ||
|
Dongguan–Huizhou intercity railway, also known as the Guanhui intercity railway or Guanhui City Railway, is a regional railway within Guangdong province, China. It runs between the cities of Dongguan and Huizhou in the Pearl River Delta (PRD). Part of a larger radiating intercity rail transit network, called Pearl River Delta Metropolitan Region intercity railway, across the PRD region, directly connecting with the Guangzhou–Shenzhen intercity railway and the planned Foshan–Dongguan intercity railway. Route length is 103.1 kilometres (64.1 mi), [2] with an estimated construction budget of 25.3 billion RMB. The construction period is planned to take three and a half years. [3] 3 renovated and 14 new stations are being built along the route. It has been built with a design speed of 200 kilometres per hour (124 mph). The Xiaojinkou–Changping East section started operations on 30 March 2016. [4]
Songshan station jerry incident a man surnamed Liu broke the construction side of the Songshan Lake station to cut corners, but the construction company building the site pay a prescription charge of Mr. Yang Zhenggang Songshanhu report indicates that this is malicious, and communicate the results to identify after the fact. [9]
Guanhui intercity railway is an East-West railway that starts in the Changzhou area of Dongguan at Dongguan West railway station, this will be a major interchange with the Guangzhou–Shenzhen intercity railway and the planned Foshan–Dongguan intercity railway, plus Dongguang Metro's Line 1. It then moves westward through the Dongguan regions of Daojiao, then Nancheng, Dongcheng, Liaobu, Songshan Lake, Dalang, Changping and Xiegang. Crossing into Huizhou's Huicheng District it then passes through Lilin, Chenjiang and Huihuan before arriving at Huizhou railway station. Total length of the route is 99.448 km (61.794 mi), 67.460 km (41.918 mi) in Dongguan and 31.988 km (19.876 mi) in Huizhou. Elevated sections of track total 55.831 km (34.692 mi), with 6.586 km (4.092 mi) at ground level and 35.391 km (21.991 mi) being underground.
Originally approved to build 16 stations, the Huizhou Municipal Railway Construction Investment Group Co. Ltd and the Guangzhou Railway Company agreed to build an additional station at Huizhou's West Lake. [10]
Station № |
Station Name | Chinese | Distance km |
Pearl River Delta intercity railway transfers/connections |
Metro transfers/connections |
Location | |
---|---|---|---|---|---|---|---|
WGQ | Dongguan West (Dongguanxi) | 东莞西 | 0.00 | 0.00 | SS FG | Hongmei, Dongguan | |
RRQ | Daojiao | 道滘 | 3.97 | 3.97 | Daojiao, Dongguan | ||
EGQ | Xiping West (Xipingxi) | 西平西 | 9.90 | 13.87 | 2 Xiping station | Nancheng, Dongguan | |
IYQ | Dongcheng South (Dongchengnan) | 东城南 | 3.43 | 17.30 | Dongcheng, Dongguan | ||
LTQ | Liaobu | 寮步 | 8.63 | 25.93 | Liaobu, Dongguan | ||
KUQ | Songshanhu North (Songshanhubei) | 松山湖北 | 6.07 | 32.00 | |||
KOQ | Dalang Town (Dalangzhen) | 大朗镇 | 5.61 | 37.61 | Dalang, Dongguan | ||
FPQ | Changping South (Changpingnan) | 常平南 | 6.11 | 43.72 | Changping, Dongguan | ||
FQQ | Changping East (Changpingdong) | 常平东 | 4.27 | 47.99 | |||
ZRQ | Zhangmutou East (Zhangmutoudong) | 樟木头东 | 6.88 | 54.87 | Zhangmutou, Dongguan | ||
KPQ | Yinping | 银瓶 | 5.49 | 60.36 | Xiegang, Dongguan | ||
KBQ | Lilin North (Lilinbei) | 沥林北 | 7.89 | 68.25 | Huicheng, Huizhou | ||
KKQ | Chenjiang South (Chenjiangnan) | 陈江南 | 11.60 | 79.85 | |||
KHQ | Huihuan | 惠环 | 4.93 | 84.78 | |||
KFQ | Longfeng | 龙丰 | 5.09 | 89.87 | |||
WDQ | Xihu East (Xihudong) | 西湖东 | 2.88 | 92.75 | |||
KZQ | Yunshan | 云山 | 3.05 | 95.80 | |||
NKQ | Xiaojinkou | 小金口 | 4.04 | 99.84 | |||
A 6.4 kilometres (4.0 mi) long extension started construction on May 13, 2021. The extension will continue from Xiaojinkou railway station to the currently under construction Huizhou North railway station. [11]