Istanbul Metro rapid transit station | |||||||||||
General information | |||||||||||
Location | Oruçreis Neighbourhood, Barbaros Street, 34235 Esenler, Istanbul, Turkey | ||||||||||
Coordinates | 41°03′46″N 28°51′19″E / 41.062778°N 28.855278°E | ||||||||||
Owned by | Istanbul Metropolitan Municipality | ||||||||||
Operated by | Istanbul Metro | ||||||||||
Line(s) | M7 | ||||||||||
Platforms | 1 Island platform | ||||||||||
Tracks | 2 | ||||||||||
Connections |
İETT Bus: 33Y, 98Y, HT11 Istanbul Minibus: Topkapı - Bağcılar - Giyimkent, Topkapı - Bağcılar - Yüzyıl Mahallesi, Topkapı - Atışalanı - Yüzyıl Mahallesi | ||||||||||
Construction | |||||||||||
Structure type | Underground | ||||||||||
Parking | No | ||||||||||
Bicycle facilities | Yes | ||||||||||
Accessible | Yes | ||||||||||
History | |||||||||||
Opened | 28 October 2020 | ||||||||||
Electrified | 1,500 V DC Overhead line | ||||||||||
Services | |||||||||||
|
Oruç Reis (Oruç Reis-Yüzyıl) is an underground station on the M7 line of the Istanbul Metro. [1] [2] It is located on Barbaros Street in the Oruçreis neighbourhood of Esenler. It was opened on 28 October 2020. [3]
The M7 line operates as fully automatic unattended train operation (UTO). The station consists of an island platform with two tracks. Since the M7 is an ATO line, protective gates on each side of the platform open only when a train is in the station. [4]
Z | ↘↓ Enter/Exit (1) |
Enter/Exit ↘↓ (2) ↙ | |
B1 | ↓↓↓↓ Ticket Hall | ↙↓↓ Ticket Hall | |
B2 | Passageway ↙ | ||
B3 | Platform |
Platform level | Westbound | ← toward Mahmutbey ( Göztepe Mahallesi) |
Island platform, doors will open on the left | ||
Eastbound | toward Mecidiyeköy ( Giyimkent–Tekstilkent) → |
As of 2021, total length of M7 line is 18 km. The line operates between 06.00 - 00.00 and travel frequency is 6 minutes at peak hour. [1]