From Wikipedia, the free encyclopedia
M10 Pendik Merkez–Sabiha Gökçen Airport
Overview
Status(M4A Operating)
M10 Under construction
OwnerIstanbul Metropolitan Municipality
Locale Istanbul, Turkey
Termini
Stations6
Service
Type Rapid transit
System Istanbul Metro
Services1
Operator(s)Metro Istanbul
History
Planned openingJune 2025; 1 year's time (2025-06)
Technical
Line length9.64 km (5.99 mi)
Number of tracks2
Track gauge1,435 mm (4 ft 8+12 in) standard gauge
Electrification1,500 V DC Overhead line

The M10 is a rapid transit line in the Asian part of the Istanbul Metro system that leads to Sabiha Gökçen Airport. Initially named and tendered as the M10 Pendik Merkez–Fevzi Çakmak, with the full line being named as the M10 Pendik Merkez–Sabiha Gökçen Airport, the line was supposed to complete the link between Pendik railway station and the M4ᴀ extension branch of the M4 line. The tender of this project was later cancelled on 3 January 2018 [1] and on 30 September 2022, a contract was signed with the new contractor company, with a value of ₺2.896.691.000 and works restarted in November 2022. [2] It is expected to open in June 2025.

Starting from the Pendik railway station, the line will head northeast, cut orthogonally the M4ʙ extension branch of the M4 line at Kaynarca Merkez station, join the M4ᴀ extension branch of the M4 line just before Fevzi Çakmak–Hastane station, and continue to Sabiha Gökçen Airport.

Stations

All stations are underground.

No Station Connections Notes
1 Pendik Merkez Marmaray High Speed Train (YHT)

İETT Bus: 16, 16A, 16D, 17, 132, 132A, 132B, 132D, 132E, 132F, 132G, 132H, 132K, 132P, 132V, 133A, 133AK, 133GP, 133K, 133KT, 132T, 132Ü, 133Ş, 251, KM3, KM10, KM13, KM18, KM24, KM26, KM27, KM28, KM33, KM37, KM72, KRB3, MR60

Park and Ride facility
2 Kaynarca Merkez Line M4 M4ʙ

İETT Bus: 130A, 130E, 130Ş, 130ŞT, 132F,132T,133K,133T, 500L, 500T, E-9, KM2,KM10, KM11, KM12, KM13, KM17, KM24, MR60

3 Fevzi Çakmak–Hastane Line M4 M4

İETT Bus: 16KH, 132P, 132V, 132Y, KM29

4 Yayalar–Şeyhli Line M4 M4

İETT Bus: 16KH, 132, 132A, 132B, 132D, 132E, 132H, 133GP, 133Ü, E-10, KM18, KM25, KM27, KM28, KM29

5 Kurtköy Line M4 M4

İETT Bus: 16KH, 132, 132A, 132B, 132D, 132E, 132H, 133GP, 133Ü, E-10, KM18, KM25, KM27, KM28, KM29, KM37

6 Sabiha Gökçen Airport Line M4 M4

İETT Bus: E-3, E-9, E-10, E-11

References

  1. ^ "6 metro projesinde ihale iptali". Milliyet (in Turkish). Retrieved 2018-01-03.
  2. ^ "KADIKÖY'DEN TUZLA'YA METRO" (in Turkish). Retrieved 2022-10-04.