Line 2 | |
---|---|
Overview | |
Status | Operational |
Owner | Changchun |
Locale | Changchun, Jilin, China |
Termini | |
Stations | 21 |
Service | |
Type | Rapid transit |
System | Changchun Rail Transit |
Services | 1 |
Operator(s) | Changchun Rail Transit Corporation |
History | |
Opened | 30 August 2018 |
Technical | |
Line length | 24.9 km (15.47 mi) [1] |
Number of tracks | 2 |
Character | Underground |
Track gauge | 1,435 mm (4 ft 8+1⁄2 in) |
Line 2 of the Changchun Rail Transit ( Chinese: 长春轨道交通2号线; pinyin: Chángchūn Guǐdào Jiāotōng Èr Hào Xiàn) is a rapid transit line running from west to east Changchun.
Phase 1 of Line 2 started operation on 30 August 2018. It is 20.5 km long with 18 stations. [2]
The western extension to Auto Park opened on 8 October 2021. [1] The extension is 4.36 km in length. [3]
Segment | Commencement | Length | Station(s) | Name |
---|---|---|---|---|
Shuangfeng — Dongfang Square | 30 August 2018 | 20.5 km (12.74 mi) [2] | 18 | Phase 1 |
Shuangfeng — Qiche Gongyuan | 8 October 2021 [1] | 4.36 km (2.71 mi) [3] | 3 | Western extension |
Station name | Connections | Distance km |
Location | ||||
---|---|---|---|---|---|---|---|
English | Chinese | ||||||
Auto Park | 汽车公园 | Luyuan | |||||
Jieda Avenue | 捷达大路 | ||||||
West Lake | 西湖 | ||||||
Shuangfeng | 双丰 | 6 | 2.18 | 2.18 | |||
Changchun West Railway Station | 长春西站 |
6 CJ ~ JH Tram 55 CRT |
1.52 | 3.70 | |||
Xinglongpu | 兴隆堡 | 2.09 | 5.79 | ||||
West Ring Road | 西环城路 | 1.41 | 7.20 | ||||
Heping Street | 和平大街 | 1.14 | 8.34 | ||||
Wanfu Street | 万福街 | Tram 54 | 0.82 | 9.16 | |||
Jingyang Square | 景阳广场 | 0.86 | 10.02 | ||||
Jiefang Overpass | 解放桥 | 3 | 1.07 | 11.09 | Luyuan / Chaoyang | ||
Jianshe Square | 建设广场 | 0.80 | 11.89 | Chaoyang | |||
Wenhua Square | 文化广场 | 0.75 | 12.64 | ||||
Jiefang Avenue | 解放大路 | 1 | 1.36 | 14.00 | Chaoyang / Nanguan | ||
Pingyang Street | 平阳街 | 0.78 | 14.78 | Nanguan | |||
Nanguan | 南关 | 1.12 | 15.90 | ||||
Jilin Avenue | 吉林大路 | 4 | 1.31 | 17.21 | Erdao | ||
Dongsheng Street | 东盛大街 | 0.99 | 18.20 | ||||
East Ring Road | 东环城路 | 1.46 | 19.66 | ||||
Changqing | 长青 | 1.27 | 20.93 | Erdao / Nanguan | |||
Dongfang Square | 东方广场 | 1.38 | 22.31 | Erdao | |||
An eastern extension to Zhaojiagang East is under construction. The extension is 10.607 km in length. [4] It's scheduled to open in 2025.
2号线运营里程增长4.4公里,达到24.9公里
线路全长4.36km,共设车站3座,均为地下站