From Wikipedia, the free encyclopedia
Line 1
Line 1 train leaving Hongzuizi station
Overview
StatusOperational
Owner Changchun
Locale Changchun, Jilin, China
Termini
Stations15
Service
Type Rapid transit
System Changchun Rail Transit
Services1
Operator(s) Changchun Rail Transit Corporation
History
Opened30 June 2017; 6 years ago (2017-06-30)
Technical
Line length18.14 km (11.27 mi) [1]
Number of tracks2
CharacterUnderground
Track gauge1,435 mm (4 ft 8+12 in)

Line 1 of the Changchun Rail Transit ( Chinese: 长春轨道交通1号线; pinyin: Chángchūn Guǐdào Jiāotōng Yī Hào Xiàn) is a rapid transit line running from north to south Changchun. It opened on 30 June 2017. This line is 18.14 km long with 15 stations. [1] [2]

Opening timeline

Segment Commencement Length Station(s) Name
North Ring Road — Hongzuizi 30 June 2017 18.14 km (11.27 mi) [1] 14 Phase 1
Changchun Railway Station 26 January 2019 infill station 1

Service routes

Stations

Station name Connections Distance
km
Location
English Chinese
North Ring Road 北环城路   8  0.00 0.00 Kuancheng
Qingfeng Road 庆丰路 1.19 1.19
Yikuang Street 一匡街 1.31 2.50
Changchun Railway Station (North) 长春站北   CJ ~  JH    CB ~  BA  Changchun railway station CCT
  4 
1.12 3.62
Changchun Railway Station 长春站   CJ ~  JH    CB ~  BA  Changchun railway station CCT
  3 
0.75 4.37
Shengli Park 胜利公园 0.93 5.30
Renmin Square 人民广场 1.42 6.72 Chaoyang / Nanguan
Jiefang Avenue 解放大路   2  1.00 7.72
Northeast Normal University 东北师大 1.57 9.29
Gongnong Square 工农广场 1.44 10.73
Fanrong Road 繁荣路 1.23 11.96
Weixing Square 卫星广场   3  0.80 12.76
Municipal Government 市政府 1.48 14.24 Nanguan
Huaqing Road 华庆路   6  1.09 15.33
Hongzuizi 红嘴子 1.08 16.41

References

  1. ^ a b c 长春地铁1号线通车试运营. 中国新闻网 (in Chinese). 2017-06-30. Archived from the original on 2019-10-07. Retrieved 2021-11-27.
  2. ^ 长春地铁1号线达到试运营评估8个标准要求. 新华网 (in Chinese). 23 May 2017. Retrieved 7 June 2017.[ dead link]