The Kanpur Monorail was a proposed monorail system for the city of Kanpur. [1] [2]
There are three lines proposed in phase I are as follows: [3]
Total length of Phase I would be 63.0 km.
Other lines which are being proposed in addition to Phase I are: [4]
Feasibility study has been completed for Phase I corridors. Work was predicted to start after 2016. [3] As of 2021 [update] no work has commenced.