The Embraer EMB 314 Super Tucano (English: Super
Toucan), also named ALX or A-29, is a Brazilian
turboprop light
attack aircraft designed and built by
Embraer as a development of the
Embraer EMB 312 Tucano. The A-29 Super Tucano carries a wide variety of weapons, including
precision-guided munitions, and was designed to be a low-cost system operated in low-threat environments.[2]
In addition to its manufacture in Brazil, Embraer has set up a production line in the United States in conjunction with
Sierra Nevada Corporation for the manufacture of A-29s to export customers.
During the mid-1980s, Embraer was working on the
Short Tucano alongside a new version designated the EMB-312G1, carrying the same Garrett engine. The EMB-312G1 prototype flew for the first time in July 1986. However, the project was dropped because the Brazilian Air Force was not interested in it. Nonetheless, the lessons from recent combat use of the aircraft in Peru and Venezuela led Embraer to keep up the studies. Besides a trainer, it researched a helicopter attack version designated "helicopter killer" or EMB-312H.[3] The study was stimulated by the unsuccessful bid for the US military
Joint Primary Aircraft Training System program. A proof-of-concept prototype flew for the first time in September 1991. The aircraft features a 1.37 m (4.5 ft) fuselage extension with the addition of sections before and after of the cockpit to restore its center of gravity and stability, a strengthened airframe, cockpit pressurization, and stretched nose to house the more powerful
PT6A-67R (1,424
shp or 1,062
kW) engine. Two new prototypes with the PT6A-68A (1,250 shp or 930 kW) engine were built in 1993. The second prototype flew for the first time in May 1993 and the third prototype flew in October 1993.[4]
The request for a light attack aircraft was part of the Brazilian government's
Amazon Surveillance System project. This aircraft would fly with the
R-99A and
R-99B aircraft then in service and be used to intercept illegal aircraft flights and patrol Brazil's borders. The ALX project was then created by the Brazilian Air Force, which was also in need of a military trainer to replace the
Embraer EMB 326GB Xavante. The new aircraft was to be suited to the Amazon region (high temperature, moisture, and precipitation; low military threat). The ALX was then specified as a
turboprop engine plane with a long range and autonomy, able to operate night and day, in any meteorological conditions, and able to land on short airfields lacking infrastructure.[5]
In August 1995, the Brazilian Ministry of Aeronautics awarded Embraer a $50 million contract for ALX development. Two
EMB-312Hs were updated to serve as ALX prototypes. These made their initial flights in their new configuration in 1996 and 1997, respectively. The initial flight of a production-configured ALX, further modified from one of the prototypes, occurred on 2 June 1999. The second prototype was brought up to two-seater configuration and performed its first flight on 22 October 1999. The changes had been so considerable that the type was given a new designation, the EMB-314 Super Tucano.[4] The total cost of the aircraft development was quoted to be between US$200 million and US$300 million.[6]
The aircraft differs from the baseline
EMB-312 Tucano trainer aircraft in several respects. It is powered by a more powerful 1,600 shp (1,200 kW)
Pratt & Whitney Canada PT6A-68C engine (compared to the EMB-312's 750 shp (560 kW) powerplant); has a strengthened airframe to sustain higher g loads and increase fatigue life to 8,000–12,000 hours in operational environments; a reinforced landing gear to handle greater takeoff weights and heavier stores load, up to 1,550 kilograms (3,420 lb); Kevlar armour protection; two internal, wing-mounted .50 cal. machine guns (with 200 rounds of ammunition each);[7] capacity to carry various ordnance on five weapon hardpoints including Giat NC621 20 mm cannon pods, Mk 81/82 bombs,
MAA-1 Piranha air-to-air missiles (AAMs), BLG-252 cluster bombs, and SBAT-70/19 or LAU-68A/G rocket pods on its underwing stations; and has a night-vision goggle-compatible "glass cockpit" with hands-on-throttle-and-stick (
HOTAS) controls; provision for a datalink; a video camera and recorder; an embedded mission-planning capability; forward-looking infrared; chaff/flare dispensers; missile approach warning receiver systems and radar warning receivers; and zero-zero ejection seats.[8] The structure is corrosion-protected and the side-hinged canopy has a windshield able to withstand
bird strike impacts up to 270 kn (500 km/h; 310 mph).[9]
In 1996, Embraer selected the Israeli firm
Elbit Systems to supply the mission avionics for the ALX. For this contract, Elbit was chosen over
GEC-Marconi and Sextant Avionique. The Israeli company supplies such equipment as the mission computer, head-up displays, and navigation and stores management systems.[10]
On 13 October 2010, the Super Tucano A-29B had passed the mark of 48,000 hours since 21 July 2005 on full-scale wing-fuselage structural
fatigue tests, conducted by the Aeronautical Systems Division, part of the
Aeronautics and Space Institute at the Structural Testing Laboratory. The tests involve a complex system of hydraulics and tabs that apply pressure to the aircraft structure, simulating air pressure from flying at varying altitudes. The simulation continued for another year to complete the engine-fatigue life test and crack-propagation studies for a damage-tolerance analysis program of conducted by Embraer and the Aeronautics and Space Institute.[11][12]
Embraer developed an advanced training and support system suite called Training Operational Support System (TOSS) an integrated computational tool composed of four systems:
computer-based training enabling the student to rehearse the next sortie on a computer simulation; an aviation mission planning station, which uses the three-dimensional (3D) visuals to practice planned missions and to check intervisibility between aircraft and from aircraft and other entities; a mission debriefing station employing real aircraft data to play back missions for review and analysis; and a
flight simulator.[13] MPS and MDS was enhanced with MAK's 3D visualization solution to support airforces pre-existing data, including
GIS, Web-based servers and a plug-in for custom terrain formats.[14]
In April 2023, the manufacturer announced the A-29N, a variant intended for
NATO nations. The A-29N will include NATO-required equipment,
data link communications and be fitted for single-pilot operation. Available simulators used for training will incorporate
virtual reality,
augmented reality and
mixed reality technology.[1]
Operational history
Afghanistan
In 2011, the Super Tucano was declared the winner of the US
Light Air Support contract competition over the
Hawker Beechcraft AT-6B Texan II.[18] The contract was cancelled in 2012 citing Hawker Beechcraft's appeal when its proposal was disqualified during the procurement process,[19] but rewon in 2013. Twenty of these light attack aircraft were purchased for the
Afghan Air Force (AAF).[20] The first four aircraft arrived in Afghanistan in January 2016, with a further four due before the end of 2016. Combat-ready Afghan A-29 pilots graduated from training at
Moody Air Force Base,
Georgia, and returned to Afghanistan to represent the first of 30 pilots trained by the
81st Fighter Squadron at Moody AFB. A fleet of 20 A-29s would be in place by 2018, according to a senior U.S. defense official. The Pentagon purchased the Super Tucanos in a $427 million contract with
Sierra Nevada Corp. and Embraer, with the aircraft produced at Embraer's facility on the grounds of
Jacksonville International Airport in
Jacksonville,
Florida.[21]
The first four aircraft arrived at
Hamid Karzai International Airport on 15 January 2016.[22] Prior to the A-29's delivery, the Afghan Air Force lacked close air support aircraft other than attack helicopters.[23] In 2017, the AAF conducted roughly 2,000 airstrike sorties, about 40 a week. The AAF had a record high in October with more than 80 missions in a single week. By March 2018, the AAF had 12 A-29s in service. On 22 March 2018, the AAF deployed a
GBU-58 Paveway II 250 lb (113.4 kg) bomb from an A-29 in combat, marking the first time the service had dropped a laser-guided weapon against the
Taliban.[24]
Fall of Kabul
In August 2021, during the
2021 Taliban offensive and the
Fall of Kabul, some Afghan pilots fled the country, taking an unknown number of aircraft, including A-29s, with them.[25]
An
Afghan Air Force A-29 crashed in Uzbekistan's
Surxondaryo Region; two pilots ejected and landed with parachutes.[26] Initially it was reported shot down by Uzbekistan air defenses, then the Prosecutor General's office in Uzbekistan issued a statement saying that an Afghan military plane had
collided mid-air with an
Uzbekistan Air ForceMiG-29, finally it retracted the statement about the mid-air collision.[27] At least one Super Tucano was captured by the
Taliban in the
Mazar-i-Sharif International Airport.[28][29]
Brazil
In August 2001, the
Brazilian Air Force awarded Embraer a contract for 76 Super Tucano / ALX aircraft with options for a further 23. A total of 99 aircraft were acquired from a contract estimated to be worth U$214.1 million; 66 of these aircraft are two-seater versions, designated A-29B. The remaining 33 aircraft are the single-seat A-29 ALX version.[30] The first aircraft was delivered in December 2003. By September 2007, 50 aircraft had entered service.[31] The 99th, and last, aircraft was delivered in June 2012.[32]
Sivam programme
One of the aircraft's main missions is border patrol under the
Sivam programme, particularly to act against drug trafficking activities. On 3 June 2009, two Brazilian Air Force A-29s, guided by an
Embraer E-99, intercepted a
Cessna U206G inbound from
Bolivia in the region of
Alta Floresta d'Oeste; after exhausting all procedures, one of the A-29s fired a warning shot from its 12.7 mm machine guns, after which the Cessna followed the A-29s to
Cacoal airport. This incident was the first use of powers granted under the Shoot-Down Act, which was enacted in October 2004 to legislate for the downing of illegal flights. A total of 176 kg of pure
cocaine base paste, enough to produce almost a
ton of cocaine, was discovered on board the Cessna; the two occupants attempted a ground escape but were arrested by
federal police in
Pimenta Bueno.[33]
Operation Ágata
On 5 August 2011, Brazil started Operation Ágata, part of a major "Frontiers Strategic Plan" launched in June, with almost 30 continuous days of rigorous military activity in the region of Brazil's border with Colombia; it mobilized 35 aircraft and more than 3,000 military personnel of the
Brazilian Army,
Brazilian Navy, and Brazilian Air Force surveillance against drug trafficking,
illegal mining and logging, and trafficking of wild animals. A-29s of 1 / 3º Aviation Group (GAV), Squadron Scorpion, launched a strike upon an illicit airstrip, deploying eight 230 kg (500 lb) computer-guided
Mk 82 bombs to render the airstrip unusable.[34]
Multiple
RQ-450 UAVs and several E-99s were assigned for night operations to locate remote jungle airstrips used by drug smuggling gangs along the border. The RQ-450s located targets for the A-29s, allowing them to bomb the airstrips with a high level of accuracy using
night vision systems and
computer systems calculating the impact points of munitions.[35]
Operation Ágata 2
On 15 September 2011, Brazil launched the Operation Ágata 2 on the borders with
Uruguay,
Argentina, and
Paraguay. Part of this border is the infamous
Triple Frontier. A-29s from
Maringá,
Dourados, and
Campo Grande, and
Brazilian upgradedNorthrop F-5 Tiger II/F-5EMs from
Canoas, intercepted a total of 33 aircraft during Operation Ágata 2 in this area.[36] Brazilian forces seized 62 tons of narcotics, made 3,000 arrests, and destroyed three illicit airstrips, while over 650 tons of weapons and explosives have been seized.[37]
Operation Ágata 3
On 22 November 2011, Brazil launched the Operation Ágata 3 on the borders with Bolivia,
Peru, and Paraguay. It involved 6,500 personnel, backed by 10 ships and 200 land patrol vehicles, in addition to 70 aircraft, including fighter, transport, and reconnaissance aircraft; it was the largest Brazilian coordinated action involving the Army, Navy, and Air Force against illegal trafficking and organized crime, along a border strip of almost 7,000 km.
A-1 (AMX), Northrop F-5 Tiger II/ F-5EM and A-29s from
Tabatinga,
Campo Grande,
Cuiabá,
Vilhena, and
Porto Velho were employed in defending air space, supported by
airborne early warning and controlE-99, equipped with a 450-km-range radar capable of detecting low-flying aircraft, and
R-99,
remote sensing and
surveillance.[38] On 7 December 2011, Brazilian
Ministry of Defence informed that drug seizures were up by 1,319% over the last six months, compared to prior six months.[39]
Chile
In August 2008, the
Chilean Air Force signed a contract valued at $120 million for 12 A-29Bs.[40] The contract includes a broad integrated logistic support package and an advanced training and operation support system (TOSS), covering not only the aircraft, but also an integrated suite for ground support stations. The FACH's TOSS consists of three systems: a mission planning station in which instructor and student program all phases of flight, setting the various parameters of each phase along with navigation, communications, goals, and simulations; a mission debriefing station empowering students with the ability to review all and each flight aspects and phases, enabling to look at the errors and correct them for their next mission; and a flight simulator.[41]
The first four A-29Bs arrived in December 2009 while further deliveries took place in the following year.[42] They are based at Los Cóndores Air Base (45 km from
Iquique) and are used for tactical instruction at the 1st Air Brigade for the Aviation Group #1,[43] the fully digital cockpit allows students to do a smooth transition between the
T-35 Pillán (basic trainer) and the
F-16.[42] In 2018, six additional A-29B, along with ground support equipment, arrived; four more units were received two years later.[44]
Colombia
A total of 25 Super Tucanos (variant AT-29B) were purchased by the Colombian Air Force in a US$234 million deal, purchased directly from Embraer. On 14 December 2006, the first three aircraft arrived to the military airfield of
CATAM in
Bogotá; two more were delivered later that month, ten more in the first half of 2007, and the rest in June 2008.[45]
On 18 January 2007, a squadron of Colombian Air Force Super Tucanos launched the first-ever combat mission of its type, attacking
FARC positions in the jungle with
Mark 82 bombs. This attack made use of the Super Tucano's
constantly computed impact point capability; the aircraft's performance in action was a reported success.[46]
On 11 July 2012, the first Super Tucano was lost near
Jambalo during an anti-FARC operation; rebels claimed they shot it down with a .50 caliber (12.7 mm) machine gun, but the Colombian Air Force challenged the rebel group's claim after inspecting the wreckage.[47]
On 21 September 2010, Operation Sodoma in the
Meta department began, 120 miles south of the capital
Bogotá. FARC commander
Mono Jojoy was killed in a massive military operation on 22 September, after 25 EMB-314s launched seven tonnes of explosives on the camp, while some 600 special forces troops descended by rope from helicopters, opposed by 700 guerrillas; 20 guerrillas died in the attack.[49]
On 2 October 2010, during Operation Darién, Super Tucanos used infrared cameras to spot and bombard the FARC 57th front in the
Chocó Department, just a kilometer away from the Panama border. Five rebels, including several commanders, were killed.[50]
Anti-FARC operation Odiseo
On 15 October 2011, Operation Odiseo started with a total of 969 members of the
Colombian armed forces. A total of 18 aircraft participated in Operation Odiseo. On 4 November 2011, five Super Tucanos dropped 1000 lb (450 kg) and 250 lb (135 kg) bombs, plus high-precision smart bombs. This operation ended with the death of the leader of the Revolutionary Armed Forces of Colombia (Fuerzas Armadas Revolucionarias de Colombia, FARC),
Alfonso Cano. It was biggest blow in the history of the
guerrilla organization.[51]
Anti-FARC operation Frontera
At dawn of 22 February 2012, EMB-314s identified the camp of FARC's 57th Front, 15 km (9.3 mi) north of
Bojayá near the border with Panama. In Operation Frontera, Super Tucanos dropped two high-precision bombs, destroying the camp and killing six FARC rebels, including Pedro Alfonso Alvarado (alias "Mapanao"), who was responsible for the
Bojayá massacre in 2002, in which 119 civilians were killed.[52][53]
Espada de Honor War Plan
The Espada de Honor War Plan was an aggressive Colombian counterinsurgency strategy that aimed to dismantle FARC's structure, both militarily and financially. It targeted FARC leadership focusing on eliminating the 15 most powerful economic and military fronts.[54]
During Operacion Faraón, at the dawn of 21 March 2012, five Super Tucanos bombarded the FARC's 10th Front guerrilla camp in
Arauca, near the Venezuelan border, killing 33 rebels.[55][56] Five days later, in Operation Armagedón, nine Super Tucanos from
Apiay Air Base attacked the FARC's 27th front camp in
Vista Hermosa, Meta, using coordinates received from a guerrilla informant recruited by the police intelligence, launching 40 guided 500-lb bombs within three minutes, destroying the camp and killing 36 rebels.[57] In late May, Super Tucanos bombarded a
National Liberation Army camp located in rural Santa Rosa at
Bolívar Department.[58] On 31 May 2012, a bombardment over the Western Front of the ELN at an inhospitable area of the
Chocó Department killed seven rebels.[59] On 6 June 2012, during a minute and half bombardment over FARC's 37th front located in northern
Antioquia Department, five Super Tucanos dropped 250-kg bombs, killing eight rebels.[60]
In September, Super Tucanos provided reconnaissance and
close air support during an "Omega" operation, during which seven terrorists were gunned down and four were captured, including "Fredy Cooper", the 7th front's leader of the Public Order Company.[61] On 5 September 2012, "Danilo Garcia", leader of the FARC's 33rd Front, was killed in a bombing raid; Danilo was considered "the right hand of supreme FARC leader alias Timochenko". Intelligence indicated that the bodies of 15 guerrillas may have been buried in the bombing.[62] Eight A-29s carried out an air strike on 27 September during Operación Saturno at the FARC's 37th front camp in the northwest of Antioquia Department, resulting in the death of Efrain Gonzales Ruiz, "Pateñame", leader of the 35th and 37th fronts, and 13 others.[63][64] In April 2013, two Super Tucanos bombarded the FARC's 59th front
fort in
Serranía del Perijá municipality
Barrancas, La Guajira.[65]
Dominican Republic
In August 2001, Embraer announced the signing of a contract with the
Dominican Republic for 10 Super Tucanos, to use for pilot training,
internal security,
border patrol and counter-narcotics trafficking missions. The order was reduced to eight aircraft in January 2009, for a total amount of US$93 million.[66] The first two aircraft were delivered on 18 December 2009, three arrived in June 2010, and the remaining three in October 2010.[67][unreliable source?]
In February 2011,
Dominican Republic Air Force Chief of Operations Col. Hilton Cabral stated: "since the introduction of the Super Tucano aircraft and ground-based radars, illicit air tracks into the Dominican Republic had dropped by over 80 percent."[68] In August 2011, the Dominican Air Force said that since taking delivery of the Super Tucanos in 2009, it has driven away drug flights to the point that they no longer enter the country's airspace.[69] In May 2012, the Dominican president
Leonel Fernández gave a cooperative order for the armed forces to support a fleet of Super Tucanos for the antidrug fight on
Haiti.[70]
Ecuador
The
Ecuadorian Air Force operates 18 Super Tucanos; they are established at
Manta Air Base in two squadrons: 2313 "Halcones" (used for border surveillance and
flight training) and 2311 "Dragones" (used for counterinsurgency).[71] Ecuadorian Super Tucanos use the PT-6A-68A (1,300 shp) engine.[72] On 23 March 2009, Embraer announced that negotiations over a nine-month-old agreement with the Ecuadorian Air Force had been completed. The deal covers the supply of 24 Super Tucanos to replace Ecuador's aging fleet of Vietnam-era
Cessna A-37 Dragonfly strike aircraft, and help reassert control over the country's airspace.[73]
In May 2010, after receiving its sixth Super Tucano under a $270 million contract, Ecuador announced a reduction in its order from 24 to 18 Super Tucanos to release funds to buy some used
South African Air ForceDenel Cheetah C fighters. By cutting its order for the EMB-314, the Defence Ministry says the accrued savings would better allow it to bolster the air force's flagging air defence component.[74]
Honduras
On 3 September 2011, the head of the
Honduran Air Force (Fuerza Aérea Hondureña, or FAH), said that Honduras was to procure four Super Tucanos.[75] On 7 February 2012, the Honduran government informed the Brazilian Trade Ministry of its interest in acquiring a large number of Super Tucanos.[76] However, due to the economic situation, the government was forced to repair their aging aircraft inventory, instead of purchasing eight EMB-314s.[77]
On 17 October 2014, the Ministry of Foreign Affairs and International Cooperation announced the go-ahead for acquiring two new A-29s by the FAH following approval from the country's National Council for Security and Defence. As part of the deal, six of the FAH's surviving EMB-312A Tucanos, acquired in 1984, will be refurbished and upgraded by Embraer. Originally operated only by the Academia Militar de Aviación at Palmerola for training, they have recently been armed for counter-narcotics missions. Just three were airworthy as the Brazilian deal was signed for the aircraft to be upgraded and the other three be made airworthy again. Together with the two newly acquired Super Tucanos, this will boost efforts to maintain security within the country.[78][79]
Indonesia
In January 2010,
Indonesian Air Force commander Air Marshal
Imam Sufaat stated that
Indonesia had split the competition, designating the Super Tucano as their preferred OV-10 replacement. Indonesia signed a memorandum of understanding with Embraer at the Indo Defense 2010 exhibition in Jakarta. Indonesia initially ordered eight Super Tucanos, including ground-support stations and a logistics package, with an option for another eight on the same terms; the first were scheduled to arrive in 2012. Defense Minister
Purnomo Yusgiantoro added that state aircraft maker
PT Dirgantara Indonesia would perform maintenance work, and may also manufacture some components. While Indonesia could have made a unified choice to replace its OV-10 light attack and
BAE Hawk Mk.53 trainer fleets with a multirole jet, the demands of forward air control and counterinsurgency wars give slower and more stable platforms an advantage.
On 10 July 2012, Indonesia ordered a second set of eight Super Tucanos, along with a full flight simulator, bringing their order total to 16. In August 2012, Indonesia received the first four planes from the initial batch at a ceremony held in its facility in
Gavião Peixoto, São Paulo, Brazil.[80] Deliveries of the second batch of Super Tucanos were delayed by over seven months.[81] In September 2014, the second batch left Brazil on their ferry flight to Malang
Abdul Rachman Saleh Air Base in East Java; they will be based at the Malang air base on Indonesia's Java island and operated by Skadron Udara 21 as part of the 2nd Wing. The final four A-29Bs left Brazil on 15 February 2016, passing through Malta-Luqa International Airport on 21 February and ultimately arriving at Indonesia's Malang Abdul Rachman Saleh Air Force Base on 29 February 2016.[82] One aircraft was lost in a crash on 10 February 2016,[83][84] and a further two in crashes on 16 November 2023.[85]
Lebanon
The Pentagon first proposed to provide to
Lebanon a contract for 10 EMB-314s in 2010.[86] Six Tucanos with 2,000
advanced precision-kill weapon systems went to Lebanon via the US LAS program, but financed by Saudi Arabia at US$462 million.[87] The first two were delivered in October 2017, with four more in June 2018.[88]
Mauritania
Negotiations for the acquisitions of Super Tucanos started in December 2011.[89] On 28 March 2012 at Chile's FIDAE defense and air show, Embraer announced sales of undisclosed numbers of aircraft to Mauritania.[90] On 19 October 2012, Embraer delivered the first EMB-314, fitted with a
FLIR Safire III infrared turret for border surveillance operations.[91]
Nigeria
In November 2013, Nigeria showed interest in acquiring twelve new Super Tucanos. Three aircraft were bought from the Brazilian Air Force inventory in 2017.[92] In April 2017, the United States indicated that it would be moving forward with a deal to sell up to 12 of the aircraft for up to US$600 million, ending delays that had been caused by human-rights concerns.[93] In August 2017, the US Department of State approved of the sale of 12 aircraft and associated supplies and weapons.[94][95][96]
In November 2018, Nigeria purchased 12 Super Tucanos from Sierra Nevada for $329 million, all of which can be fitted with forward-looking infrared systems. They were delivered to Nigeria in October 2021.[97][98][99]
Philippines
The
Philippine Air Force (PAF) considered the acquisition of six Super Tucanos to replace the aging
OV-10 Bronco. In late 2017, Defense Secretary
Delfin Lorenzana signed the contract to purchase six for the Close Air Support Aircraft acquisition project as included in the AFP Modernization Program's Horizon 1 phase.[100] On 13 October 2020, six A-29Bs were turned over to the PAF.[101] They were inducted with the
16th Attack Squadron, 15th Strike Wing.[101] Defense Secretary Delfin Lorenzana was reportedly considering buying six more A-29Bs.[102] By 2024, the PAF intends to operate 24 aircraft across two squadrons. 12 aircraft are to be delivered by 2022, and six by 2024, allowing the PAF to operate close air support, intelligence, surveillance, reconnaissance, and light attack missions.[103]
On 9 December 2021, PAF A-29Bs conducted airstrikes on terrorist encampments as part of Oplan Stinkweed in Palimbang, Sultan Kudarat.[104]
In 2008, the
U.S. Navy began testing the Super Tucano at the behest of the
U.S. Special Operations Command for its potential use to support special warfare operations,[109] giving it the official U.S. designation A-29B.[110]
Islamic Republic of Afghanistan
In 2009, the Super Tucano was offered in a U.S. Air Force competition for 100 counterinsurgency aircraft.[111] On 12 April 2010, Brazil signed an agreement to open negotiations for the acquisition of 200 Super Tucanos by the U.S.[112] On 16 November 2011, the
AT-6 was excluded from the
LAS program, effectively selecting the Super Tucano. According to
GAO: "the Air Force concluded that HBDC had not adequately corrected deficiencies in its proposal... that multiple deficiencies and significant weaknesses found in HBDC's proposal make it technically unacceptable and results in unacceptable mission capability risk".
Hawker Beechcraft's protest against its exclusion was dismissed.[113][114] While the contract award was disputed, a stop-work was issued in January 2012.[115] For this procurement, the avionics were supplied by
Elbit Systems of America.
Sierra Nevada, the US-based prime contractor built the Super Tucano in Jacksonville, Florida.[116] The
81st Fighter Squadron, based at
Moody Air Force Base, was reactivated on 15 January 2015 and received the A-29s and provided training to pilots and maintainers from the Afghan Air Force.[117] They were turned over to the Afghans in batches from December 2018.[118]
In August 2017, the US Air Force conducted the "Light Attack Experiment" to evaluate potential light attack aircraft. Following this, it decided to continue experimenting with two non-developmental aircraft, the Textron Aviation
AT-6B Wolverine derivative of the T-6 Texan II and the Sierra Nevada/Embraer A-29 Super Tucano. Tests conducted at
Davis-Monthan Air Force Base, Arizona between May and July 2018, examined logistics requirements, weapons and sensor issues, and future interoperability with partner forces.[119] The Air Force expects to have the information it needs to potentially buy light attack aircraft in a future competition, without conducting a combat demonstration, based on data collected during the first round of the experiment and future data anticipated to be collected in the next phase of experimentation. The A-29 had a fatal crash while over the Red Rio Bombing Range,
White Sands Missile Range.[120]
In August 2011, the
Guatemalan Air Force requested credit approval of $166 million to buy six EMB-314s, control centers, radar, and equipment, in the context of a programme named "C4I".[123] In October 2012, the Guatemalan Congress approved a loan for the C4I programme, including the purchase of six A-29s, to be granted by Brazilian and Spanish banks (BNDES and BBVA).[124] The deal was finalized in April 2013.[125] The first two aircraft were expected to arrive in April 2014, followed by two units in 2015 and two more in 2016.[126] However, the president of Guatemala cancelled the order in November 2013.[127] In January 2015, the Guatemalan defence minister disclosed that his country was looking at purchasing two aircraft from Embraer.[128]
Libya
The
Libyan government is interested in buying up to 24 Super Tucanos.[129]
Mozambique
Brazil planned to donate three EMB-312s for
Mozambique Air Force, which may also acquire three Super Tucanos. In 2016, the donation deal was canceled by the Brazilian government.[130][131]
Paraguay
In October 2009, the President of Paraguay was leaning toward buying Super Tucanos.[132] According to Paraguayan newspaper La Nación, the commander of the
Paraguayan Air Forces has started to procure six EMB-314 aircraft.[133] In May 2012, the Paraguayan Air Force selected the Super Tucano to reinforce the air force capabilities.[134] However, after the
impeachment of Fernando Lugo, all negotiations were temporarily suspended.[135]
Peru
In March 2011, a Brazilian federal representative spoke on the
Unasur treaty, stating that it could promote the surveillance integration in the
Amazon Basin and facilitate the sale of 12 Super Tucanos and upgrade kits for 20 Peruvian
EMB-312s.[136] In November 2011, Peru's defence minister announced the Super Tucano purchase was suspended in favor of the Korean
KT-1.[137] On 14 February 2012, Brazil's Ministry of Defence said Peru is considering buying ten Super Tucanos.[138] However, in November 2012, a government-to-government contract was signed for 20 KT-1s.[139] In 2012, the governments of Peru and Brazil restarted negotiations for the acquisition of 12 A-29s to replace A-37 Dragonflys that are due to withdraw in 2017.[140]
Portugal
Portugal has shown interest in acquiring at least 10 aircraft.[141] In 2022, the
Portuguese Air Force reportedly proposed to purchase 12 second-hand A-29s from Brazilian Air Force reserves.[142] In August 2022 the Chief of Staff of the Air Force stated the service's interest in acquiring propeller aircraft for combat missions.[143]
Suriname
Suriname is interested in purchasing between two and four Super Tucanos for light attack roles.[144]
Thailand
Embraer has also quoted
Thailand as a potential customer for the type.[145]
UAE
In September 2010, it was announced that Brazil and the
United Arab Emirates were working a deal that includes sales of Super Tucanos.[146] It was reported in early 2015 that the UAE is negotiating with Embraer the purchase of 24 Super Tucanos, the deal would include six aircraft from Brazilian Air Force inventory for immediately delivery.[147] Since then an Emirati company, Callidus, bought a Brazilian company, Novaer, founded by an engineer involved in the Tucano project, and started a project for an alternative aircraft strongly resembling it, the
Callidus B-250.
Ukraine
In August 2019, a Ukrainian military delegation visited Embraer's military division in São Paulo and flew the Super Tucano.[148] In October 2019, the President of Ukraine,
Volodymyr Zelensky, in a meeting with Brazilian President
Jair Bolsonaro, informed that his country would buy the Super Tucano.[149] In December 2022, the Brazilian media reported a Ukrainian interest in the Super Tucano, to equip its air force for the
Russo-Ukrainian War; however, the sale was blocked by the Bolsonaro administration.[150] A diplomatic effort by the United States to persuade the president-elect of Brazil,
Luiz Inácio Lula da Silva, to unblock the deal, has been reported.[150]
Missed contracts
Bolivia
After the U.S. ban on Czech aircraft
Aero L-159 Alca export on 7 August 2009, the Bolivian Defense Minister said they were considering six aircraft from Brazil or China with comparable role as the L-159.[151] On 9 October 2009, it was announced that China would manufacture six
K-8 for Bolivia, to be used for antidrug operations, at a price of $9.7 million per aircraft.[152]
El Salvador
In November 2010, the President of the Legislative Defense Committee of
El Salvador stated they would purchase an estimated 10 EMB-314s.[153] It was postponed in February 2011 by lack of funds.[154] In 2013, the El Salvador Air Force acquired 10 Cessna A-37 retired from Chilean Air Force.[155]
Iraq
In January 2015 a report in
Jane's Defence Weekly said the Iraqi Air Force would receive 24 Super Tucanos, six directly from Brazilian Air Force stocks, and some from an order placed by the
United Arab Emirates.[156]
Senegal
In September 2012, Senegal was reportedly in a procurement process with Embraer.[157] In April 2013, the Brazilian minister of Defence disclosed that Senegal was the 4th African nation to order the Super Tucano,[158] in the following day, Embraer confirmed the order, which included a training system for pilots and mechanics (TOSS) in Senegal, bringing autonomy to that country's Air Force in preparing qualified personnel.[159] However, the deal was not finalized and Senegal opted for four Korean KT-1s.[160]
Sweden
Sweden proposed replacing its
Saab 105trainer aircraft with Super Tucanos, if Brazil chose to buy the
Gripen NG.[161] In May 2021, the Swedish Armed Forces announced that it chose
Grob G 120TP as the new trainer and it will enter service in 2023.[162]
United Kingdom
Elbit Systems and Embraer offered the EMB-314 for the United Kingdom's basic trainer contest.[163] However, the Beechcraft T-6C Texan II formed part of the preferred bid for the requirement in October 2014.[164]
Venezuela
In February 2006, a 36-unit sale for
Venezuela fell through because it was thought the U.S. would block the transfer of U.S.-built components.[165] Venezuelan President
Hugo Chávez claimed the U.S. had pressured Brazil not to sign the contract.[166]
Afghan Air Force – 26 A-29s ordered, deliveries took place from 2016 to late 2020.[167][168] They were built by Sierra Nevada Corporation and Embraer in Jacksonville, Florida, and supplied to Afghanistan via the U.S. Air Force's Light Air Support (LAS) program. The first was delivered to the U.S. service in September 2014.[169][170] The first four A-29s arrived at Hamid Karzai International Airport in Kabul on 15 January 2016.[171][168] After the
fall of Kabul to the Taliban, it is unclear if A-29s will continue to be operated by Afghans.[172][173]
National Air Force of Angola – six aircraft ordered.[174] Deliveries were scheduled to begin in early 2012;[175] but the first three were delivered on 31 January 2013.[176]
Ghana Air Force – 5 aircraft ordered in 2015.[190] The total value of the contract was $88million with a loan from
BNDES, which also includes logistics support and training for pilots and mechanics in Ghana. The first aircraft were expected to arrive in late 2016, and will be used as advanced training, border surveillance and
internal security missions.[191] Ghana's Air Force plans to acquire four more A-29s with light attack, reconnaissance and training capabilities; if finalized, the deal will increase Ghana's A-29 fleet to nine.[192]
Indonesian Air Force – 16 aircraft ordered & delivered, one lost in a crash February 2016,[194][195] a further two lost in crashes in November 2023.[85] The first four aircraft of the first batch of eight were delivered as of August 2012.,[196] the delivery of the second batch of four aircraft was delayed till September 2014.[81] A total of 16 were ordered in 2011[197] with deliveries taking place in 2012, 2014, 2015 and 2016.[198] In March 2012, Indonesian Ministry of Defense informed the possibility of a future joint production, further modernization and sales in the Asia-Pacific region.[199]
Nigerian Air Force – 12 aircraft on order.[204] First batch with 6 aircraft delivered on the 22nd of July 2021, and the delivery was completed with the arrival of the final batch to Nigeria in October 2021.[205][206]
EP Aviation – part of
Academi (formerly Blackwater) – at least one twin-seater variant for pilot training (delivered in February 2008), possible further orders for
counter-insurgency role.[209][210] Later sold in 2010 to Tactical Air Support in Reno, NV.
United States Navy leased an aircraft for testing, as part of the Imminent Fury program.[211]
On February 10, 2016 an
Indonesian Air Force Embraer EMB-314 Super Tucano crashed in
Malang,
East Java, on suburb area near
Abdul Rachman Saleh Air Base. The aircraft (TT-3108) was on a routine test flight. Both pilots and two civilians died in the accident.
On August 15, 2021, an Embraer 314 aircraft belonging to the Afghan Armed Forces and a MiG 29 aircraft belonging to the Armed Forces of Uzbekistan collided in the Sherabad district of the Surkhandarya region of the Republic of Uzbekistan.
On November 16, 2023, two
Indonesian Air Force Embraer EMB-314 Super Tucano crashed on the slopes of
Mount Bromo, near Keduwung Village, Puspo District,
Pasuruan,
East Java. The aircraft (TT-3103 and TT-3111) were part of four-aircraft formation with another two Super Tucanos, and on training flight under cloudy weather condition. The four aircraft were flying in a box formation when they suddenly encountered heavy clouds, obstructing visibility; TT-3103 and TT-3111 allegedly collided with mountain slope when the four aircraft broke the formation and attempted to get out of the clouds. Another two Super Tucanos landed safely on
Abdul Rachman Saleh Air Base. All four pilots of both planes died in the accident.[214]
Internal: (2×) 12.7 mm (0.50 in) 1,100 rounds per minute
FN Herstal or
U.S. OrdnanceM3P machine guns as designated "M3W", one fixed mounted in each wing with 250 rounds per M3.
pod: 1 20 mm (0.79 in) 650 rounds per minute
GIAT M20A1 cannon below the fuselage.
pod: 1 12.7 mm (0.50 in)
FN Herstal HMP for M3P machine gun under each wing
pod: up to 4 7.62 mm (0.30 in) 3,000 rounds per minute
Dillon AeroM134 Minigun (under development) under wings.[221]
Hardpoints: 5 (two under each wing and one under fuselage centreline) with a capacity of 1,550 kg (3,300 lb)
^
abEmbraer entrega o 100º Super Tucano (in Portuguese), Agência Paulista de Promoção de Investimentos e Competitividade, 26 May 2009, archived from
the original on 3 August 2012, retrieved 9 April 2012.
^"Jefe guerrillero de la región". El Meridiano de Cordoba (in Spanish). 28 September 2012.
Archived from the original on 5 July 2015. Retrieved 28 September 2012.
^"Super Tucano para o Paraguai", Tecnologia & Defesa (in Portuguese), 13 October 2009,
archived from the original on 22 April 2012, retrieved 20 December 2011.
^Hoyle, Graig.
"World Air Forces 2013"(PDF). London, UK: Fight International. p. 21.
Archived(PDF) from the original on 2 November 2013. Retrieved 27 December 2013.
^"A-29 – Super Tucano" (in Portuguese). Rio de Janeiro: FAB. 3 December 2012. Archived from
the original on 3 December 2012. Retrieved 25 August 2019.
^
ab"Super Tucano"(PDF). Defense Systems. Embraer. Archived from [Spec_TUCANO_abril_09.pdf the original] (PDF) on 24 September 2015. Retrieved 25 August 2019. {{
cite web}}: Check |url= value (
help)
Guevara, Iñigo. "Operation Fenix – Columbian Airstrike at Dawn". Air International, Vol. 74, No. 4, May 2008, pp. 52–55. Stamford, UK: Key Publishing. ISSN 0306-5634.
Rivas, Santiago and Juan Carlos Cicalesi. "Type Analysis: Embraer EMB-312/314 Tucano and Super Tucano". International Air Power Review, vol. 22, 2007, pp. 60–79. Westport,
CT: AIRtime Publishing.
ISBN1-880588-79-X. ISSN 1473-9917.
Wall, Robert (23 April 2012). Velocci, Anthony (ed.). "Guided Trajectory". Aviation Week & Space Technology. New York, USA: McGraw-Hill: 79–80.
ISSN0005-2175.