From Wikipedia, the free encyclopedia
Zhengzhou Metro
Overview
OwnerCity of Zhengzhou
Locale Zhengzhou, Henan Province, China
Transit type Rapid transit
Number of lines11
Number of stations217
Daily ridership1.1767 million (2021 average) [1]
1,229,135 (2018 Peak) [2]
Website www.zzmetro.com
Operation
Began operationDecember 28, 2013; 10 years ago (2013-12-28) [3]
Operator(s)Zhengzhou Metro Group Co. Ltd.
Technical
System length344 km (213.8 mi)
Track gauge1,435 mm (4 ft 8+12 in) (standard gauge)
ElectrificationDC 1500 V overhead line
System map
Physical layout
Zhengzhou Metro
Traditional Chinese鄭州地鐵
Simplified Chinese郑州地铁

Zhengzhou Metro ( simplified Chinese: 郑州地铁; traditional Chinese: 鄭州地鐵; pinyin: Zhèngzhōu Dìtiě) is a rapid transit rail network serving urban and suburban districts of Zhengzhou, the capital city of Henan province. It is operated by the state owned Zhengzhou Metro Group. As of December 2023, the network has 11 operational lines, with a network length of 344 km (213.8 mi) and 217 stations. Opened on 28 December 2013, [3] it is the first metro system in Henan province, and 18th in mainland China.

History

Evolution of Zhengzhou Metro

"Project 7401"

The history of the metro network in Zhengzhou dates back to 1974, when the first metro project in Zhengzhou was planned. It was called as the "Project 7401", since it was the first project approved by the CPC Henan Provincial Committee in 1974. The project was designed for both civilian and military use, as a single track metro line in peacetime, and could be used for civil defense during war. The first phase was planned to start at Huayuan Road (near Zijingshan), then move westward via Erqi Square, and ends at the Cable Factory on Funiu Road, with 6 stations. Part of the planned route was similar to the route of the current Line 1. Construction began in 1975, and stopped in 1980, when the project was finally called off. Some sections of the tunnels and one station in Bishagang (not the current Bishagang station) had been completed then. The completed station was transformed into an underground department store in 1982. [4]

The First Round of Construction

In 2000, the planning of the current Zhengzhou Metro system was started. The plan had been adjusted several times, and was finalized in 2008. The first phase of the system, including Line 1 and Line 2, was approved by National Development and Reform Commission (NDRC) in February 2009. [5] [6] Construction of Line 1 started on 6 June 2009 [7] and Line 2 started construction on 28 December 2010. [8] As planned, Line 1 and Line 2 commenced operations on 26 December 2013 and 19 August 2016 respectively. On January 12, 2017, Chengjiao line started operation. It is in through services with Line 2 and allows the system to serve the Zhengzhou Xinzheng International Airport. [9]

The Second Round of Construction

In April 2014, the NDRC published the Construction Plan of Zhengzhou Rapid Transit System (2014-2020), marking the start of the second round of construction. The plan includes the Line 1 Phase II, Line 2 Phase II, Line 3 Phase I, Line 4, and Line 5, with a total length of 120.7 kilometres (75.0 mi). [10] The second phase of Line 1 was put into use on 12 January 2017, [9] Line 5 opened on 20 May 2019. Line 2 Phase II opened on 28 December 2019. Line 3 and Line 4 opened on 26 December 2020.

The Third Round of Construction

In April 2019, the NDRC approved the Phase III Construction Plan of Zhengzhou Rapid Transit System (2019-2024), marking the start of the third round of construction. [11] The plan includes the Line 3 Phase II, and the first phase of Line 6, Line 7, Line 8, Line 10, Line 12 and Line 14 with a total length of 159.6 kilometres (99.2 mi). [12] Line 10 and Line 14 are already under construction. [13] Line 14 was opened on 19 September 2019. [14]

Accidents and incidents

  • On 22 February 2013, four workers were buried at the construction site of Tongbailu station (current Wuyigongyuan station) due to collapse. Two of them were killed and the other two injured. [15]
  • On 31 July 2018, 12 workers at the construction site of Zhengzhou People's Hospital station on Line 5 were sent to hospital for feeling headache and nausea caused by lack of oxygen. [16]

July 2021 floods

Beginning on July 17, 2021, heavy rains occurred in Henan. The rainfall in Zhengzhou from 20:20 on July 17 to 20:20 on July 20 reached 617.1 mm (24.30 in), [17] of which the rainfall within an hour from 16:00 to 17:00 on July 20 reached 201.9 mm (7.95 in). It broke through historical records, far exceeding the "24-hour rainfall exceeding 200 mm (7.87 in)" extreme rainstorm level designated by the National Meteorological Center. [18]

On July 20, many stations of Zhengzhou Metro were flooded with heavy water, which caused serious water accumulation. [19] A landslide accident occurred at a construction site of Longzihu Xi [20] of Line 12 in the morning, but no casualties were caused. [21]

At about 18:00 on July 20, rainwater entered the tunnel between Haitansi station and Shakoulu station of Line 5. A train was trapped in the tunnel and water entered. [22] The water level in the car once reached the chest position, and the passengers stranded in the car were trapped for several hours, until they were rescued and left the carriage. [22] The floods in Zhengzhou Metro killed 14 people. [23]

Zhengzhou Metro closed several stations, and then announced the suspension of operation of the whole metro network at 18:00 on July 20. [24]

Line 1, Line 2 (Liuzhuang to Nansihuan section) and Chengjiao line reopened on September 12. Line 2 (Jiahe to Liuzhuang section), Line 3, Line 4 and Line 5 reopened on September 15. Due to equipment replacement, Line 14 reopened later on 29 August 2022. [25]

Lines in operation

Line Termini
(District)
Commencement Newest
Extension
Length (km) Stations
  1  Henan University of Technology
( Zhongyuan)
New Campus of Henan University
( Jinshui)
2013 2019 41.2 [26] 30
  2  Jiahe
( Huiji)
Nansihuan [a]
( Guancheng)
2016 2019 30.9 22
  3 
Henan Sports Center
( Huiji)
Binhe Xincheng Nan
( Guancheng)
2020 2023 31.8 25
  4 
Laoyachen
( Huiji)
Langzhuang
( Guancheng)
2020 29.3 27
  5 
Loop line
Yuejigongyuan
( Zhongyuan)
Yuejigongyuan
( Zhongyuan)
2019 40.4 32
  6 
Jiayu
( Xingyang)
Changzhuang
( Zhongyuan)
2022 16.7 10
  10 
Zhengzhou Railway Station
( Erqi)
Zhengzhouxi Railway Station
( Xingyang)
2023 21.8 [27] 12
  12 
Longzihu Dong
( Jinshui)
Lianghu
( Guancheng)
2023 16.5 [28] 11
  14 
Tielu
( Zhongyuan)
Lianhu
( Zhongyuan)
2019 2023 7.455 [14] 4 [b]
  Zhengxu 
Chang'an Lu Bei
( Xinzheng)
Xuchangdong [29]
( Jian'an)
2023 67.13 26
  Chengjiao  Nansihuan [a]
( Guancheng)
Zhengzhou Hangkonggang Railway Station
( Zhongmu)
2017 2022 40.84 [30] 18 [c]
Total 344 217
  1. ^ a b Through operation between Line 2 and Chengjiao line is currently provided, meaning all trains of Chengjiao line through operate into Line 2 via Nansihuan station, but some trains of Line 2 still terminate here. However, Chengjiao line is planned to extend to the downtown via Shibalihe station and rename to Line 9 in future, henceforth splitting apart, and then the section from Nansihuan to Shibalihe will also be given back to Line 2.
  2. ^ Xushui and Shimindadao stations are not in operation.
  3. ^ Terminal 3 station is not in operation.

Line 1

Longzihu station of Line 1

Line 1 is a west–east line with a total length of 41.2 km (25.6 mi), [26] starting from Henan University of Technology and ending in New Campus of Henan University. It interchanges with Line 2 at Zijingshan. This line connects many important places or areas of the city, including Zhengzhou University, Zhengzhou railway station, Zhengdong New Area, Zhengzhou East railway station and the Longzihu College Area. CSR Zhuzhou supplied six-car Type B metro trains for Line 1 under a contract signed in January 2011. [31] The first phase, 26.2 km (16.3 mi) [32] long with 20 stations, is entirely underground and was opened in 2013. [33] On 12 January 2017, both east and west extensions of the line opened, adding 15.01 km (9.33 mi) and 9 stations to the line. [34] The color for Line 1 is red.

Line 2

Dongfenglu station of Line 2

Line 2, a north–south line with a total length of 30.9 kilometres (19.2 mi), starts from Jiahe in Huiji District and ends in Nansihuan in Guancheng, with 22 stations. [8] It interchanges with Line 1 at Zijingshan. The first phase of Line 2 ( Liuzhuang- Nansihuan), 20.649 kilometres (12.831 mi) [35] long with 16 stations, was opened on 19 August 2016. [36] The second phase (north extension, from Liuzhuang to Jiahe) was opened on 28 December 2019. The second phase is 10.25 kilometres (6.37 mi) [37] long with 6 stations. According to future plan, the southern terminus of Line 2 will be Shibalihe, which is currently operated as a station on Chengjiao line, after the completion of Line 9. The color for Line 2 is yellow.

Line 3

Line 3, began operation on 26 December 2020, is a northwest–southeast line. The color for Line 3 is orange.

Line 4

Line 4, began operation on 26 December 2020, is a northwest–southeast line. The color for Line 4 is light blue.

Line 5

Platform of Line 5 at Huanghelu station

Line 5, the first loop line in Zhengzhou Metro system, is 40.4 kilometres (25.1 mi) long with 32 stations. It runs mainly under Huanghe Road, Shangwu Outer Ring Road, Xinyi Road, Hanghai Road, Tongbai Road and Xizhan Road, forming a loop around the city center. Line 5 opened on 20 May 2019. [38] An infill station, Jingbeierlu station opened on 15 May 2021. [39] It is also the first metro line in Zhengzhou to use Type A metro trains, which were manufactured by CRRC Zhuzhou Locomotive. The color for Line 5 is green.

Line 6

Line 6, began operation on 30 September 2022, is a west–east line. The color for Line 6 is purple.

Line 10

Line 10, began operation on 28 September 2023, [27] is a west–east line. A further extension of Line 10 from Zhengzhouxi Railway Station to Zhengzhou Shangjie Airport (in Shangjie District of Zhengzhou) is under planning. [40] The color for Line 10 is brown.

Line 12

Line 12 began operation on 20 December 2023. [41] The color for Line 12 is blue.

Line 14

Line 14 is 7.455 kilometres (4.632 mi) [14] long with 6 stations (4 stations in operation). Line 14 was opened on 19 September 2019. [14] The color for Line 14 is light purple.

Zhengxu line

Zhengxu line, formerly known as Line 17 during planning, opened on 28 December 2023. The color for Zhengxu line is dark blue.

Chengjiao line

Mengzhuang station of Chengjiao line

Chengjiao line is a suburban metro line with a total length of 31.7 kilometres (19.7 mi), starting from Nansihuan in Guancheng and ending in Xinzheng International Airport, with 14 stations. [34] This line was opened on January 12, 2017. [42] The line connects the city with Longhu Town, Zhengzhou Airport Economy Zone and Zhengzhou Xinzheng International Airport. Trains on this line are currently in through operation with Line 2.

Chengjiao line has the same yellow color as Line 2 on the signs, although the system map on Zhengzhou Metro's website shows this line with the color of olive, [43] which is the color for Line 9. According to the plan, Chengjiao line will be operated as a part of Line 9 in the future.

Future lines

Note: The names of the stations in the following tables are proposed names and future changes are highly possible.

Lines under construction

Currently, 6 lines are under construction, including Line 6 (Phase I), Line 7 (Phase 1), [44] Line 8 (Phase 1), [45] Line 10 (Phase I), Line 12 (Phase 1), [46] Zhengxu line (also known as Line 17). [47]

Future Network Map

List of Lines under Construction

Line Phase or section Termini
(District)
Length (km) Stations Planned date of opening [48] Route description
  6  East section of Phase I Changzhuang Qinghua Fuzhong [49] 22.5 [49] 18 [49] 2024 [48] Planned to be a southwest–northeast line when fully completed. The Phase I is the westernmost section, which connects Jiayu with the CCD area in the west of the city.
  7  Phase I Dongzhao
( Huiji)
Houzhai
( Erqi)
26.81 20 2024 [48] A north–south line across the city center, running almost in parallel to the west of Line 2.
  8  Phase I Tianjianhu
( Zhongyuan)
Lüboyuan
( Zhongmu)
50.63 [50] 27 [51] 2024 [48] An east–west line across the northern part of the urban area of Zhengzhou, connecting Zhongmu and Zhengzhou National High & New Technology Industries Development Zone in the northwest of the city.

Fares and tickets

Fares of Zhengzhou Metro are calculated by distance traveled, ranging from ¥2 (within 6 km (3.7 mi)) to ¥9 (the longest journeys within the current system). A journey shorter than 6 km (3.7 mi) costs ¥2; ¥1 is charged for every 7 km (4.3 mi) after 6 km (3.7 mi), every 8 km (5.0 mi) after 13 km (8.1 mi), and every 9 km (5.6 mi) after 21 km (13 mi). [52] The system is free of charge for elderly citizens in Zhengzhou with ages above 60 during non-peak hours and on public holidays. Children under the height of 130 cm (51 in) may ride for free when accompanied by an adult. There are also student fares, which are half the adult fare, for full-time students enrolled in primary or middle schools. [52]

Single journey ticket

Single journey tickets can be bought on the ticket vending machines at every station. The passenger has to tap it on the sensor on the ticket gate when entering and insert it into a slot at the exit gate where the ticket is reclaimed. From 1 June 2016, passengers can buy single journey tickets with WeChat or Alipay in advance and collect the tickets at stations. [53] [54]

In September 2017, the "Cloud Gate" service was launched, which allows passengers to enter and exit with barcodes generated with AliPay on smartphones. Currently the service is only available on 20 stations between Xiliuhu and Zhengzhou Sports Center of Line 1. [55]

Lü Cheng Tong

Lü Cheng Tong ( Chinese: 绿城通, literally: "Green City Pass") is a rechargeable contactless smart card which can be used on the metro and buses in Zhengzhou with discounts. A 5% discount is offered for taking Zhengzhou Metro using Lü Cheng Tong compared to using single journey tickets.

Rolling stock

A CRRC Zhuzhou made trainset on Chengjiao line

Line 1

Line 2 and Chengjiao Line

Line 5

Network Map


See also

References

  1. ^ "运送乘客237.1亿人次,新增运营里程1168公里…2021年城市轨道交通运营成绩单". 2022-01-13. Retrieved 19 July 2022.
  2. ^ "郑州地铁官方微博" (in Chinese (China)). 2018-11-03. Retrieved 2018-11-21.
  3. ^ a b "郑州地铁1号线今日正式试运营 开启中原城市新格局". 2013-12-28.
  4. ^ "7401工程:郑州人33年前的地铁梦" [Project 7401: the Metro Dream of Zhengzhou 33 Years Ago] (in Chinese (China)). 2007-11-12. Retrieved 2018-11-21.
  5. ^ "郑州地铁获国务院批准 每公里成本近6亿今年开工" (in Chinese (China)). 大河网 Dahe.cn. 2009-02-13. Retrieved 2018-09-12.
  6. ^ "地铁未来将出现在郑州市" (in Chinese (China)). 中广网 CNR.cn. 2009-02-13. Retrieved 2018-09-12.
  7. ^ 郑州地铁1号线正式开工 时速最高可达80公里 (in Chinese). 大河网. 2009-06-08.
  8. ^ a b 郑州地铁2号线一期工程开工 计划2015年7月1日试运营 (in Chinese). 河南日报. 2010-12-29.
  9. ^ a b "郑州地铁1号线二期和城郊铁路一期将开通试运营" [The Trial Operations of Zhengzhou Metro Line 1 (Phase II) and Chengjiao Line are Set to Start]. www.zhengzhou.gov.cn (in Chinese). Retrieved 2018-11-21.
  10. ^ "郑州市城市轨道交通近期建设规划(2014~2020 年)" [The Construction Plan of Zhengzhou Rapid Transit System (2014-2020)] (PDF) (in Chinese (China)). National Development and Reform Commission. Retrieved 2018-11-22.
  11. ^ "郑州轨交三期规划获批 总投资超1000亿". www.yicai.com. Retrieved 2019-05-08.
  12. ^ "郑州市城市轨道交通第三期建设规划(2019-2024 年)" (PDF).
  13. ^ 朱宝君. "郑州城市轨道交通三期规划来了 大地铁时代值得你期待". hn.chinaso.com. Retrieved 2019-05-08.
  14. ^ a b c d "初心勾画绿城梦 匠心施彩民生线 14号线一期工程定于9月19日实现初期运营". 2019-09-19.
  15. ^ "郑州地铁1号线工地坍塌4人被埋 目前2死2伤" (in Chinese). 2013-02-22. Retrieved 2018-11-22.
  16. ^ "关于郑州市轨道交通5号线工程 "7.31"安全生产事件的情况通报". www.zzmetro.cn (in Chinese). 2018-08-02. Retrieved 2018-11-14.
  17. ^ "三天降雨量617.1mm什么概念?317个西湖倒进郑州!".
  18. ^ "五问河南强降雨:这场罕见的暴雨还要持续多久?-中新网". www.chinanews.com. Retrieved 2021-07-20.
  19. ^ "暴雨积水漫灌进地铁站内如长河 河南郑州部分地铁站停运". news.ifeng.com. Retrieved 2021-07-20.
  20. ^ "郑州地铁在建12号线龙子湖西站发生涌水险情 无人员伤亡". 2021-07-20.
  21. ^ "郑州地铁在建12号线龙子湖西站发生涌水险情 无人员伤亡". 2021-07-20.
  22. ^ a b 澎湃新闻 (2021-07-20). "郑州地铁五号线被困乘客所在车厢水位已下降,救援正紧张进行". news.sina.ct om.cn. Retrieved 2021-07-20.
  23. ^ "郑州通报地铁5号线"7.20事件":14人不幸遇难". 2021-07-27.
  24. ^ "受持续暴雨影响 郑州地铁全线停运-中新网". www.chinanews.com. Retrieved 2021-07-20.
  25. ^ "郑州地铁14号线一期29日起恢复运营".
  26. ^ a b "郑州市轨道交通1号线35KV及以下供电系统设施2020—2022年委外维修项目比选公告". 2019-09-24. 郑州市轨道交通1号线全长41.2km,设站30座,均为地下车站。其中,1号线一期工程线路长约26.2km,设站20座...1号线二期工程线路全长约15 km,设站10座...
  27. ^ a b "倒计时!郑州地铁10号线一期将于今日11:58开通". 2023-09-28. Archived from the original on 2023-09-28.
  28. ^ "郑州市轨道交通12号线一期即将开通 运营首末班时间".
  29. ^ "一轨连双城 "牵手"谱新篇". 2023-12-29.
  30. ^ "郑州地铁1号线二期和城郊铁路一期将开通试运营". 2017-01-11.
  31. ^ "Zhengzhou metro Line 1 train contract awarded". Railway Gazette International. 3 February 2011.
  32. ^ "中原首条地铁载客运营 古城郑州驶入地铁时代". 2013-12-29.
  33. ^ "郑州地铁28日中午12点正式迎客 20个站点全开门". henan.qq.com (in Chinese). 2013-12-27. Retrieved 2018-09-12.
  34. ^ a b "郑州地铁进入3.0时代 两条新线"开跑"-新华网河南". www.ha.xinhuanet.com. Retrieved 2017-01-30.
  35. ^ "郑州地铁2号线19日开通 1、2号线换乘攻略". 2016-08-18.
  36. ^ "郑州地铁2号线今日开通 "十"字交叉双地铁时代来了". henan.people.com.cn (in Chinese). 2016-08-19. Retrieved 2018-09-12.
  37. ^ "地铁2号线二期全线实现"洞通"" (in Chinese). Zhengzhou Daily. 2018-11-07. Retrieved 2018-11-13.
  38. ^ "郑州地铁5号线开通 "绿腰带"环城一周" (in Chinese (China)). www.chinanews.com. 2019-05-20. Retrieved 2019-05-20.
  39. ^ "地铁5号线经北二路站今日启用". 2021-05-15. Archived from the original on May 15, 2021.
  40. ^ "『郑州』地铁10号线二期最新进展".
  41. ^ 郑州地铁 (Zhengzhou Metro) (2023-12-19). "智汇绿都 慧塑活力 郑州市轨道交通12号线一期正式初期运营". Retrieved 2023-12-20.
  42. ^ "郑州地铁1号线二期和城郊铁路一期将开通试运营". www.zhengzhou.gov.cn (in Chinese). Retrieved 2018-04-13.
  43. ^ "地铁线路规划图". Retrieved 2019-09-18.
  44. ^ "郑州地铁7号线本月开工 2024年底建成". 2020-06-09.
  45. ^ "2020郑州地铁8号线开工时间- 郑州本地宝". zz.bendibao.com. Retrieved 2021-03-20.
  46. ^ sina_mobile (2020-10-26). "郑州地铁12号线一期工程11个站点已实质性开工". henan.sina.cn. Retrieved 2021-03-20.
  47. ^ "南四环至郑州南站城郊铁路二期工程首台盾构顺利"起航"". www.zzmetro.cn (in Chinese). 2017-07-14. Retrieved 2018-09-12.
  48. ^ a b c d "总投资1166.3亿元,郑州6条地铁项目新进展来了,附通车时间". 2022-08-05.
  49. ^ a b c "除地铁6号线外 郑州这些在建地铁也都有了新进展". 2021-09-28.
  50. ^ "郑州市轨道交通3号线二期、6号线、7号线一期、8号线一期、9号线二期、10号线、11号线临时用电工程设计招标公告". www.zzmetro.cn (in Chinese). 2016-11-25. Retrieved 2018-11-14.
  51. ^ "郑州地铁3、6、8、10、12号线路发布最新公示 8号线一期西延更长 6号线一期北延较短". 2019-07-31. Retrieved 2019-08-15.
  52. ^ a b "票价政策" [Fares Policy]. www.zzmetro.com (in Chinese). Retrieved 2018-11-22.
  53. ^ "【重磅】郑州很快可以用微信、支付宝买地铁票了!" (in Chinese). 2016-05-27. Retrieved 2018-11-22.
  54. ^ "用支付宝可以在郑州坐地铁了 不用排队、带钢镚" (in Chinese). 2016-06-01. Retrieved 2018-11-22.
  55. ^ "郑州地铁"云闸机"上线手机扫码乘坐1号线" ["Cloud Gates" Launched on Zhengzhou Metro Line 1] (in Chinese). Dahe Daily. 2017-09-21. Retrieved 2018-11-22.

External links