Los Angeles International Airport has more than 150 gates in nine passenger terminals arranged in the shape of the letter U or a horseshoe. On the landside of the airport, LAX Shuttle route A buses allow passengers to move between all terminals. On the airside, various pedestrian corridors allow passengers to move between all terminals on foot without having to exit and reenter airport security. Additionally, by early 2025, the airport will be served by the LAX Automated People Mover, which will connect terminals to one another on the landside, along with providing connections to the LAX Consolidated Rent-A-Car Facility, parking facilities, and the LAX/Metro Transit Center station, which will be served by the Los Angeles Metro Rail system and public bus routes. [1] In addition to these terminals, there are 2 million square feet (190,000 m2) of cargo facilities.

History

The basic layout of the airport dates back to 1958 when the architecture firm Pereira & Luckman was contracted to plan the re-design of the airport for the " jet age." The plan, developed with architects Welton Becket and Paul Williams, called for a series of terminals and parking structures in the central portion of the property, with these buildings connected at the center by a huge steel-and-glass dome. [2] The dome was never built but the Theme Building built in the central area became a focal point visible to people coming to the airport. [3]

Each terminal originally had a common design: a satellite building out in the middle of the ramp, reached by tunnels from a separate ticketing building. [4] Originally the tunnels were supposed to have moving walkways. Still, they were eliminated due to funding cuts. Instead, they received mosaics which came to be known as the LAX color tunnels, to make the 300–500-foot (91–152 m) walk feel shorter. [5]

Terminals 7 and 8 (built for United Airlines) were the first to be completed on June 25, 1961, [6] followed by Terminals 3 ( Trans World Airlines), 4 ( American Airlines) and 5 ( Western Airlines) in September. [7] Terminal 2 opened as the international terminal in December. Terminal 6, a "consolidated" terminal for other domestic carriers, was the last to open. [7]

A significant airport expansion came in the early 1980s, ahead of the 1984 Summer Olympic Games. In November 1983 a second-level roadway was added, separating departing and arriving travelers; [8] Terminal 1, which had been planned in the 1958 design, opened in January 1984; [9] and the new Tom Bradley International Terminal opened in June 1984. [10] Throughout the 1980s, the original terminals (2, 3, 4, 5, 6 and 7) were also rebuilt with connector buildings that transformed the separate satellite and ticketing buildings into one continuous terminal.

Inter-terminal connections

While connections between some terminals had existed for years, by 2023, as a resulting of the ongoing Landside Access Modernization Program (LAMP), passengers could walk through all the main terminals without needing to exit the secure area and be rescreened:

  • A corridor connects Terminals 1, 2, and 3
  • Skybridges connect the Tom Bradley International Terminal (Terminal B) to Terminals 3 and 4
  • A tunnel connects Terminals 4, 5, and 6
  • A ground-level walkway connects Terminals 6, 7, and 8. [11]

There are also airside shuttles connecting some of these terminals; for instance, some airlines have check-in counters at Terminal 1 and then provide shuttle bus service to the distant Bradley West gates. [12] The satellite regional terminal is only accessible by an airside shuttle bus that connects to Terminals 4 and 5.

Terminal 1

Terminal 1 has 14 gates: Gates 9, 11A, 11B, 12A, 12B, 13–16, 17A, 17B, 18A, 18B and the bus gate. [13] As of May 2023, this terminal serves as an operating base for Southwest Airlines (Southwest operates point-to-point routes with bases instead of hubs). The terminal also has check-in facilities for Air Transat, Allegiant Air, Breeze Airways, Condor, Cayman Airways, Lynx Air, Sun Country Airlines and VivaAerobús. After clearing security in Terminal 1, passengers for all airlines other than Southwest board a shuttle bus to the West Gates of the Tom Bradley International Terminal, where the flights operate. [14]

Terminal 1 was built in 1984 for Pacific Southwest Airlines (PSA). The terminal was last extensively renovated in 2018, providing updates to the security screening area, terminal areas and baggage handling. The terminal was also expanded in 2021 to fill in the area between terminals 1 and 2, adding a post-security bridge between the terminals, a bus gate to take passengers to boarding gates in the Tom Bradley International Terminal, and will provide future connection to the APM. [15]

Former tenants of the terminal include Air California, Air Hawaii, AirTran Airways, America West Airlines, Braniff, Morris Air, Pacific Southwest Airlines, Piedmont Airlines, StatesWest Airlines, TranStar Airlines and US Airways.

Terminal 2

Terminal 2 concourse

Terminal 2 has 13 gates: Gates 20, 21, 21B, 22, 23A, 23B, 24, 25A, 25B, 26A, 26B, 27 and 28. [16] As of June 2022, this terminal, along with Terminal 3, serves as a hub for Delta Air Lines. [14] The terminal is also used by WestJet. Due to construction, passengers traveling from Terminal 2 check in at Terminal 3.

Terminal 2 was built in 1962 and was the original international terminal. It was completely torn down and rebuilt in stages between 1984 and 1988 at a cost of $94 million. [17] The rebuilt terminal was designed by Leo A Daly. [18] Terminal 2 has CBP (Customs and Border Protection) facilities to process arriving international passengers, but the facility is currently not in operation, and will not reopen until security and usability renovations are completed. [19]

Former tenants of the terminal include Air Canada, Air L.A., Air Mobility Command, Air New Zealand, Air Resorts, Líneas Aéreas Allegro, Asiana, ATA Airlines, Aviacsa, Avianca, Braniff International Airways, Caledonian Airways, Canadian Pacific Air Lines, CAAC Airlines, Capitol Air, Carnival Air Lines, Denver Ports of Call, Hawaiian Airlines, KLM, LTU International, MarkAir, Miami Air International, National Airlines (1934–1980), Northwest Airlines, Omni Air International, Pacific Express, Pan Am, Pan American Airways, People Express Airlines, Ryan International Airlines, Skyservice Airlines, VASP, Virgin Atlantic, World Airways and the majority of the International carriers before the Tom Bradley International Terminal opened.

A Delta Sky Club operates on the upper level of Terminal 2; space originally built for a second lounge is currently in use as offices.

Terminal 3

Terminal 3 check-in area

Terminal 3 has 15 gates: Gates 30A, 30B, 31A, 31B, 32A, 32B, 33, 34A, 34B, 35, 36, 37A, 37B and 38. [20] As of June 2022, this terminal, along with Terminal 2, serves as a hub for Delta Air Lines. [14] The terminal also has check-in facilities for Delta's SkyTeam partner, Aeroméxico; after clearing security in Terminal 3, Aeroméxico passengers board a shuttle to the Tom Bradley International Terminal where the flights operate. [14]

Terminal 3 opened in 1961 and was Trans World Airlines' (TWA's) terminal. Eastern Air Lines initially also shared space as a tenant. The terminal was expanded in 1970 to accommodate widebody operations and between 1980 and 1987, which included a new passenger connector building and baggage system connected to the original satellite. [21] It formerly housed some American Airlines flights after that airline acquired Reno Air and TWA in 1999 and 2001, respectively. Virgin America was also based here from 2008–2017 until the Alaska Airlines merger moved them to Terminal 6. US Airways was housed [22] in Terminal 3 after renovations were started in Terminal 1 from February 2014 until eventually, all American flights were moved to Terminal 4.

Terminal 3 was closed, partially demolished and reconstructed between November 2020 and April 2022 as part of Delta Air Lines' $1.9 billion "Delta Sky Way at LAX" modernization project. [23] The pace of construction was accelerated due to the decline in passenger air travel as the result of the global COVID-19 pandemic. [24]

Former tenants of the terminal include Air California, AirTran Airways, American Airlines, ATA Airlines, Bonanza Air Lines, Braniff International Airways, Eastern Air Lines, Golden West Airlines, The Hawaii Express, Midway Airlines, Midwest Airlines, Northeastern International Airways, Pacific East Airlines, Pacific Express, Reno Air, Southwest Airlines, Spirit Airlines, Trans World Airlines, US Airways, Virgin America, Virgin Australia, and Western Pacific Airlines.

Terminal 3 has one Delta SkyClub located off the walkway between Terminal 2 and 3. [20] A Delta One Lounge is scheduled to open in 2024.

Terminal 4

Terminal 4 check-in area

Terminal 4 has 16 gates: Gates 40, 41, 42A, 42B, 43–45, 46A, 46C, 47A, 47B, 48A, 48B, 49A and 49B. [25] As of June 2022, this terminal, the Regional Terminal, and part of Terminal 5, serve as a hub for American Airlines. [14]

Terminal 4 was built in 1961, was expanded in 1983 by adding a connector from the ticketing areas to the original satellite, [21] and was renovated in 2002 at the cost of $400 million in order to improve the appearance and functionality of the facility. The renovation was designed by Rivers & Christian. [26] Some international departures operate at TBIT.

American Airlines and American Eagle have more gates than any other airline at LAX, with 28 ( American Airlines operates from 32 gates in total, including 9 gates at the American Eagle satellite terminal, 4 dedicated gates at Terminal 5, as well as 4 rotating gates at Tom Bradley International Terminal).

American Airlines has two clubs in the terminal: one Admirals Club and one Flagship Lounge.

Former tenants of the terminal include: Air California, Alaska Airlines, America West Airlines, KLM, Midwest Airlines, Northwest Airlines, Piedmont Airlines, Pride Air, Reno Air, Sun Aire Lines and Wings West Airlines.

Terminal 5

Terminal 5 has 17 gates: Gates 50, 51A, 51B, 53A, 53B, 54A, 54B, 55A, 55B, 51A–51D, 57–59 and a bus gate. Gates 52A–52I are located at the Regional Terminal. [27] As of June 2022, the terminal serves the base for JetBlue's Los Angeles focus city and, along with Terminal 4, serves as a hub for American Airlines. [14] The terminal is also used by Spirit Airlines.

Terminal 5 opened in 1962, and Western Airlines occupied this terminal until Western was merged with Delta on April 1, 1987. Terminal 5 was redesigned by Gensler, [28] expanded to include a connector building between the original satellite and the ticketing facilities and remodeled from 1986 through early 1988. It was unofficially named 'Delta's Oasis at LAX' with the slogan 'Take Five at LAX' when construction was completed in the summer of 1988. Northwest Airlines moved all operations to Terminal 5 and Terminal 6 alongside Delta on June 30, 2009, as part of its merger with the airline.

Delta, which had been based for decades in Terminal 5 (with additional gates in Terminal 6), moved to Terminals 2 and 3 between May 12–17, 2017, in order to relieve overcrowding and provide better and easier transfers with its airline partners at Tom Bradley International Terminal. [29]

American Eagle flights operate from a satellite terminal that is located just east of Terminal 8. This terminal is accessed from a bus gate in Terminal 5, and has nine gates that supplement American's mainline operation at Terminals 4 and 5.

In July 2020, JetBlue announced that they would close their Long Beach operating base due to their routes underperforming there and because the officials at Long Beach refused to build a customs facility at LGB. As a result, JetBlue announced they would create a new operating base at LAX, as they planned a big expansion at the airport. JetBlue opened its LAX operating base on October 7, 2020, at Terminal 5. Because they moved their base to Los Angeles, they were able to expand domestically and internationally on the West Coast.

Former tenants of the terminal include Aeromexico, Air Jamaica, Air Tahiti Nui, Allegiant, British Caledonian, China Southern Airlines, Delta Air Lines, Ecuatoriana de Aviación, Frontier, Hawaiian Airlines, Mexicana, Northwest Airlines, SkyWest Airlines, Song, Sun Country, Swissair, TriStar Airlines and Western Airlines.

American Airlines has one Admirals Club in the terminal.

Terminal 6

Terminal 6 has 16 gates: Gates 60–63, 64A–64C, 65A–65C, 66, 67, 68A, 68B, 69A and 69B. [30] As of June 2022, the terminal serves as a hub for Alaska Airlines and is also used by Air Canada, Porter Airlines and small regional airlines Advanced Air and Southern Airways Express. [14]

The terminal opened as "Satellite 6" and "Ticketing Building 6" in November 1963 and marked the conclusion of the initial phase of passenger terminal construction at the airport. When it originally opened, it was a common use, multi-carrier terminal that supported the operations of Continental Airlines, Delta Air Lines, Pacific Air Lines and Pacific Southwest Airlines. [31] The original building was capable of handling six planes at one time.

In the early 1970s, Continental and Delta built the "Satellite Extension" to expand Satellite 6, adding additional gates to the south end of the building and reconfiguring the existing structure to accommodate the new "jumbo jet," the Boeing 747. When the project was complete, Satellite 6 was able to simultaneously handle eight planes: two 747s, four wide-bodied tri-jets, and two smaller planes such as the Boeing 707 or 727. [32] Four of these gates have two jetways, which can accommodate large aircraft. [33]

In 1982, Continental sponsored the Connector project, which joined the Ticketing Building to the Satellite and the Satellite Extension, adding additional gates and facilities. [34]

Prior to October 2014, United Airlines used the connector gates, supplementing its base at Terminal 7. Delta also leased some space from the Airport in Terminal 6, in addition to its base at Terminal 5. Most rotunda gates can feed arriving passengers into a sterile corridor that shunts them to Terminal 7's customs and immigration facility. On November 6, 2014, American Airlines moved US Airways flights from Terminal 3 into Terminal 6, taking 4 gates in the Connector Building. [35] On January 31, 2017, American Airlines relocated these 4 gates to Terminal 5 as part of the larger LAX Terminal relocation program. [36]

In April 2011, Alaska Airlines agreed to a deal with Los Angeles World Airports to renovate Terminal 6 and build an Alaska Lounge for first-class passengers. The airline moved its flights to Terminal 6 on March 20, 2012, and Spirit Airlines was relocated to Terminal 3. [37]

In July 2021, construction began on another round of refurbishments to the terminal. On the customer-facing front, the gate areas, departure lounges, Border Protection, and TSA Security areas are being refurbished/upgraded, and new jet bridges will be installed. Additionally, a drive-through bus gate will be added to ease transfers to other terminals. On the operations front, the apron paving, fuel lines and other airfield infrastructure will be upgraded. As construction progresses, different areas of the terminal will be closed to passengers, starting with the three gates at the southeast end. Construction is scheduled to conclude in 2023. [38]

There are two lounges in the terminal: an Air Canada Maple Leaf Lounge and an Alaska Airlines Lounge.

Former tenants of the terminal include American Airlines, Continental Airlines, Copa Airlines, Delta Air Lines, Eastern Air Lines, Frontier Airlines, Great Lakes Airlines, Hughes Airwest, Lufthansa, National Airlines, Pacific Air Lines, Pacific Southwest Airlines, Republic Airlines, SkyWest Airlines, Swift Aire Lines, Ted, United Airlines, Wardair, Virgin America, VivaAerobus and US Airways.

Terminal 7

Terminal 7/8 check-in area

Terminal 7 has 13 gates: Gates 70A, 70B, 71A, 71B, 72A, 72B, 73, 74, 75A, 75B, 76A, 76B and 77. [39] As of June 2022, this terminal, along with Terminal 8, serves as a hub for United Airlines. [14]

The terminal opened in 1962 and was expanded to accommodate widebody aircraft in 1970. [33] The terminal was expanded in 1982 with the addition of a connector building, which today consists of gates 70A-70B and 71A-71B. [33] Four of these gates have two jetways, which accommodate large aircraft. The interior of the terminal was renovated between January 1998 and June 1999 at a cost of $250 million, was designed by HNTB, and was constructed by Hensel Phelps Construction. Added were new gate podiums, increased size of gate areas, relocated concessions, expanded restrooms, new flooring, and new signage. [40] Also, the roof of the terminal was raised, and new, brighter light fixtures were added in order to provide more overall lighting. [41] In 2017, Terminal 7 underwent another renovation, with significant changes to concessions. The terminal also contains a United Club and a United Polaris Lounge. The terminal has a customs area on the arrivals floor, used by international United flights and Alaska Airlines flights in adjacent Terminal 6.

United Airlines has two lounges in the terminal: one United Club and one United Polaris Lounge.

Former tenants of the terminal include: Aspen Airways, Braniff, Imperial Airlines, Independence Air, Leisure Air, Los Angeles Airways, Texas International Airlines, Shuttle by United, Ted and Virgin Atlantic.

Terminal 8

Terminal 8 has 8 gates: Gates 80–85, 86A and 86B. [42] As of June 2022, the terminal, along with Terminal 7 serves as a hub for United Airlines. [14]

Terminal 8 was originally called Concourse 8 or Satellite 8 because it does not have its own passenger processing facilities (ticketing, security checkpoint or baggage claim) and relies on the facilities located in Terminal 7. [33] The building was redeveloped in 1982, ahead of the 1984 Olympics.

Tom Bradley International Terminal (Terminal B)

Wide view of Tom Bradley International Terminal (Terminal B)
Moving walkways inside the new south concourse of the Tom Bradley West Gates. The separated arrivals walkway on the second floor leads directly to U.S. Customs
Terminal B main concourse

The Tom Bradley International Terminal (TBIT), also referred as "'Terminal B'", [14] has 40 gates: Gates 130–225. [43] The terminal hosts more than 45 airlines, most of them are foreign carriers. All international arrivals are processed at this terminal with the exception of US preclearance flights. [14]

The massive terminal is separated into five different areas: North Concourse (9 gates: 130–135, 137, 139, 141); Bus Gates (6 gates: 136, 138, 140, 142, 144, 146); South Concourse (10 gates: 148, 150–157, 159); West Gates (15 gates: 201A, 201B, 202–208, 209A, 209B, 210A, 210B, 221, 225); and the Bus Port. [43] The Bus Gates and the Bus Port are used to shuttle passengers from the remote check-in area at Terminal 1, between Terminals B and 2, and between Terminal B and nine satellite gates located on the west side of the LAX airfield.

The Tom Bradley International Terminal has six lounges. Three are operated by the major airline alliances: Oneworld, SkyTeam and Star Alliance, the other three are operated by Emirates, Etihad Airways and Qantas. The West Gates building has space for lounges but is not yet in use.

History

The Tom Bradley International Terminal opened on June 18, 1984, just weeks before the start of the 1984 Summer Olympic Games. It is named in honor of Tom Bradley, the first African-American and longest-serving (20 years) mayor of Los Angeles, and a champion of LAX.

The building was added to the west end of the passenger terminal area between Terminals 3 and 4. Prior to this, Terminal 2 was the primary international terminal. During its construction, it was given the name "West Side Terminal" until its renaming upon completion.

By the early 2000s, airport managers grew concerned about LAX's future as an international gateway. The international terminal was aging, and many carriers had reduced flights to LAX in favor of more modern airports, such as San Francisco and Seattle/Tacoma. By 2007, LAX lost 12% of the seats on its weekly international departures. [44] At the same time, the airport was concerned that it would not be able to accommodate future larger commercial aircraft, the Airbus A380 and Boeing 747-8.

Airport management gave the old terminal a minor facelift in September 2006, adding new paging, air conditioning and electrical systems, along with new elevators, escalators and baggage carousels. Meanwhile, the southern-most runway, 7R/25L was shifted 55 feet (17 m) to the south to prepare it for the additional width of the Airbus A380 and add a parallel taxiway between the adjacent runway. Runway 7R/25L reopened on March 25, 2007, and the taxiway was completed in 2008.

On March 19, 2007, the Airbus A380 made its US debut with simultaneous landings at LAX and John F. Kennedy International Airport in New York City. [45] Commercial service with the Airbus A380 started on October 20, 2008, with Qantas service between LAX and Sydney. Because the Bradley Terminal was too small to accommodate the jet, the plane was serviced using the satellite gates located on the west side of the LAX airfield.

Interior view of the Midfield Satellite Concourse

The Bradley Terminal was heavily modernized and expanded in phases between 2008 and 2021.

The design by Fentress Architects in association with HNTB was unveiled on November 17, 2008. The first phase of construction began on February 22, 2010, and included the demolition and replacement of the north concourse gates and the construction of the "Great Hall" with dining, retail shopping and large airline alliance lounges. Work on the first phase was completed in 2013 [46] and crews began the second phase, which included the replacement of the south concourse and the expansion of the security, customs and immigration processing areas. The second phase was completed in 2015. [47] Of the 19 gates in the modernized terminal, 9 are equipped with three jetbridges to accommodate the largest commercial aircraft, the Airbus A380 and Boeing 747-8.

The third phase would be a new mid-field concourse and construction began on February 27, 2017. [47] The concourse, later renamed the West Gates at Tom Bradley International opened on May 1, 2021. [48] Two of the gates in the West Gates concourse can accommodate the A380. [47]

Regional Terminal (Terminal R)

The Regional Terminal, also referred to as "Terminal R", has nine gates: Gates 52A–52I, although Gate 52B is a bus gate. The terminal is used exclusively for American Eagle flights, earning it the nickname "the Eagle's nest." [49] It serves as the remainder of American's hub operations in Los Angeles, supplementing Terminal 4 and 5.

The terminal is located on the southeast side of the LAX airfield, east of Sepulveda Boulevard from Terminal 8. As it is physically separated from the other terminal buildings, passengers access the Regional Terminal using a system of shuttle buses. Buses operate between the Regional Terminal and Terminal 4 or Terminal 5, which house American Airlines' other gates. [50]

Terminal R's gate numbers (52A–52I) are meant to encourage passengers originating their travel from LAX to enter the airport through the less congested Terminal 5 and board the bus at a stop located at Gate 52. But as the majority of American Airlines' mainline fights at LAX operate out of Terminal 4, a separate bus service is additionally operated to that terminal to minimize connection times. [51]

The terminal has a covered walkway and ramp at each gate for access and egress to the aircraft instead of jet bridges. The terminal features restrooms, seating areas with power outlets, and a concession area.

American Airlines has one Admirals Club in the terminal.

The terminal originally handled United Express flights (gates 71C-71K) until it was vacated in 2005. [52] American Eagle flights were relocated to the terminal in January 2010 from a remote terminal which was 0.3 miles (480 m) west of Terminal 4 that would later be demolished.

LAX Automated People Mover

LAX Automated People Mover
West CTA
(Terminals 3, 4, B)
Center CTA
(Terminals 1, 2, 5, 6)
East CTA
(Terminals 7, 8)
Terminal 9
(Future)
LAX City Bus Center
West ITF
Maintenance and Storage Facility
C Line  K Line 
East ITF
CONRAC

Handicapped/disabled access All stations are accessible

As part of the Landside Access Modernization Program (LAMP), Los Angeles World Airports (LAWA) is building the LAX Automated People Mover, which consists of approximately 2.25 miles (3.62 km) of elevated guideway and six stations. Headways are expected to be as low as two minutes between trains. [53] Construction started in 2017, and was anticipated to be completed by 2023. [54]

The three westernmost stations will be located in the Central Terminal Area (CTA) located near the parking structures and connect to their respective terminals via pedestrian bridges:

  • West CTA station, serving terminals 3, 4, and B (the Tom Bradley International Terminal)
  • Center CTA station, serving terminals 1, 2, 5, and 6
  • East CTA station, serving terminals 7 and 8

The LAX Automated People Mover will connect the CTA to transportation options:

References

  1. ^ Hymon, Steve (June 18, 2018). "Report explains operating plan for Crenshaw/LAX Line and Green Line". The Source. Los Angeles County Metropolitan Transportation Authority. Archived from the original on August 23, 2018. Retrieved August 24, 2018.
  2. ^ "Special: LAX in the 1960s – Part 1". A Visual History of the World's Great Airports. Retrieved February 9, 2023.
  3. ^ Kuan, Albert (December 20, 2017). "LAX's Long-Standing History with Inter-Terminal Underground Tunnels". AirlineGeeks.com. Retrieved February 9, 2023.
  4. ^ Nelson, Valerie J. (November 25, 2007). "Charles D. Kratka, 85; designer, artist created mosaic tunnel walls at LAX". Los Angeles Times. Retrieved September 15, 2021.
  5. ^ Sandhaus, Louise (January 26, 2017). "Who designed the murals for the Los Angeles International Airport?". LSD News & Views.
  6. ^ Hawkes, Russell (July 3, 1961). "Work Advances on Los Angeles Jet Airport". Aviation Week. pp. 40–41.
  7. ^ a b "Terminal area map from about 1961". Flickr.com. Retrieved August 13, 2013.
  8. ^ Levin, Jay (April 22, 1984). "LAX being molded into an easy airport". Daily Breeze (Torrance). Copley News Service. p. A1 – via NewsBank.
  9. ^ Larsen, Carl (January 19, 1984). "PSA sees benefits in new L.A. terminal". The San Diego Union-Tribune. p. F1.
  10. ^ Levin, Jay (April 18, 1984). "LAX: How they tamed the monster – Revamping just in time for Olympics". The San Diego Union-Tribune. p. A1.
  11. ^ "Inter-Terminal Connections". Los Angeles World Airports. Retrieved November 27, 2023.
  12. ^ https://crankyflier.com/2022/11/15/an-unwelcome-adventure-awaits-those-using-terminal-1-5-at-lax/
  13. ^ "LAX Terminal 1 Map". Los Angeles World Airports. February 10, 2020. Retrieved September 15, 2021.
  14. ^ a b c d e f g h i j k "LAX Airline Location Map". Los Angeles World Airports. May 18, 2023. Retrieved August 4, 2023.
  15. ^ "Terminal 1". Los Angeles World Airports. Retrieved July 24, 2023.
  16. ^ "LAX Terminal 2 Map". Los Angeles World Airports. April 25, 2023. Retrieved August 4, 2023.
  17. ^ Malnic, Eric (June 1, 1988). "'Final Major Link' in LAX Expansion Opens". Los Angeles Times.
  18. ^ "LAX Terminal 2 to Be Revamped: Carriers Expect $94-Million Project to Start Next Month". Los Angeles Times. August 17, 1986.
  19. ^ "Report to the Board of Airport Commissioners". Granicus. February 6, 2023. Retrieved August 25, 2023.
  20. ^ a b "LAX Terminal 3 Map". Los Angeles World Airports. July 25, 2023. Retrieved August 4, 2023.
  21. ^ a b "LAX Specific Plan Amendment Study Draft EIR" (PDF). Los Angeles World Airports. July 2012. pp. 4–349. Retrieved January 22, 2015.
  22. ^ "US Airways Ends Operations In LAX's Terminal 1, Relocates To Terminal 3". CBS 2. February 12, 2014. Retrieved July 22, 2019.
  23. ^ "Delta, Los Angeles World Airports unveil first major phase of Delta Sky Way at LAX" (PDF). Delta Air Lines (Press release). March 29, 2022. Retrieved June 3, 2022.
  24. ^ "Delta, Los Angeles International Airport accelerate terminal transformation by 18 months". Delta Air Lines. November 12, 2020. Retrieved December 1, 2020.
  25. ^ "LAX Terminal 4 Map". Los Angeles World Airports. June 15, 2020. Retrieved September 15, 2021.
  26. ^ Oldham, Jennifer (August 1, 2002). "Remodeled Terminal at LAX Debuts". Los Angeles Times. Retrieved June 14, 2012.
  27. ^ "LAX Terminal 5 Map". Los Angeles World Airports. May 12, 2020. Retrieved September 15, 2021.
  28. ^ Whiteson, Leon (August 21, 1988). "Architectural Firm Practices One-Stop Design: Gensler & Associates Specializes in Planning Project's Inside as Well as Outside". Los Angeles Times.
  29. ^ Weikel, Dan (May 12, 2017). "LAX begins massive relocation of 15 airlines in the central terminal area". Los Angeles Times. Retrieved May 14, 2017.
  30. ^ "LAX Terminal 6 Map". Los Angeles World Airports. April 13, 2020. Retrieved September 15, 2021.
  31. ^ "Last Air Terminal Section Dedicated". Los Angeles Times. November 11, 1963. p. B1. ProQuest  168495656. Retrieved September 27, 2021 – via ProQuest.
  32. ^ "Two Airlines Make Room for Jumbos". Los Angeles Times. February 11, 1970. p. C13. ProQuest  156424039. Retrieved September 27, 2021 – via ProQuest.
  33. ^ a b c d "United Airlines Los Angeles International Airport (LAX) Terminal 7 Improvement Project Initial Study – Proposed Negative Declaration" (PDF). Los Angeles World Airports. March 28, 2013. Retrieved January 22, 2015.
  34. ^ Beherec, Marc A.; Wilson, Monica (January 2, 2020). "LAX Terminal 6 Project: Cultural, Paleontological and Tribal Cultural Resources Technical Memorandum" (PDF). AECOM. Retrieved September 27, 2021.
  35. ^ "American Airlines Expands Its Service To Terminal 6 At Los Angeles International Airport". American Airlines. Retrieved February 11, 2021.
  36. ^ "American Airlines at LAX to Relocated Four Aircraft Gates". Aviation Pros. January 30, 2017. Retrieved February 11, 2021.
  37. ^ "The All-New Alaska Airlines Terminal 6 at LAX". Alaska Airlines. Retrieved March 20, 2012.
  38. ^ "Los Angeles International Begins Terminal 6 Refurbishment". Simple Flying. July 20, 2021. Retrieved July 28, 2021.
  39. ^ "LAX Terminal 7 Map". Los Angeles World Airports. February 26, 2020. Retrieved September 15, 2021.
  40. ^ "United Begins $200 Million Terminal Expansion at LAX". Flight Global. Archived from the original on May 22, 2014. Retrieved August 13, 2013.
  41. ^ "Spotlight Projects: LAX Terminal 7". HNTB. Archived from the original on May 12, 2001. Retrieved May 12, 2001.
  42. ^ "LAX Terminal 8 Map". Los Angeles World Airports. February 26, 2020. Retrieved September 15, 2021.
  43. ^ a b "LAX Tom Bradley International Terminal Map". Los Angeles World Airports. Retrieved September 15, 2021.
  44. ^ Oldham, Jennifer (February 23, 2007). "LAX watches world go by; Cramped facilities push Pacific Rim carriers to newer airports". Los Angeles Times. p. A1. Retrieved June 10, 2020.
  45. ^ Salvo, Christina (March 19, 2007). "World's Largest Airliner Lands at LAX". KABC-TV. Archived from the original on March 22, 2007. Retrieved December 6, 2010.
  46. ^ Weikel, Dan (June 20, 2013). "Officials tout progress, not completion, at LAX's new terminal". Los Angeles Times. Retrieved September 14, 2021.
  47. ^ a b c Weikel, Dan (February 28, 2017). "LAX breaks ground on a $1.6-billion midfield terminal that will add 12 gates for aircraft". Los Angeles Times. Retrieved September 14, 2021.
  48. ^ "15-gate concourse opens at LAX after more than 4 years of construction". KTLA. Associated Press. May 24, 2021. Retrieved May 25, 2021.
  49. ^ Nguyen, John (May 18, 2016). "American Quietly Updates, Enhances Operations at LAX – AirlineReporter". Airline Reporter. Retrieved May 8, 2018.
  50. ^ "Changes To The American Eagle Terminal LAX". One Mile at a Time. May 19, 2016. Retrieved May 8, 2018.
  51. ^ "American Airlines at LAX to Relocated Four Aircraft Gates". Aviation Pros. January 30, 2017. Retrieved May 8, 2018.
  52. ^ "United Closes Commuter-Flight Remote Terminal at LAX". Aviation Pros. Associated Press. July 18, 2005. Retrieved September 15, 2021.
  53. ^ "The Solution". Connecting LAX. City of Los Angeles. Retrieved August 16, 2017.