From Wikipedia, the free encyclopedia
The Tehachapi Renewable Transmission Project 500kV eastern transition station in Chino Hills, California.

The Tehachapi Renewable Transmission Project is a project involving the construction of approximately 173 miles (278 km) of new and upgraded high-voltage transmission lines for transmission of electricity from wind farms and other generating units in southeastern Kern County, California to Los Angeles County and San Bernardino County.

The project, developed and operated by Southern California Edison, commenced construction on March 7, 2008 and was completed and placed in operation in December 2016. [1] With a capacity of 4,500  megawatts, the transmission system can provide power for an estimated 3 million homes. [2]

It passes through sections of the Tehachapi Mountains, Sierra Pelona Mountains, and Antelope Valley.

State laws requiring SCE to provide at least 33% of its power service from renewable sources by 2020 is driving the project. SCE had no interest in owning the land that the project is on, but needed to construct the transmission system nonetheless to meet the renewable source laws. [3]

See also

References

  1. ^ "TRTP | Projects in Progress | Reliability | About Us | Home - SCE". www.sce.com. Retrieved 2017-03-14.
  2. ^ "Southern California Edison Starts Construction on the Nation's Largest Wind Transmission Project" (Press release). Edison International. 2008-03-07. Archived from the original on 2011-07-10. Retrieved 2010-07-23.
  3. ^ Southern California Edison Tehachapi Renewable Transmission Project Renewable Energy Projects. "SCE - Tehachapi Renewable Transmission Project". Archived from the original on 2012-07-17. Retrieved 2012-08-13.

External links