Tayan Bridge Jembatan Tayan | |
---|---|
Coordinates | 0°02′53″S 110°06′29″E / 0.0481°S 110.1080°E |
Carries | 3 lanes of AH150 Trans-Kalimantan Highway Southern Route |
Crosses | Kapuas River |
Locale | Sanggau Regency, West Kalimantan, Indonesia |
Characteristics | |
Design | Truss arch bridge [1] |
Total length | total: 1,975 m (6,480 ft)
[1] 300 m (984 ft) (Tayan to Tayan Island) 1,140 m (3,740 ft) (Tayan Island to Piasak) |
Width | 11 m (36 ft) |
Longest span | 200 m (660 ft) |
Clearance below | 13 m (43 ft) |
History | |
Construction start | September 2012 |
Construction end | 19 February 2016 |
Construction cost | Rp 740 billion |
Opened | 22 March 2016 |
Location | |
|
Tayan Bridge ( Indonesian: Jembatan Tayan) is a bridge which crosses Kapuas River in Sanggau, West Kalimantan, Indonesia. This bridge is a part of Trans-Kalimantan Highway (southern route) that connects West Borneo with Central Borneo. [2] The bridge is one of the longest bridges in Borneo. [3] The bridge construction project takes about 900 days. The bridge opened to traffic on 22 March 2016. [4]
Before the bridge was completed, vehicle crossing between Tayan and Piasak was served by two small[ citation needed] ferries. It required 20 minutes to cross the river by ferry. [5]
Construction of the bridge started in September 2012. [6] The construction project is mainly funded by loan from China (90%) [7] [8] and was built by China Road and Bridge Corporation. [9] [10] The bridge costs 740 billion rupiahs. [10] The bridge was finished on 19 February 2016. [6]
The bridge was inaugurated by President of Indonesia, Joko Widodo, and opened on 22 March 2016. [4]
The total length of this bridge is 1,975 meters, while the width is about 11 meters, carries 3-lanes highway. The clearance of the bridge from the surface of river at the high water condition is 13 meters. [11]
The construction of the bridge is divided into two parts. The first part is a 300 meters bridge from Tayan town to Tayan Island, and the second part is a 1,140 meters bridge from Tayan Island to Piasak. [11] The bridge is expected to last for 100 years with maintenance. [4]