This article is rated C-class on Wikipedia's
content assessment scale. It is of interest to the following WikiProjects: | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
It is requested that a map or maps be
included in this article to
improve its quality. Wikipedians in Nunavut or the Northwest Territories may be able to help! |
While researching the article on the deep water port proposed for Bathurst Inlet I came across a reference that said that warm weather caused the ice road to not be open long enough to ship a year's worth of supplies to the mines, and that this triggered renewed interest in supplying the mines via a permanent road from the Bathurst Inlet port.
The table in this article does not support the report that 2005's transport of supplies fell short.
This article and the one on Bathurst Inlet should link to one another. The conflicting reports form 2005 should be addressed.
Cheers! Geo Swan ( talk) 14:45, 9 November 2008 (UTC)
Additional Background on opening/closing dates. I was not sure if going back to 1984 would be useful as all I have found is a table on opening/closing dates that are otherwise not available, published on the NWT Government transportation website. The usefulness may be to show how warming trends economically effect commercial operations. Here are the opening/closing dates extracted from a spreadsheet link on http://www.dot.gov.nt.ca/Highways/Winter-Roads. The road is referred in the table as the Lupin Mine road. I don't know when/if/why the name changed.
Lupin Mine 1984 17-Feb - 14-Apr 1985 30-Jan - 8-Apr, 1986 22-Jan - 7-Apr, 1987 14-Jan - 1-Apr, 1988 N/A - N/A 1989 12-Feb - 9-Apr. 1990 14-Feb - 7-Apr, 1991 1-Feb - 22-Mar, 1992 23-Jan - 13-Mar 1993 28-Jan - 22-Mar, 1994 3-Feb - 1-Apr, 1995 18-Jan - 3-Apr, 1996 25-Jan - 13-Apr 1997 28-Jan - 12-Apr, 1998 19-Jan - 4-Apr, 1999 1-Feb - 30-Mar, 2000 28-Jan - 3-Apr 2001 1-Feb - 13-Apr, 2002 26-Jan - 16-Apr, 2003 1-Feb - 2-Apr, 2004 28-Jan - 31-Mar 2005 26-Jan - 5-Apr, 2006 5-Feb - 26-Mar, 2007 28-Jan - 8-Apr, 2008 28-Jan - 7-Apr 2009 1-Feb - 25-Mar, 2010 4-Feb - 21-Mar, 2011 28-Jan - 31-Mar, 2012 1-Feb - 28-Mar 2013 30-Jan - 31-Mar, 2014 30-Jan - 1-Apr, 2015 30-Jan - 31-Mar Note: After the "Ice Road Truckers" first season, the operators have been very secretive about operations of the ice road. This information may not be obtainable in any other place, so please do not delete it here. Do you think this should be added to the main table? Travelslow ( talk) 04:48, 20 April 2018 (UTC)
Hello fellow Wikipedians,
I have just modified 4 external links on Tibbitt to Contwoyto Winter Road. Please take a moment to review my edit. If you have any questions, or need the bot to ignore the links, or the page altogether, please visit this simple FaQ for additional information. I made the following changes:
When you have finished reviewing my changes, you may follow the instructions on the template below to fix any issues with the URLs.
This message was posted before February 2018.
After February 2018, "External links modified" talk page sections are no longer generated or monitored by InternetArchiveBot. No special action is required regarding these talk page notices, other than
regular verification using the archive tool instructions below. Editors
have permission to delete these "External links modified" talk page sections if they want to de-clutter talk pages, but see the
RfC before doing mass systematic removals. This message is updated dynamically through the template {{
source check}}
(last update: 18 January 2022).
Cheers.— InternetArchiveBot ( Report bug) 17:58, 25 January 2018 (UTC)