This article is written in
Australian English, which has its own spelling conventions (colour, realise, program, labour (but Labor Party)) and some terms that are used in it may be different or absent from other
varieties of English. According to the
relevant style guide, this should not be changed without
broad consensus.
Mernda line is within the scope of WikiProject Australia, which aims to improve Wikipedia's coverage of
Australia and
Australia-related topics. If you would like to participate, visit the
project page.AustraliaWikipedia:WikiProject AustraliaTemplate:WikiProject AustraliaAustralia articles
This article is within the scope of WikiProject Trains, an attempt to build a comprehensive and detailed guide to
rail transport on Wikipedia. If you would like to participate, you can visit the
project page, where you can join the project and/or contribute to the
discussion. See also:
WikiProject Trains to do list and the
Trains Portal.TrainsWikipedia:WikiProject TrainsTemplate:WikiProject Trainsrail transport articles
This article is within the scope of WikiProject Transport, a collaborative effort to improve the coverage of articles related to
Transport on Wikipedia. If you would like to participate, please visit the project page, where you can join
the discussion and see a list of open tasks.TransportWikipedia:WikiProject TransportTemplate:WikiProject TransportTransport articles
I have some conflicting opening dates of this line - 1889 and 1891. Does anybody know the truth?
Cnwb 22:37, 6 Dec 2004 (UTC)
According The Whittlesea Railway by Robert Aquilina, the Reservoir to Whittlesea section was opened on December 20, 1889.
Lokicarbis 11:28, Dec 30, 2004 (UTC)
Which is the branch?
Why is Epping considered to be a branch off the Hurstbridge line and not the other way around? •
Leon 01:31, 30 September 2006 (UTC)reply
Perhaps because Hurstbridge is the longer line? I would usually go for the branch being the later one to open, but in this case, the first sections of both lines opened on the same day, so the choice would be arbitrary.
Philip J. Rayment 02:32, 30 September 2006 (UTC)reply
Double track
The line is now double track to Epping. — Preceding
unsigned comment added by
Herestoree (
talk •
contribs) 23:47, 15 January 2012 (UTC)reply
I check pages listed in
Category:Pages with incorrect ref formatting to try to fix reference errors. One of the things I do is look for content for
orphaned references in wikilinked articles. I have found content for some of
South Morang railway line's orphans, the problem is that I found more than one version. I can't determine which (if any) is correct for this article, so I am asking for a sentient editor to look it over and copy the correct ref content into this article.
I apologize if any of the above are effectively identical; I am just a simple computer program, so I can't determine whether minor differences are significant or not.
AnomieBOT⚡ 13:02, 31 July 2015 (UTC)reply
with services beyond this point to Whittlesea discontinued, and the line closed.
However, services continued on the Whittlesea line by road bus. The bus remained a Vic Rail tendered (Rather than MMBT tendered) private service until bus and rail re-organisation many years later. — Preceding
unsigned comment added by
121.200.27.15 (
talk •
contribs) 09:49, 23 September 2021 (UTC)reply
Requested move 17 July 2023
The following is a closed discussion of a
requested move. Please do not modify it. Subsequent comments should be made in a new section on the talk page. Editors desiring to contest the closing decision should consider a
move review after discussing it on the closer's talk page. No further edits should be made to this discussion.
Note: redirects are ineligible to be current titles in move requests, and there is no need to list the redirect,
Mernda line, to be swapped. A title swap will happen automatically if the
Mernda railway line article is moved as proposed. P.I. Ellsworth ,
ed.put'er there 19:41, 18 July 2023 (UTC)reply
Comment No opinion on whether it should be moved, but it would be a good idea also to nominate similarly titled pages in
Category:Railway lines in Melbourne for consistency. Also there is no need to separately list the redirect as if the move request is successful, it would automatically be swapped. - CHAMPION(
talk) (
contributions) (
logs) 08:36, 17 July 2023 (UTC)reply
Oppose, convention for Australian railway line articles where both the physical railway line and the services that operate on it are covered in one article, is to use the Foo railway line format, with the service a redirect.
Bagufleat (
talk) 03:53, 20 July 2023 (UTC)reply
Support Mernda line, oppose Mernda line service as per
WP:COMMONNAME. Mernda line is the common name, as shown by
[1][2][3][4][5][6][7]. Is "Mernda line service" a name that is used anywhere?
Steelkamp (
talk) 04:45, 20 July 2023 (UTC)reply
The discussion above is closed. Please do not modify it. Subsequent comments should be made on the appropriate discussion page. No further edits should be made to this discussion.
Ok, I'll review this article, although it might take me some time as I might be busy for the next few days.
Keres🌕Lunaedits! 18:13, 15 August 2023 (UTC)reply
@
Keresluna thank you for beginning to review the article! I am available to complete this during the week so I'm ready for the feedback. If I get a bit busy (with school or something else) I'll let you know. Currently there are 2 articles ahead of you in the queue for me to act on their feedback. This should be quick however, so I'll make my way to this article relatively soon. Recently, two of my articles that I've nominated have been invalidly quick-failed. I am ready and willing to act on all feedback, even if it is extensive. Thank you for taking the time to review the article.
HoHo3143 (
talk) 22:20, 15 August 2023 (UTC)reply
@
Keresluna just wanted to provide you with an update regarding the placement of this article in the queue. This article is now second in the queue due to another article being promoted, so I'm ready to receive additional feedback. The user reviewed the article ahead in the queue is on holiday, so this article effectively takes priority for feedback.
HoHo3143 (
talk) 10:21, 17 August 2023 (UTC)reply
@
Keresluna added comments for the two most recent points you made.
HoHo3143 (
talk) 08:48, 19 August 2023 (UTC)reply
@
Keresluna all changes should now have been implemented and the article should be ready to pass. Let me know if there are any more changes you need making.
HoHo3143 (
talk) 06:59, 26 August 2023 (UTC)reply
2a. it contains a list of all references (sources of information), presented in accordance with
the layout style guideline.
2b.
reliable sources are
cited inline. All content that
could reasonably be challenged, except for plot summaries and that which summarizes cited content elsewhere in the article, must be cited no later than the end of the paragraph (or line if the content is not in prose).
'The Epping line was electrified to Reservoir in 1921, with an AEC railmotor providing a shuttle service between Reservoir and the terminus at Whittlesea. Preston-Reservoir station was renamed Reservoir in 1909.' in the 20th century section is unsourced.
Y
'The line to Epping itself was reopened and electrified in 1964, with the remaining line dismantled in the 1970s. However, the right-of-way beyond Epping was retained to allow future expansion of the rail corridor.' in the 20th century section is unsourced.
Y
The list of the 'Major construction commenced in October 2010, with works including:' is largely unsourced.
Y
'Prior to the lines official opening, a community open day was held to promote the new stations to the local residents.' in the Mernda extension section is unsourced.
Y
'At the end of these works, the Mernda line will have 12 remaining crossings on the corridor that are not proposed for removal.' in the Future section is unsourced.
Y
'From 2025, Keon Park station will be elevated as part of level crossing removal works.' in the Stations section is unsourced.
Y
How is the chart in the Station section sourced? I don't see any source for the Terrain, Train Connections, and Other Connections column.
Y Unfortunately its very hard to reference these three columns. For terrain, I just looked at photos of the stations and then assigned it a level. For train connections, I looked at the linked wikipedia page to see a summary and then verified it by looking at the PTV website. Finally, for other connections I also viewed the wikipedia page and then verified it by looking at the PTV website, associated coach maps, and the skybus website. On all other promoted GA articles, there hasn't been the need for any sourcing. If you firmly believe in sourcing being required, I am open for suggestions on how to implement it
It is fine then, as I'm not familiar with these articles.
Keres🌕Lunaedits! 15:19, 19 August 2023 (UTC)reply
Y thank you!
Same comment above for chart in the 'Operations' section.
Another user created this table so I'll ask them for the source that they used and add it in.
Ref 64 needs to be properly formatted.
Y fixed. info is hard to access due to the paywall
Random ref checks:
60: Y Checks out.
Y acknowledged
29: Y
Y acknowledged
63: Y
Y acknowledged
8: Y
Y acknowledged
Dead link: 1, 21
Y done
Grammar
@
HoHo3143: Sorry for taking so long to review the article. I will try to finish in a few days. Meanwhile, here are some grammar comments; feel free to reject them as you see fit.
Keres🌕Lunaedits! 20:32, 21 August 2023 (UTC)reply
@
Keresluna thank you for this. Just to give you the heads up, I've got a busy few days coming up so I'll be getting to this towards the end of the week. Feel free to complete the review in the mean time and I'll get to it shortly.
HoHo3143 (
talk) 11:11, 23 August 2023 (UTC)reply
Ok, I will put it on hold for now, as I am done with the comments. The comments that needs to be addressed are the grammar and the dead link.
Keres🌕Lunaedits! 14:51, 23 August 2023 (UTC)reply
'with 24 hour service available' to 'with 24-hour service available'
Y
'Mernda line run with a two three-car formations' to 'Mernda line run with two three-car formations'
Y
'on the now closed Inner Circle line' to 'on the now-closed Inner Circle line'
Y
'in addition to duplication of the line' to ' in addition to the duplication of the line'
Y
'work on the four kilometre extension, in addition to design work' to 'work on the four-kilometre extension, in addition, to design work'
Y
'on the new section of track' to 'on the new section of the track'
Y
'statewide developers contribution fund. Since the 2017 acquisitions, there has been little planning' to 'statewide developers' contribution fund. Since the 2017 acquisitions, there have been little planning'
Y
'Mernda line operates from approximately' to 'Mernda line operate from approximately'
Y
'with 60 minute frequencies' to 'with 60-minute frequencies'
Y
'throughout the duration of works for affected' to 'throughout the duration of work for affected'
Y
'history have been government run: from' to 'history have been government-run: from'
Y
'and ground level designs' to 'and ground-level designs'
Y
'carriage and can accommodate of up to 432 seated passengers in each six car configuration' to 'carriage, and can accommodate up to 432 seated passengers in each six-car configuration'
Y
'however, there are some stations that haven't been' to 'however, some stations haven't been'
Y
'three position signalling which is widely used across the Melbourne train network. Three position' to 'three-position signalling which is widely used across the Melbourne train network. Three-position'
Y
Sourcing
@
ThylacineHunter could you please add references to the operators table? This has been mentioned as something needed in the GA review.
HoHo3143 (
talk) 08:49, 19 August 2023 (UTC)reply