General information | |||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
Location |
Wuhou District,
Chengdu,
Sichuan China | ||||||||||||||||||||
Coordinates | 30°37′30″N 104°00′58″E / 30.6249°N 104.0161°E | ||||||||||||||||||||
Operated by | Chengdu Metro Limited | ||||||||||||||||||||
Line(s) |
Line 3 Line 7 Line 10 | ||||||||||||||||||||
Platforms | 7 (3 island platforms, 1 side platform) | ||||||||||||||||||||
History | |||||||||||||||||||||
Opened | 31 July 2016 | ||||||||||||||||||||
Services | |||||||||||||||||||||
|
Taipingyuan ( Chinese: 太平园) is a transfer station on Line 3, Line 7 and Line 10 of the Chengdu Metro in China. [1] [2]
G | Entrances and Exits | Exits A-F |
B1 | Concourse | Faregates, Station Agent |
B2 | Side platform, doors open on the right | |
Southbound | Line 10 towards Xinping ( Cujin) → | |
Northbound | ← Line 10 termination track | |
Island platform, doors open on the left/right | ||
Northbound | ← Line 3 towards Chengdu Medical College ( Hongpailou) | |
Island platform, doors open on the left | ||
Southbound | Line 3 towards Shuangliu West Station ( Chuan-zang Flyover) → | |
B3 | Clockwise | ← Line 7 to Wuhou Avenue |
Island platform, doors open on the left | ||
Counterclockwise | Line 7 to Gaopeng Avenue → |