Spetstyazhavtotrа́ns (Russian: Спецтяжавтотранс, IPA:[spʲɪt͡stʲɪʐəftɐˈtrans]) is a Russian company specializing in the shipment of
oversized cargo. The group of companies provides
engineering services to the oil, gas, chemical, energy and other industries.
History
Timeline
1974 – Establishment of a committee to prepare proposals for the transportation of oversize energy and industrial equipment
24 November 1976 – State Committee on Science and Technology resolution "On ensuring the transportation of large-sized and heavy energy and other industrial equipment and the development of related research"
1978 - Establishment of Spetstyazhavtotrans, a specialized research and production association (SRPA)
1978-1988 – Creation of a classification system for the shipment of oversized cargoes of a large mass (OCLM) and methods of calculating the cost-effectiveness of OCLM transportation
1978 – Shipment by Minrechflot vessels began
1981 – Transportation security agreement for oversize nuclear-power equipment in
CMEA countries
1982 – Development program for OCLM transportation by specialized vehicles from 1981 to 2000 approved[2]
1982-1983 – Research on inland highways from the
Caspian Sea
1985 – The maritime sector joined the transport of oversize cargo by vehicles and river transport
1986 – First oversize transport by air (
Аn-124 "Ruslan" airplanes)
1988 – Volume of oversize cargo increased to 1,250,000 tons from 353,000 tons in 1981[3]
15 April 1991 – Council of Ministers of the
RSFSR resolution 10 mandating the RSFSR Ministry of Transport to privatize Spetstyazhavtotrans, SRPA and the State Scientific and Research Institute of Road Transport (SSRIRT) by converting them into joint-stock companies [4]
1992 - Creation of the IPS Project, an automated information-retrieval system for optimal transport and technological solutions
2004 – New owners, with shareholders appointing new management
2006 – Establishment of the Spetstyazhavtotrans
corporate group
2006 – Establishment of Polynom to design oil and gas facilities
2007 – Establishment of EDO "Spetstyazhproekt"
2008 – Establishment of NefteGazEnergoStroy Engineering (NGES Engineering)
2012 - Polynom won the ninth all-Russian competition for the best design and survey organization[5]
Events
The 1970s were years of construction in the USSR, with the building of industrial and energy complexes in the
Soviet Union began:
Atommash, Kureiskaya,
Sayano-Shushenskaya,
Sakhalin and other HPP, NPP, oil and gas pipelines in
Western Siberia and the first petrochemical plants. Each required the transport of heavy cargo which could not be delivered in parts.[3]
For its study in 1974, the State Committee of the Council of Ministers of the USSR created a temporary scientific and technical committee to prepare proposals for transporting oversized cargoes of a large mass (OCLM). Its proposals were reflected in the State Committee resolutions "On ensuring the transportation of large-sized and heavy energy and other industrial equipment and the development of related research and development work" and "Guidelines for the research and design work to ensure the transportation of the energy and other industrial equipment", dated 24 November 1976. These documents outlined the main problems of research and development work and measures to satisfy the needs of the national economy for equipment transportation, including the search for new technical and logistical solutions.[3] In May 1976, a Spetstyazhavtotrans convoy was established in
Gorky.[3]
On 6 April 1978 Resolution 262 of the Council of Ministers of the USSR, "On measures to improve the organization of transportation of large-sized and heavy cargoes",[1] was made. Among the series of measures, the establishment of the specialized research and production association (SRPA) Spetstyazhavtotrans was mandated.[3]
By the early 1990s Spetstyazhavtotrans was a research and production group accounting, according to some estimates, for over 60 percent of oversize transport in the country. It consisted of five large trucking companies in
Novgorod,
Leningrad,
Moscow and
Astrakhan, with branches in other cities. Bases were established in
Siberia, where there was a great need for transport, in cities which included
Surgut,
Noyabrsk and
Nizhnevartovsk.[3]
The Spetstyazhavtotrans SRPA created a unified system for transporting oversize cargo and engineering services.[3] Significant contributions were made by A. M. Lyovushkin, L. Y. Byzer, V. S. Molyarchuk, V. N. Androsyuk, A. G. Alexandrov, A. S. Diamidov, N. A. Troitskaya, V. A. Alexandrov, V. P. Safronov, L. M. Moshek, A. A. Lvov, A. Ya. Kogan, P. A. Shpolyansky, R. A. Atanasyan and many others.[3]
Spetstyazhproekt was re-created, and in 2008 NefteGazEnergoStroy Engineering (NGES Engineering LLC) was added to the corporate group which included Polynom LLC. A new production and scientific structure, providing engineering support for transportation and facility design for the chemical and petrochemical industries, was forming.
1978 – Two
gas turbines for polyethylene production, more than 18.2 m in length with a diameter of 4.5 to 7.6 m and weighing 210 tons each, from
John Brown & Company to the Prikumsky plastics factory (now Stavrolen) in
Budennovsk[6]
1979 – Nine pieces of equipment for
methanol production, with a maximum diameter of 6 m, length of 33 m and weight of 220 tons, to the Gubahinsky chemical plant[7]
1981 –
Hydrometeorological equipment, 26.5 m long, 6.5 m wide, 7.3 m high and weighing 110 tons, to the Kyrgyz hydrometeorology office[8]
1982 – Concrete floating workshop 67.5 m long, 13.52 m wide and weighing 1300 tons from
Bourgas,
Bulgaria to
Havana
1983 - Distillation column, weighing 335.2 tons with a diameter of 5 m and 62 m long, from the Dzerzhinskhimmash plant in
Kirishi
1986 – Four ammonia-production units, up to 4 m in diameter and weighing up to 500 tons, from Bulgaria to a chemical plant in Dimitrovgrad
1987 - TVR-120-2 generator stator and TDTS=125000/1100 transformer weighing 126 and 114 tons, respectively, to
Yuzhno-Sakhalinsk[10]
2007 – Equipment for the
Nizhnekamskneftekhim polyethylene plant (320 packages, totaling more than 685 tons)
2008 – Two reactors (R-1201 – about 30 m long and 115 tons, and R-1202 – over 38 m and 310 tons) to the site of the Nizhnekamskneftekhim
polyolefin plant
2012 – Petrochemical equipment (weighing up to 380 tons, 67 m long and up to 7.5 m in diameter) from Energomash-
Atommash in
Volgodonsk to TANECO in
Nizhnekamsk[11]
2013-2014 – Four
hydrofracking reactors, weighing up to 1,306 tons, to the Rosneft Achinsk refinery
Record
In 2013, Spetstyazhavtotrans set a world record for road transportation of heavy cargo (a
hydrocracking reactor) 203 kilometers from Kubekovo in
Krasnoyarsk Krai to the
Achinsk refinery[13]
^Long-term comprehensive development program of KTO transportation for the period of 1981-2000. - Moscow: Spetstyazhavtotrans, 1980
^
abcdefgh Diamidov А. S. Development of transportation of oversized cargoes of a large mass // Outcome of science and tech. VINITI. Ser. The interaction of different types of transport and container shipment. – 1992. – 16. – p. 1-164.
^Diamidov А. S. Improving transportation of large-sized equipment // Erecting and special work in construction.— 1980.— No 5.
^ Knyazev А. N. Transportation of research vessel а / CBNTI of Minavtotrans of the RSFSR.— Moscow,— 1989
^Alexandrov А. G., Byzer L. Ya., Diamidov А. S. Transportation of large-sized devices and special work in construction (1984), No. 1.
^ Diamidov А. S., Pavlov V. V., Troitskaya N. А. Creating an organizational framework of the transport system for the transportation of KTG / CBNTI of Minavtotrans of the RSFSR.— Moscow,— 1989.