Serpong–Balaraja Toll Road
Jalan Tol Serpong–Balaraja
Serbaraja Toll Road
Route information
Maintained by Trans Bumi Serbaraja
Length39.8 km (24.7 mi)
Existed20 September 2022–present
Major junctions
Southeast end Serpong
Major intersections
Northwest end Balaraja
Location
Country Indonesia
Major cities
Highway system

The Serpong–Balaraja Toll Road (shortened to Serbaraja Toll Road) is a toll road that connects Serpong with Balaraja, Tangerang Regency in the province of Banten, Indonesia. An extension from the Jakarta–Serpong Toll Road, it will provide access from Serpong to the Port of Merak via the Tangerang–Merak Toll Road. [1]

History

Construction was initially scheduled to commence in 2016, but was delayed because of land acquisition issues. [2] [3] [4] Construction of section 1A was completed in April 2022, [5] and was opened for free public testing from 10 to 21 August 2022. [6] The toll road was officially inaugurated on 20 September 2022. [7] On 4 October 2022, The Ministry of Public Works and Housing officially imposed tariffs for Section 1A. [8]

Building stages

  • Section 1: Rawabuntu– Legok (11.3 km). Rawabuntu–Cisauk segment by Wijaya Karya, Cisauk–Legok segment by Nusa Raya Cipta
  • Section 2: Legok–South Tigaraksa (10.7 km)
  • Section 3: South Tigaraksa–Balaraja (17.8 km)

Exits

ProvinceLocation km miExitNameDestinationsNotes
Banten South Tangerang127.512BSD InterchangeEastern terminus
148.714Cilenggang Toll Gate
Eastbound exit & Westbound entry only
Tangerang Regency169.916BSD Timur Toll Gate
191219Industri Toll Gate
  • Industrial Complex
  • Cicayur
211321 Legok Toll Gate
281728Mekar Jaya Toll Gate
322032Pasir Barat Toll Gate
352235Jambe Toll Gate
392439Cileles Toll Gate
  • Cileles
  • Jasinga
  • Leuwialang
422642Tigaraksa Toll Gate
513251Balaraja Interchange
1.000 mi = 1.609 km; 1.000 km = 0.621 mi

References

  1. ^ "Sinar Mas Land Secures Vital Financing for Serpong-Balaraja Toll Road". Jakarta Globe. Retrieved 28 June 2019.
  2. ^ "BSD Matches Rival Offer to Win $439m Serpong-Balaraja Toll Road Project". Jakarta Globe. Retrieved 28 June 2019.
  3. ^ "BSD to finalize Rp 4t loan for Serpong-Balaraja toll road". The Jakarta Post. Retrieved 28 June 2019.
  4. ^ "Pembangunan Jalan Tol Serpong-Balaraja Akan Dimulai Awal 2019". Tribun News. Retrieved 28 June 2019.
  5. ^ Yanwardhana, Emir (10 March 2021). "Akhir Tahun Ini Serpong-Balaraja Bakal Ada Tol Baru!". CNBC Indonesia.
  6. ^ Yanwardhana, Emir (9 August 2022). "Asyik! Tol Baru BSD Siap Fungsional Besok" [Hurray! New BSD Toll road Will be Functional Tomorrow]. cnbcindonesia.com (in Indonesian). CNBC Indonesia. Retrieved 11 August 2022.
  7. ^ Humas (2022-09-20). "Peresmian Jalan Tol Cibitung–Cilincing dan Serpong–Balaraja Seksi 1, di Gerbang Tol Gabus, Kabupaten Bekasi, Provinsi Jawa Barat, 20 September 2022" [Inauguration of Cibitung–Cilincing Toll Road and Serpong–Balaraja Toll Road Section 1, on Gabus Toll Plaza, Bekasi Regency, West Java, 20 September 2022]. Cabinet Secretariat of the Republic of Indonesia. Cabinet Secretariat of the Republic of Indonesia. Retrieved 2022-10-01.
  8. ^ Suhendra, Zulfi (3 October 2022). "Siap-siap! Mulai Besok Masuk Tol Serpong-Balaraja Bayar Rp 5.500" [Get ready! Starting Tomorrow Entering Serpong-Balaraja Toll Road to Pay Rp. 5,500]. finance.detik.com (in Indonesian). Detik.com. Retrieved 6 October 2022.