From Wikipedia, the free encyclopedia

STS-61-M
Names Space Transportation System
Mission type TDRS-D satellite deployment (planned)
Operator NASA
Spacecraft properties
Spacecraft Space Shuttle Challenger (planned)
Crew
Crew size6
Members Loren J. Shriver
Bryan D. O'Connor
Mark C. Lee
Sally K. Ride
William Frederick Fisher
Robert Wood
Start of mission
Launch dateJuly 22, 1986 (planned)
Not launched
Rocket Space Shuttle Challenger
Launch site Kennedy Space Center, LC-39A
Contractor Rockwell International
Orbital parameters
Reference system Geocentric orbit (planned)
Regime Low Earth orbit
Perigee altitude285 km (177 mi)
Apogee altitude295 km (183 mi)
Inclination28.45°
Period90.40 minutes

Space Shuttle patch
←  STS-51-L (25)
STS-62-A
STS-26
STS-61-J →
 

STS-61-M was a proposed NASA Space Shuttle program mission, planned for July 1986 but canceled following the Space Shuttle Challenger disaster ( STS-51-L).

Payload was to have been TDRS-D of the U.S. tracking and data relay satellite (TDRS) satellites.

Primary Crew

Position Astronaut
Commander Loren J. Shriver
Would have been second spaceflight
Pilot Bryan D. O'Connor
Would have been second spaceflight
Mission Specialist 1 Mark C. Lee
Would have been first spaceflight
Mission Specialist 2 Sally K. Ride
Would have been third spaceflight
Mission Specialist 3 William F. Fisher
Would have been second spaceflight
Payload Specialist 1 Robert Wood
Would have been first spaceflight

Backup Crew

Position Astronaut
Payload Specialist 1 Charles D. Walker
Would have been fourth spaceflight

See also

References