Commission date | 2010, 2011 |
Solar farm | |
Type | Flat-panel PV |
Site area | 85 ha (210 acres) Site plan |
Power generation | |
Nameplate capacity | 37.7 MWp |
Reckahn Solar Park is a photovoltaic power station in Reckahn, southwest of Berlin, Germany. It has a capacity of 37.7 megawatt (MW) and was constructed in three phases. [1] [2] [3] Reckahn I was 22.661 MW covering 56 hectares (140 acres) and was built by Beck Energy GmbH (Belectric) using 292,000 First Solar thin-film CdTe-panels, and was expected to produce about 22 gigawatt-hours per year. [4] Reckahn II added 13.3 MW, using 172,000 modules on a 35 hectares (86 acres) site. [5] Reckahn III, completed in 2011, added 1.8 MW, bringing the total to 37.7 MW. The FIT is 21.1 Euro cents per kilowatt-hour. [6]