Probolinggo–Banyuwangi Toll Road
Probowangi Toll Road
Route information
Maintained by PT Jasa Marga Probolinggo Banyuwangi (JPB)
Length163.83 km (101.80 mi)
StatusUnder construction
Major junctions
Northwest end Probolinggo
Major intersections Pasuruan–Probolinggo Toll Road
Southeast end Port of Ketapang
Location
Country Indonesia
Provinces East Java
Major cities
Highway system

Probolinggo–Banyuwangi Toll Road (Probowangi Toll Road) is a toll road in East Java. The toll road will connect Probolinggo Regency, Situbondo Regency and Banyuwangi Regency. The toll road will be integrated with Port of Ketapang to allow crossing from Java to Bali. The toll road is the final phase of Trans-Java Toll Road with Port of Merak on the western end. It is currently under route planning phase, but the construction of the first phase of this toll road was expected to be operational around 2024. [1]

History

The groundbreaking for the first section of the toll road was done on 6 February 2023 by the Minister of Public Works and Housing, Basuki Hadimuljono with expectations that the first phase will be operating in 2024. [2]

Sections

The toll road is divided into 6 sections:

  • Section 1: Kraksaan–Paiton, 15.75 km (9.79 mi)
  • Section 2: Paiton–Besuki, 21.89 km (13.60 mi)
  • Section 3: BesukiSitubondo, 43.48 km (27.02 mi)
  • Section 4: Situbondo–Asembagus, 17.65 km (10.97 mi)
  • Section 5: Asembagus–Bajulmati, 43.61 km (27.10 mi)
  • Section 6: Bajulmati– Ketapang, 21.45 km (13.33 mi)