From Wikipedia, the free encyclopedia
NRC regions and locations of nuclear reactors, 2008
Map of the NRC Regions

The Nuclear Regulatory Commission has divided the US territory into four regions: [1]

Region Regional Office Location Reactors NPP sites
Region I [2] King of Prussia, Pennsylvania North-east 25 16
Region II [3] Atlanta, Georgia South-east 33 17
Region III [4] Lisle, Illinois Northern mid-west 23 15
Region IV [5] Arlington, Texas Southern midwest and west 19 13
Total 100 61

Tasks

These four regions oversee the operation of 104 power-producing reactors, and 36 non-power-producing reactors. This oversight is done on several levels, for example:

  • Each power-producing reactor site has Resident Inspectors, who monitor day-to-day operations
  • Numerous special inspection teams, with many different specialties, routinely conduct inspections at each site
  • Whistleblower reports are investigated by the Office of Enforcement, specifically the Allegations branch [6]

Region I

Map of Region I

Headquartered in King of Prussia, Pennsylvania, Region I oversees 15 plants in the north-eastern United States.

Connecticut

Maryland

Massachusetts

New Hampshire

New Jersey

New York

Pennsylvania

Region II

Map of Region II

Headquartered in Atlanta, Georgia, Region II oversees 18 plants in the south-eastern United States.

Alabama

Florida

Georgia

North Carolina

South Carolina

Tennessee

Virginia

Region III

Map of Region III

Headquartered in Lisle, Illinois, Region III oversees 15 plants in the northern mid-western United States.

Illinois

Iowa

Michigan

Minnesota

Ohio

Wisconsin

Region IV

Headquartered in Arlington, Texas, Region IV oversees 12 plants in the southern midwestern and the western United States.

Arizona

Arkansas

California

Kansas

Louisiana

Mississippi

Missouri

Nebraska

Texas

Washington

Former regions

The NRC previously had five regions. Region V was headquartered in Walnut Creek, California and was responsible for activities in the seven far-west states: Alaska, Arizona, California, Hawaii, Nevada, Oregon and Washington. The NRC decided in September 1993 to consolidate Regions IV and V into a single Region headquartered in Arlington, Texas. [7] On April 4, 1994, NRC Region V was abolished, and the NRC Region IV office in Arlington, Texas was given expanded responsibilities to include the seven states formerly governed by Region V. [8] [9] The former NRC Region V office in Walnut Creek remained open as the redesignated Walnut Creek Field Office, supporting resident inspection activities at power plants in the Pacific states of Washington, Oregon and California [8] until October 1, 1998, when the Walnut Creek Field Office was abolished to further reduce costs. [10] [11] [12] [13]

References

  1. ^ "NRC: Locations".
  2. ^ "NRC: Region I Jurisdiction".
  3. ^ "NRC: Region II Jurisdiction".
  4. ^ "NRC: Region III Jurisdiction".
  5. ^ "NRC: Region IV Jurisdiction".
  6. ^ "NRC: Allegations".
  7. ^ "NRC to restructure regional functions in west; Walnut Creek to be Field Office" (PDF) (Press release). Washington D.C.: Nuclear Regulatory Commission. September 22, 1993. Retrieved December 3, 2014.
  8. ^ a b "NRC Administrative Letter 94-08: Consolidation of the NRC Region IV and Region V Offices" (PDF). Letter to "All holders of operating licenses or construction permits for nuclear reactors". July 13, 1994. Retrieved December 3, 2014.{{ cite press release}}: CS1 maint: others ( link)
  9. ^ "Consolidation of two NRC western Regions effective on April 4" (PDF) (Press release). Washington D.C.: Nuclear Regulatory Commission. March 30, 1994. Retrieved December 3, 2014.
  10. ^ Callan, L. Joseph (December 18, 1997). "Walnut Creek Field Office (WCFO) Closure Plan" (PDF). Letter to "The [NRC] Commissioners". Retrieved December 3, 2014.
  11. ^ "NRC to close California Field Office in 1998" (PDF) (Press release). Washington D.C.: Nuclear Regulatory Commission. September 5, 1997. Retrieved December 3, 2014.
  12. ^ "NRC California Field Office to close September 30" (PDF) (Press release). Arlington, Texas: Nuclear Regulatory Commission Region IV. September 23, 1998. Retrieved December 3, 2014.
  13. ^ "NRC Administrative Letter 98-08: Availability of Revised NRC Form 3, "Notice to Employees" and Closure of NRC Walnut Creek Field Office" (PDF). Letter to "All NRC licensees". October 9, 1998. Retrieved December 3, 2014.{{ cite press release}}: CS1 maint: others ( link)