From Wikipedia, the free encyclopedia
Federal Highway 70D shield
Federal Highway 70D
Carretera federal 70D
Route information
Maintained by Caminos y Puentes Federales
ExistedOctober 1, 2013 (Ríoverde-Ciudad Valles)–present
Autopista Ríoverde - Ciudad Valles - Tamuín
Length117.6 km (73.1 mi)
West end Fed. 70 in Rayón, San Luis Potosí
Major intersections Fed. 85 south of Ciudad Valles, San Luis Potosí
East end Fed. 70 east of Tamuín, San Luis Potosí
Libramiento Poniente de Tampico (Maxi Libramiento Tampico)
Length13.6 km (8.5 mi)
North end Fed. 80 in Altamira, Tamaulipas
South end Fed. 70 in Tampico, Tamaulipas
Autopista Guadalajara-Puerto Vallarta (Red Via Corta a Puerto Vallarta)
Length184.0 km (114.3 mi)
West end Fed. 15D in Jala, Nayarit
Major intersections Fed. 15 in Ahuacatlan, Nayarit

Fed. 200D near Mazatan, Nayarit

Fed. 200 near Las Varas, Nayarit
East end Fed. 200 near Puerto Vallarta, Jalisco
Location
Country Mexico
Highway system

Federal Highway 70D is the designation for toll highways paralleling Mexican Federal Highway 70.

San Luis Potosí

The 68.5 kilometres (42.6 mi) of the highway from Ríoverde to Ciudad Valles, and another 49.1 kilometres (30.5 mi) connecting Ciudad Valles to Tamuín while bypassing both cities, form Highway 70D in San Luis Potosí, legally known as Rayón-Entronque Tamuín. [2] The former segment entered service on October 1, 2013; the latter was formally opened on July 6, 2016. [3]

Libramiento Poniente de Tampico

The 13.6 kilometres (8.5 mi) is second segment of Highway 70D is located in Tamaulipas. It is also known as the Libramiento Poniente de Tampico (Tampico Western Bypass) or the Maxi Libramiento Tampico. The road is operated by Caminos y Puentes Federales, which charges a toll of 26 pesos per car to travel the full length of Highway 70D. [4]

Autopista Guadalajara-Puerto Vallarta (Red Via Corta a Puerto Vallarta)

The 184.0 kilometres (114.3 mi) [5] is the 3rd segment of the Highway 70D it Will serve to bypass Mexican Federal Highway 68D so it can cut time to Puerto Vallarta from 4 hrs to 1 hr 30 min. The total cost of the segment is 134 pesos To ride Completely. [6] From Jala to Compostela the 55.1 kilometres (34.2 mi) [7] road is open and fully operational since February 13, 2017. The rest of the Highway from Compostela and Las Vartas to Puerto Vallarta is under construction, this 128.9 kilometres (80.1 mi) stretch has no set opening date due to the delays of construction since it does not have the necessary environmental and right-of-way permits issued by the SEMARNAT and the SCT and also, due to lack of resources from the public budget caused by the COVID-19 pandemic.

The Highway is maintained by three different operators. First, the 55.1 kilometres (34.2 mi) Jala to Compostela road stretch is Maintained by OCACSA. [8] Second, the under construction and unopened 128.9 kilometres (80.1 mi) stretch or road from Compostela to Puerto Vallarta will be maintained by CAPUFE from Compostela to Las Varas. Finally, from Las Varas to Puerto Vallarta it will be maintained by Autopista Las Varas - Puerto Vallarta S.A. de C.V. a subsidiary of Impulsora del Desarrollo Económico de América Latina (IDEAL) [9] owned by Carlos Slim and his company Grupo Carso. [10]

External links

References

  1. ^ Datos Viales - Tamaulipas, SCT, 2017
  2. ^ Datos Viales - San Luis Potosí, SCT, 2017
  3. ^ Zaragoza, Martha (6 July 2016). "Inauguran autopista Ciudad Valles-Tamuín en la Huasteca potosina". El Financiero. Retrieved 23 February 2017.
  4. ^ Tarifas Vigentes, CAPUFE, 31 January 2017
  5. ^ Cartera de proyectos de inversion de Estado de Nayarit 2019, Gobierno de Nayarit, 2019
  6. ^ "Tarifas".
  7. ^ Datos Viales - Nayarit, 2020
  8. ^ OCACSA, retrieved 23 April 2020
  9. ^ IDEAL, retrieved 23 April 2020
  10. ^ "Grupo Carso". Retrieved 23 April 2020.