History | |
---|---|
Name | Wishkah |
Owner | Washington State Department of Transportation |
Operator | Washington State Ferries |
Port of registry | Seattle, Washington, United States |
Builder | TBD |
In service | 2027 (planned) |
Status | Planned |
General characteristics | |
Class and type | Olympic-class auto/passenger ferry |
Displacement | 4,384 long tons (4,454 t) |
Length | 362 ft 3 in (110.4 m) |
Beam | 83 ft 2 in (25.3 m) |
Draft | 18 ft (5.5 m) |
Depth | 24 ft 6 in (7.5 m) |
Decks | 5 (2 vehicle decks, passenger deck, sun deck, nav bridge deck) |
Deck clearance | 16 ft (4.9 m) |
Propulsion | Hybrid diesel–electric |
Capacity |
|
Crew | 14 (12 with sun deck closed) |
Notes | All specifications subject to change |
MV Wishkah is a future Olympic-class ferry that will be operated by Washington State Ferries. The vessel will use a hybrid diesel–electric engine and is expected to enter service in 2027, [1] with a capacity of 144 cars and 1,500 passengers. The ferry was named for the Wishkah River on the Olympic Peninsula. [2]
The vessel is planned to be used on the Mukilteo–Clinton ferry, which is also served by sister vessel MV Suquamish. [3]