The
Massachusetts Bay Transportation Authority (MBTA) operates
152 bus routes in the
Greater Boston area. The MBTA has a policy objective to provide transit service within walking distance (defined as 0.25 miles (0.40 km)) for all residents living in areas with population densities greater than 5,000 inhabitants per square mile (1,900/km2) within the MBTA's service district. Much of this service is provided by bus. In 2023, the system had a ridership of 91,459,700, or about 303,300 per weekday as of the fourth quarter of 2023.
Most MBTA bus routes are local service operated in
Boston and its inner suburbs and connect to
MBTA subway stations. Fifteen high-ridership local routes are designated as
key routes, with higher frequency at all operating hours. The MBTA operates a five-route
bus rapid transit service branded as the
Silver Line, as well as
two limited-stop crosstown routes. Three smaller local networks are based in the nearby cities of
Lynn,
Waltham, and
Quincy. Several express routes operate from suburbs to downtown Boston.
Most routes are operated directly by the MBTA. Five suburban routes are run by private operators under contract to the MBTA, while several small circulator systems are run by other operators with partial MBTA subsidy. MBTA-operated buses operate from nine garages, one of which is under reconstruction and a second planned for replacement. Several sections of dedicated right-of-way for MBTA buses have been opened in the 21st century, including two off-street busways for the Silver Line and a number of dedicated bus lanes.
The modern bus system descends from
a network of horsecar and electric streetcar lines built in the 1850s to 1910s, which were consolidated under the
West End Street Railway and later
Boston Elevated Railway (BERy). The BERy introduced buses in 1922 to replace lightly-used streetcar lines and expand into new areas. Over the next four decades under the BERy and Metropolitan Transit Authority (MTA), all but six streetcar routes were converted to bus or trolleybus. Most trolleybuses were phased out by the 1960s, but four routes lasted until 2022. The MBTA took over the MTA in 1964, and several private suburban bus operators over the following two decades. Many routes have been modified during the MBTA era; the agency introduced crosstown routes in 1994 and the Silver Line in 2002.
History
A number of
horsecar lines were built in Boston and surrounding towns in the second half of the 19th century, beginning with the
Cambridge Railroad in 1856. Several smaller companies were consolidated into the
West End Street Railway in 1887. The West End began electrifying existing lines and constructing new streetcar lines; the last horsecar lines ended in 1900. The West End was purchased in 1897 by the
Boston Elevated Railway (BERy), which had been created to build a
rapid transit system in Boston. As that system was constructed in the first two decades of the 20th century, many streetcar lines were cut back from downtown Boston to rapid transit stations. Stations like
Sullivan Square,
Dudley Square,
Forest Hills,
Harvard, and
Andrew were built as transfer stations with easy connections between subway and rapid transit.
Some small companies operated buses in Boston as early as the 1910s. BERy bus service began on February 23, 1922, when buses replaced the
North Beacon Street streetcar line.[4] Initial bus routes largely replaced lightly-used streetcar lines or expanded service to new areas. The BERy also attempted in the 1920s to make the
Tremont Street streetcar subway operate more like a rapid transit line, using trains of streetcars entering the subway from a small number of feeder lines, rather than single streetcars from numerous surface lines.[5] The
Harvard–Lechmere streetcar line was converted to trackless trolley (
trolleybus) on April 11, 1936 – the first route in what would become
an extensive trackless trolley system.[6]
As increased automobile usage reduced ridership and increased congestion, the BERy and its 1947 replacement Metropolitan Transit Authority (MTA) continued to convert streetcar lines to bus and trolleybus. Most trolleybus lines were replaced by buses in the late 1940s to early 1960s, as buses offered increased flexibility and no need to maintain overhead lines. When the
Massachusetts Bay Transportation Authority (MBTA) replaced the MTA in 1964, all surface lines were operated by buses except six streetcar lines (the five
Green Line branches plus the
Mattapan Line) and four trolleybus lines.[7] The MBTA rebranded many elements of Boston's public transportation network in its first decade. After being found unsuitable in 1965 for the
Orange Line because it did not show up well on maps, yellow was chosen for the color of bus operations on January 8, 1972.[8][9]
The MBTA had primarily been formed to subsidize the
suburban commuter rail network. However, the agency also took over unprofitable suburban bus operations – much of which was former streetcar lines – from several private companies. The MBTA took over the
Eastern Massachusetts Street Railway in 1968, inheriting large networks based in
Lynn and
Quincy plus several lines in
Norwood and
Melrose. (Networks serving
Lowell,
Lawrence, and
Brockton outside the MBTA district were briefly operated by the MBTA. They were transferred to new public agencies: the
LRTA in Lowell in 1976, a predecessor of the
MVRTA in Lawrence in 1968, and a predecessor of the
BAT in Brockton in 1969.) The MBTA began subsidizing
Middlesex and Boston Street Railway service based in
Newton and
Waltham in 1964, and took over the remaining routes in 1972. Five former Service Bus Lines routes in northeast suburbs were taken over in 1975, and a single Brush Hill Transportation line in
Milton was taken over in 1980.[7]
The geographic scope of the MBTA bus network has remained relatively constant since these additions, though many services have been created, discontinued, and modified during the MBTA era. The openings of new sections of the Red Line (1971, 1980, 1984–85) and the Orange Line (1975–77, 1987) have resulted in significant changes as routes were modified to serve new transfer stations.[7] Three
limited-stop crosstown routes were created in 1994 as a prelude to the
Urban Ring Project, a never-implemented circumferential
bus rapid transit (BRT) corridor.
Silver Line BRT service began in 2002 with conversion of existing bus service on Washington Street, and was expanded in 2004–05 with new routes serving the
Waterfront Tunnel in the Seaport District. The latter used
dual-mode buses that operated as trolleybuses in the Waterfront Tunnel and as diesel buses on the surface. A second Silver Line service using the Washington Street corridor was added in 2009, and service from the Waterfront Tunnel to
Chelsea began in 2018 with a new surface busway in Chelsea.[7]
The BERy and MTA operated overnight
Owl service until 1960. From September 2001 to June 2005, the MBTA operated bus service on 17 routes (7 normal bus routes and 10 routes replicating subway lines) until 2:30am on Friday and Saturday nights. Similar service on the
key routes was operated from March 2013 to March 2014.[7] In 2017, the MBTA Board rejected a proposal to run all-night service on several routes with pulsed connections at a central hub.[10]
In 2018, the MBTA began planning for the Bus Network Redesign, a reworking of the entire bus network.[11] A draft plan was released in May 2022, with a revised plan in November 2022.[12][13] That plan was approved in December 2022. It increases overall service by 25%, with a doubling of the number of routes with high-frequency service. As of April 2024[update], the first changes are planned to be made in December 2024, with additional changes through 2028.[11]As of April 2024[update], the change is planned to occur in December 2024.[14]
In 2022, the MBTA started cutting bus service due to a driver shortage resulting from a long-term retirement trend accelerated by the
COVID-19 pandemic in Massachusetts. Despite paying for training to get a
commercial driver's license and offering a $4,500 signing bonus, it ended the year short about 350 drivers, plus about 400 more needed to increase service to implement a proposed bus network redesign. Experts said the shortage was caused by the failure to raise the starting hourly wage, and offer new hires full-time work instead of forcing all of them to start part-time. Drivers were also unhappy about lack of access to bathrooms and "split shifts" with unpaid time between morning and evening rush hour that was too short to go home.[15] The MBTA began hiring operators for full-time work in 2023.[16]
Fleet
This is the current bus roster for the MBTA as of February 2024[update]. All buses are 102 inches (260 cm) wide; most buses are 40-foot (12 m) length, while 117 are 60-foot (18 m)
articulated buses.[1] An additional 80 New Flyer 40-foot battery-electric buses were ordered in July 2023, with the first ten to be delivered in 2024 and the remainder in 2025–26. Thirty-two of those buses will have left-side doors for use in the
Harvard bus tunnel.[17][18]
The
North Cambridge bus facility, which was used by
trackless trolleys until March 2022, is to be modified for battery-electric buses. A $27.3 million contract was issued in October 2023, with completion expected in November 2025.[20]
The MBTA plans to replace Quincy Garage with a larger facility near
Quincy Adams station.[21] The parcel was purchased for $38.2 million in March 2021.[22] Early work, including demolition of an existing building at the site, was completed in mid-2022.[23] Bids in May 2022 came in higher than expected – $360 million versus $280 million – prompting the MBTA to switch to Construction Management at Risk bidding for the project.[24] As of October 2023[update], the work is expected to cost $299 million, with substantial completion in March 2027.[23]
A replacement of Arborway Garage on-site is planned to be completed in 2028. It will expand the fleet at that garage from 118 CNG buses to 200 battery-electric buses, including articulated buses for routes 28, 32, and 39.[25]
In July 2022, the MBTA indicated plans to purchase an adjacent parcel to expand Southampton Garage.[26]
Most local bus routes in Massachusetts outside the immediate MBTA operating area are operated by the state's other regional transit authorities (RTAs). However, some routes that connect with MBTA bus or subway service are operated by outside private contractors with partial subsidy by the MBTA.
[27]
Five routes – the
710,
712/
713,
714, and
716 – are numbered like other MBTA buses. The five routes are primarily commuter routes which connect with other MBTA services at their inbound terminals. They were taken over from various private operators (Hudson Bus Lines for the 710 and 716, Rapid Transit Inc. for the 712/713, and Nantasket Transportation for the 714).[7] The 712 and 713 use MBTA-provided buses and accept Charliecards; the other routes do not.
Four suburban municipalities contract with outside operators for local circulator routes, most with partial MBTA subsidy.
Bedford and
Beverly run single routes,
Burlington runs five routes, and
Lexington runs six.[7] Most are run by private operators, except for the Beverly Shuttle, which is part of the
Cape Ann Transportation Authority system. Additionally, a nonprofit shuttle is run in Boston's
Mission Hill neighborhood.[7] Those routes appear on MBTA system maps and connect with MBTA services at designated transfer points, but are numbered separately and do not accept MBTA passes.
Bus lanes
Several sections of dedicated right-of-way for MBTA buses have been opened in the 21st century. Two sections of the Silver Line have off-street busways: The 2004-opened 1.2-mile (1.9 km)
South Boston Piers Transitway tunnel in the Seaport (used by the
SL1,
SL2,
SL3, and
SLW), and a 2018-opened 1.1-mile (1.8 km) surface busway in
Chelsea used by the SL3. A direct ramp to the
Ted Williams Tunnel is
proposed for use by the SL1 and SL3.
A number of dedicated bus lanes on surface streets are also in use:
1.6 miles (2.6 km) between
Melnea Cass Boulevard and Kneeland Street (including a short southbound contraflow section), with an additional 0.3 miles (0.48 km) northbound-only between Stuart Street and Temple Place. The lanes are used by Silver Line routes
SL4 and
SL5, as well as local routes
8,
10, and
11. The southern section was opened in 2002 with the introduction of Silver Line service; the portion north of Herald Street (northbound) and Marginal Street (southbound) was added in mid-2020 along with a lane on Temple Place.[28]
0.9 miles (1.4 km) of northbound morning-peak-only bus/bike lane between Roslindale and
Forest Hills was added in June 2018 following a test that May. The section is used by routes
30,
34,
34E,
35,
36,
37,
40,
50, and
51.[29] 1.5 miles (2.4 km) of southbound evening-peak-only lane was added in early 2021.[30]
Essex Street, Boston: Two eastbound segments totaling 0.2 miles (0.32 km), opened in 2009 for use by the SL4.[31]
Broadway, Sweetser Circle, and Main Street, Everett: A 1.1-mile (1.8 km) morning-peak-only southbound bus lane on Broadway from Henry Street to Sweetser Circle (routes
97, 104, 109,
110,
112) was opened in 2017 after a 2016 test.[32] A 0.4-mile (0.64 km) northbound evening-peak-only lane on Broadway from Sweetser Circle to Chelsea Street, a 0.15-mile (0.24 km) northbound evening-peak-only lane on Main Street from Sweetser Circle to Oakes Street (routes
99, 105,
106), and an all-day lane around Sweetser Circle were added in October 2020.[33][34]
Prospect Street, Somerville: a 0.1-mile (0.16 km) northbound bus/bike lane (routes
91,
CT2) opened in 2017.[35]
Mount Auburn Street and Belmont Street, Cambridge and Watertown: Three segments totaling 0.6 miles (0.97 km), installed in October 2018 for routes
71 and
73.[36]
Massachusetts Avenue, Cambridge and Arlington: 0.5 miles (0.80 km) of southbound bus lane from Sidney Street to Memorial Drive for route
1, opened in November 2018.[37] 0.3 miles (0.48 km) of southbound morning-peak-only bus/bike lane from Varnum Street to
Alewife Brook Parkway for route
77 was installed in October 2019 after a successful test a year before.[38] 0.5 miles (0.8 km) of bus lanes between Dudley Street and Alewife Brook Parkway (route 1) opened in November 2021.[39]
Sullivan Square, Boston: Three short sections of bus-only turn lane on Beacham Street (routes
86, 91, CT2), Maffa Way (
89,
90,
95,
101), and Main Street (
92,
93,
104,
105,
109) for buses entering
Sullivan Square station, installed as part of a 2018–2019 reconfiguration of the station.[40]
Brighton Avenue, Boston: 0.6 miles (0.97 km) of bus/bike lanes between Commonwealth Avenue (
Packards Corner) and Union Square, used by routes
57,
57A, and
66. The eastbound lane was opened in June 2019, followed by the westbound lane that October.[41]
Broadway, Somerville: 0.9 miles (1.4 km) of bus/bike lanes between
Magoun Square and Fellsway West for routes
89 and
101, opened in August 2019.[41]
North Washington Street, Boston: 0.15 miles (0.24 km) of southbound bus/bike lane (route 92, 93,
111,
426, and
428) from Causeway Street to Beverly Street opened in August 2019.[41] A 0.3-mile (0.48 km) northbound bus lane from Sudbury Street to Causeway Street opened in August 2021.[42]
Summer Street, Boston: 0.14 miles (0.23 km) of westbound bus lane between Dorchester Avenue and Atlantic Avenue for routes
4 and
7, opened in October 2019.[41] An additional 1.4 miles (2.3 km) of bus/truck lanes between Dorchester Avenue and East First Street opened as a six-month pilot in September 2023.[43]
Davis Square, Somerville: queue jumps on Holland Street (routes
87 and
88) and College Avenue (89,
94,
96) opened in 2020.[35]
Broadway, Chelsea: a 0.2-mile (0.32 km) westbound bus lane from 5th Street to 3rd Street for routes
111,
114,
116, and
117 opened in November 2020.[44]
Tobin Memorial Bridge: 1.1 miles (1.8 km) of westbound bus lane for route 111 (a 12-month pilot) opened in December 2020.[45]
Florence Street, Malden: a 0.2-mile (0.32 km) westbound bus/bike lane opened in December 2020.[46]
Washington Street, Somerville: a westbound bus/bike queue jump at McGrath Highway (routes
86,
91,
CT2) and queue jumps west of Union Square (route 86) were added in 2020-21.[35]
North Common Street, South Common Street, and Market Street, Lynn: 0.75 miles (1.21 km) of bus/bike lanes for routes
426/
426W and
455 opened in April 2021.[47]
Columbus Avenue, Boston: 0.7 miles (1.1 km) of center-running lanes between Walnut Street and
Jackson Square (routes
22,
29,
44) with boarding islands opened in October 2021 – the first center bus lanes in New England.[49]
Interstate 93 north of Boston: A two-year pilot began in December 2021 for use of the
breakdown lane by MBTA buses (routes
325,
326,
352, and
354),
MVRTA buses, and
Logan Express buses between Somerville and I-95. The lanes can be used during peak periods when traffic speeds are below 35 miles per hour (56 km/h).[53]
Dedicated lanes were added on several streets in Boston during the August–September 2022 closure of the Orange Line, of which four were made permanent: Boylston Street from Ring Road to Clarendon Street (routes
9,
39, and
55), Clarendon from Boylston to Columbus Avenue (39 and 55), St. James Avenue from near Berkeley Street to Dartmouth Street (9,
10, 39, 55,
501, and
504), and Huntington Avenue from Brigham Circle to Gainsborough Street (39 and
66).[54]
An additional 1.0 mile (1.6 km) of center lanes on Columbus Avenue and Tremont Street between Jackson Square and
Ruggles is planned for construction in 2024.[55] Other funded projects include
Western Avenue in Lynn between Ida Street and the
Belden Bly Bridge,
Lynnway in Lynn,
Washington Street at Brookline Village, and
Centre Street in downtown Malden.[56][57][58] Additional lanes in Boston announced in 2020 but not yet implemented include Malcolm X Boulevard between
Roxbury Crossing and
Nubian Square, Warren Street between Nubian Square and Grove Hall, and Hyde Park Avenue between Forest Hills and Metropolitan Avenue.[59] Center-running bus lanes are also proposed for
Blue Hill Avenue between Grove Hall and
Mattapan.[60][61]
^Wolfgang, William (June 7, 2023).
"New Vehicle Procurements"(PDF). Accessibility at the MBTA: Update on the MBTA's path towards compliance with the Daniels-Finegold v. MBTA settlement agreement. Massachusetts Bay Transportation Authority. pp. 36–41.