These are the bridges in Dubai that are completed, under construction, proposed or approved.
Bridges in Dubai are operated by Dubai Roads and Transport Authority (RTA).
Bridge | Opened | Length (m) | Cost | Number of lanes | Vehicles per hour |
Al Maktoum Bridge | 1963 | 9,500 | |||
Floating Bridge, Dubai | 16 July 2007 | 300 meters | 155 million dirhams | 12 | 6,000 |
Al Garhoud Bridge | 1976 | 520 metres | 415 million dirhams | 6 | 9,000 |
Business Bay Crossing | June 2007 | 1.6 km | 800 million dirhams | 13 | 26,000 |
Infinity Bridge(Al Shindagha Bridge) | 16 January 2022 | 295 metres | 393 million dirhams | 12 | 24,000 |
Parts of this article (those related to 2019) need to be updated.(November 2019) |
Bridge | Expected completion | Length (m) | Cost | Number of lanes | Vehicles per hour |
Sheikh Rashid bin Saeed Crossing | 2012 | 1.6 km | 2.5 billion dirhams | 12 | 9,500 |
Dubai Smile | 2018 | 300 meters | 810 million dirhams | 12 | 24,000 |
The Fifth Bridge [A] [1] | 2.5 billion dirhams | 12 |
Bridge | Opened | Length (m) | Cost | Number of lanes | Vehicles per hour |
Al Shindagha Tunnel | 1975 | 550
Meters |
394 Million
Dhs |
4 | 15,000 vehicles per hour |
Dubai Airport tunnel | Constructed during the mid 2000s, goes under Dubai Airport | 1500
Meters |
686 Million Dhs | 6 | 1,650 vehicles
Per hour |
Palm Jumeirah tunnel | 2006 [2] | 750 metre [3] | 6 | 3,000 vehicles
per hour |