From Wikipedia, the free encyclopedia
Line 6
Overview
StatusIn operation
Locale Shenzhen, China
Termini
Stations27
Color on map     Aquamarine (#3abca8)
Service
Type Rapid transit
System Shenzhen Metro
Operator(s)SZMC (Shenzhen Metro Group)
Depot(s)Changzhen depot
Minle Stabling Yard
Rolling stockCRRC Puzhen (601-651)(6 cars, type A)
History
Opened18 August 2020; 3 years ago (2020-08-18) [1]
Technical
Line length49.4 km (30.7 mi) [2]
Number of tracks Double-track
CharacterUnderground and elevated
Track gauge1,435 mm (4 ft 8+12 in) standard gauge
Electrification 1,500 V DC third rail ( overhead lines with same voltage installed in depot)
Operating speed100 km/h (62 mph)
SignallingUrbalis 888 CBTC Moving block
Route map

Songgang
11
Left arrow to Futian
to Bitou Right arrow
Xitou
Songgang Park
Shutianpu
Heshuikou
Gongming Square
Honghuashan
Loucun
Science Park
6B
Up arrow to SIAT
 
Guangming
Guangming Street
Fenghuang Town
Changzhen Depot
Changzhen
Shangwu
Guantian
Yangtai Mountain East
Yuanfen
4
Right arrow to Niuhu
 
Shangfen
Hongshan
4
Shenzhen North
4 5 Shenzhen North railway station
Meilinguan
Minle Stabling Yard
Hanling
9
UpperLeft arrow to Qianwan
 
Yinhu
9
9
Right arrow to Wenjin
 
Bagualing
7
Sports Center
Tongxinling
3
Science Museum
1

Line 6 ( simplified Chinese: 六号线; traditional Chinese: 六號線; pinyin: Liùhào Xiàn), also known as the Guangming line ( simplified Chinese: 光明线; traditional Chinese: 光明線; pinyin: Guāngmíng Xiàn) of the Shenzhen Metro is in operation. Line 6 is part of the Phase III expansion of the Shenzhen Metro with a construction time frame scheduled for 2015–2019. [3]

The first phase of Line 6 has a length of 37.6 km (23.4 mi) and a total of 20 stations. [2] It connects Songgang to Shenzhen North station. The southern extension has a length of 11.8 km (7.3 mi) and 7 stations, [2] from Shenzhen North station to Science Museum station. Construction of the first phase started in 2012, [4] with both the original line and south extension opened on 18 August 2020. [1] [5] [6] It is the second metro line in Shenzhen with an operating speed of over 100 km/h (62 mph). Guangming station (formerly known as Cuihu) will have provision for interchange with Dongguan Rail Transit Line 1 which is also under construction. [7] [8] It is envisioned to serve as an interchange with Line 1 and Line 4 of the Dongguan Rail Transit system.

History

Line 6 had a planning history of over 20 years with major design changes along the way. In the 1994 "Shenzhen Urban Passenger Transport Master Plan", Line 6 was a metro line proposed to start from Bao'an International Airport to Songgang, with a line length of about 15 km (9.3 mi). It was envisioned as an extension of the still under planning Line 1 to connect the industrial and manufacturing centers of the then Bao'an County with the Bao'an Airport and the Special Economic Zones of Shenzhen. At the time Bao'an was not part of the Shenzhen Special Economic Zone, the purpose of Line 6 was to promote the development into Bao'an's western corridor and the northern industrial hinterland by extending the reach of the Shenzhen Metro. [9]

In the 2001, Line 6 was proposed to be extended south to Xixiang Subdistrict and east to Gongming Subdistrict creating a 37.5 km (23.3 mi) long line with 16 stations. At that point the alignment of Line 6 bears more resemblance to today's Line 11. By 2003, Line 6 was again redesigned into a 51.8 km (32.2 mi), 15 station, commuter railway in a "∩" shape connecting the Airport with Longhua District via Songgang. With the eastern leg of the "∩" replacing one of the then proposed Line 4 branches, the other which remained a section of Line 4 heading to Qinghu. [10] In 2003, The line was again redesigned back into a metro line from Shenzhen North Railway Station to Songgang with a length of 37.2 km (23.1 mi), and 19 stations with a branch line north to Dongguan. This is the first incarnation of Line 6 that resembles it's alignment today. [11]

In 2011, an additional station, Cuihu (formerly called Lilin), was added between the Guangming Center station and Guangming North station. This was done in anticipation for interchange with Dongguan Rail Transit Line 1 which will now take over the branch line to Dongguan. [12] In order to promote better transport integration and economic development between Dongguan and Shenzhen with the relevant departments of the two cities working together in rail transit planning. [13] During the construction of Line 4 in 2007 to 2011, Shangtang Station reserved space for extra platforms and tracks for cross-platform interchange with Line 6. The station was to be rearranged to accommodate Line 6 when it was being constructed. In addition, Line 4's Longhua depot had supports built with decks designed for Line 6 to run over it. In 2012, Line 6 north of Shenzhen North Station was realigned one block east, dropping the plan to use all these provisions. [14]

On April 10, 2012, Longhua District government held a symposium rail transit construction and the Shenzhen Urban Planning and Land Resources Committee issued the "Shenzhen rail transit planning (revision)". [15] This revised Phase III plan showed that Line 6 will extend further south into central Shenzhen with six new stations, and an additional length of 11.5 kilometers. The Shenzhen Metro Phase III approved by the National Development and Reform Commission does not include the south extension of Line 6. However, in order to reduce the need for passengers heading to the city center to transfer into the already overcrowded Line 4, approval for the southern extension of Line 6 parallel to Line 4 was fast tracked. This extension will improve connectivity, by providing a direct line between Guangming and the city center, and provide relief for the congested Line 4 heading to and from Shenzhen North Station. [12]

Construction

In 2010 the Shenzhen government and MTR Corporation signed a memorandum of cooperation on the construction operation of Line 6 for 30 years under the BOT procurement strategy, similar to Line 4. [16] [17] Funding was approved in April 2013 and construction of the first phase from Shenzhen North Station to Songgang officially started on August 25, 2015, with completion by June 2020. [3] However, due to later negotiation failures between the two parties, Shenzhen Metro Corporation took over the project themselves without the BOT contract as planned.

A notable feature of the project is the section of Line 6 that crosses over Line 4 between Hongshan and Shangtang stations. The angle between the alignments of the two lines is only 11.3°. This means there is significant overlap between the elevated structures of both lines and Line 6 will need to span 100 meters in length order to cross over Line 4. This will be done with a large cable-stayed bridge supported by a single 92 meter high main pier and a bridge length of 140 meters. Making it the first cable-stayed bridge for a metro line for the Shenzhen Metro. [18]

Construction of the Shenzhen section of Dongguan Rail Transit Line 1 started in 2018 as part of Shenzhen Metro's Phase IV expansion known as the "Line 6 branch line project". [7]

Service routes

Stations

  • M - main line services (Before 11:00 PM)
  • S1 - Short line services 1 (From 11:00 PM to 11:30 PM)
  • S2 - Short line services 2 (From 11:00 PM to 11:30 PM)
M S1 S2 Station name Connections Nearby bus stops Distance
km
Location
English Chinese
Songgang 松岗 11   12  Bao'an
Xitou 溪头
Songgang Park 松岗公园
Shutianpu 薯田埔 Guangming
Heshuikou 合水口
Gongming Square 公明广场   13 
Honghuashan 红花山
Loucun 楼村
Science Park 科学公园
Guangming 光明 6B
Guangming Street 光明大街
Fenghuang Town 凤凰城   13 
Changzhen 长圳
Shangwu 上屋   13  Bao'an
Guantian 官田
Yangtai Mountain East 阳台山东 Longhua
Yuanfen 元芬
Shangfen 上芬
Hongshan 红山 4
Shenzhen North 深圳北站 4 5 Shenzhen North railway station IOQ
Meilinguan 梅林关 4 (via Minle)
Hanling 翰岭 Futian
Yinhu 银湖 9 Luohu
Bagualing 八卦岭 7 Futian
Sports Center 体育中心
Tongxinling 通新岭 3
Science Museum 科学馆 1

Branch

Despite being nominally the branch of Line 6, it is actually a separate line, whose color, train type and train numbers are all separated from those of the main line. The section from Shenzhen Institute of Advanced Technology to Guangming opened on 28 November 2022, [19] and the section from Guangming to Guangmingcheng is expected to be opened in 2025. [20]

Rolling stock

Line 6 train
Type Date of manufacture Series Sets Serial number Assembly Notes
Type A 2019–2020 A-size stock 51 0601-0651 Tc+Mp+M+M+Mp+Tc Manufactured by CRRC Nanjing Puzhen

References

  1. ^ a b "官宣!深圳地铁6、10号线8月18日开通初期运营". Shenzhen Metro. 2020-08-16.
  2. ^ a b c "地铁6号线全线贯通 明年年中光明通地铁". 2019-08-30.
  3. ^ a b 地铁6号线主体工程开工---深圳特区报. sztqb.sznews.com. Archived from the original on 2016-12-20. Retrieved 2016-12-11.
  4. ^ Sasin, Jasmin (11 May 2011). "New Metro Lines to Start Construction in September". Shenzhen Standard. Retrieved 23 January 2014.
  5. ^ "地铁6号线项目连续梁顶推成功 预计在2020年6月开通". 2018-10-10.
  6. ^ 地铁6号线10号线预计2019年通车---深圳晚报. wb.sznews.com (in Simplified Chinese). 31 December 2014. Archived from the original on 3 March 2016. Retrieved 11 June 2016.
  7. ^ a b 大手笔!明日深圳5条新地铁齐开工,6号线直通中大深圳校区. 中山大学. Archived from the original on 2018-06-21. Retrieved 2018-07-15.
  8. ^ 黄淳. 深莞惠城际轨道联网指日可待_焦点新闻_深圳新闻网. news.sznews.com. Archived from the original on 2013-12-13. Retrieved 2016-12-11.
  9. ^ Liu Wen (刘文). 香港地铁建设和运营管理研究及对深圳地铁的借鉴. 国际性城市成功管理经验研究. 深圳市涉外培训领导小组. 2000: 97.
  10. ^ 深圳城市轨道交通近中期发展综合规划.
  11. ^ Zhu Qibiao (朱启标). 深圳市规划和国土资源委员会. www.szpl.gov.cn. Archived from the original on 2015-08-01. Retrieved 2016-12-11.
  12. ^ a b 地铁6号线拟直通市中心---宝安日报多媒体数字报刊平台. barb.sznews.com. Archived from the original on 2013-12-20. Retrieved 2016-12-11.
  13. ^ 规划建设区域轨道交通网络---深圳商报多媒体数字报刊平台. szsb.sznews.com. Archived from the original on 2017-08-10. Retrieved 2016-12-11.
  14. ^ Liu Shixiong (刘世雄); Chen Fugui (陈福贵) (2013). 深圳地铁6号线运营成本测算研究. 现代城市轨道交通 [Modern Urban Rail Transit] (1).
  15. ^ 深圳市规划和国土资源委员会. www.szpl.gov.cn. Archived from the original on 2012-11-28. Retrieved 2016-12-12.
  16. ^ 港铁参与建设地铁6号线---深圳商报多媒体数字报刊平台. szsb.sznews.com. Retrieved 2016-12-11.
  17. ^ 港鐵簡訊 (PDF). MTR Shenzhen.
  18. ^ 地铁6号线:打入第一根试桩 - 第一现场 - 城市联合网络电视台. www.cutv.com. Archived from the original on 2015-09-23. Retrieved 2016-12-11.
  19. ^ 杨洪权. 深圳:下月起将陆续新开通5条地铁线. news.dayoo.com. Retrieved 2022-09-15.
  20. ^ 深圳地铁四期调整路线五个项目开工 预计2025年陆续通车