From Wikipedia, the free encyclopedia
Metro line in Qingdao, China
Line 3
Status In operation Owner Government of
Qingdao Locale
Qingdao ,
China Termini Stations 22 Type
Rapid transit System
Qingdao Metro Services 1 Operator(s)
Qingdao Metro Corporation Rolling stock Chinese Type B1 Opened December 16, 2015; 8 years ago (2015-12-16 ) (North section); December 18, 2016; 7 years ago (2016-12-18 ) (South section) Line length 24.8 km (15.41 mi) Number of tracks 2 Character Underground
Track gauge 1,435 mm (4 ft 8+ 1 ⁄2 in )
Line 3 train
Line 3 of
Qingdao Metro (
Chinese : 青岛地铁3号线 ) is an underground
metro line in
Qingdao . The north section began operation on December 16, 2015,
[1] and the south section began operation on December 18, 2016.
[2]
Opening timeline
Segment
Commencement
Length
Station(s)
Name
Qingdao North Railway Station — Shuangshan
16 December 2015
12.0 km (7.46 mi)
10
Phase 1 (northern section)
Shuangshan — Qingdao Railway Station
18 December 2016
12.8 km (7.95 mi)
12
Phase 1 (southern section)
Stations
Shuangshan station
References
Line 3 Lines and stations that are proposed, under planning or under construction are shown in italics .