From Wikipedia, the free encyclopedia
Line 3
  3 
Overview
Other name(s)R3
StatusUnder Planning
Locale Dongguan, Guangdong, China
Termini
  • Jiaoyiwan [1]
  • Dongguan East railway station [1]
Stations20 (Phase 1)
Service
Type Rapid transit
System Dongguan Rail Transit
Operator(s)Dongguan Rail Transit Corporation, Limited (东莞市轨道交通有限公司)
Technical
Line length51.5 km (32.0 mi) [1] (Phase 1)
Number of tracks2
CharacterUnderground (Phase 1)
Track gauge1,435 mm (4 ft 8+12 in)

Line 3 of the Dongguan Rail Transit ( Chinese: 东莞轨道交通3号线; pinyin: Dōngguǎn Guǐdào Jiāotōng Sān Hào Xiàn) is a planned rapid transit line in Dongguan, Guangdong Province, China. It has a planned 24 stations from Dongguan East railway station in the Northeast of Dongguan, to Jiaoyiwan in the south of Dongguan. [1] The construction date for Line 3 has not yet been published. [2]

Stations

List of stations of Line 3 (Phase 1) [3]

  • Jiaoyiwan
  • Jiaoyiwanbei
  • Chang'an Jian'an Road
  • Chang'an Jinsha
  • Chang'an Wushacun
  • Chang'an Pedestrian Street
  • Chang'an Coach Terminal
  • Haiyue Garden
  • Songshanhu Headquarters
  • Jinduogang
  • Songshanhu University Town
  • Songshanhu
  • Songshanhubei
  • Dongkeng Avenue
  • Changping Beihuan Road
  • Changpingbei
  • Changping railway station
  • Dongguan East railway station

List of planned lines

See also

References

  1. ^ a b c d "国家发展改革委关于调整东莞市城市轨道交通第二期建设规划方案的批复". 2022-04-22. 3号线一期起于交椅湾站,终于东莞东站,全长51.5公里
  2. ^ "东莞轨道交通". Dongguan Rail Transit. 2011-06-01. Archived from the original on 2012-03-30. Retrieved 2011-08-14.
  3. ^ "地铁3号线一期将在滨海湾设始发站". 2022-04-14. 站点具体包括交椅湾站、交椅湾北站、长安建安路站、长安金沙站、长安乌沙村站、长安步行街站、长安汽车总站、海悦花园站、松山湖企业总部站、金多港站、松山湖大学城站、松山湖站、松山湖北站、东坑大道站、常平北环路站、常平北站、常平火车站和东莞东站

External links