From Wikipedia, the free encyclopedia
Line 28
  28 
Construction site in February 2021
Overview
Other name(s)M28 (planned name)
CBD line
StatusUnder construction [1]
Locale Chaoyang district
Beijing
Termini
Stations9
Service
Type Rapid Transit
System Beijing Subway
Rolling stock6-car Type LB
History
Planned opening2029; 5 years' time (2029) (planned) [2]
Technical
Line length8.877 km (5.516 mi) (Phase 1) [3]
CharacterUnderground
Operating speed80 km/h (50 mph) [3]
Route map

Dongdaqiao
Jintai Xizhao
Left arrow inner – outer Right arrow
Guanghualu
Hexinqu
Dawang Lu
Line 14
Beijing East railway station
Dajiaoting
Guangqulu
Guangqudonglu
Guangqudonglu depot

Line 28 of the Beijing Subway ( Chinese: 北京地铁28号线; pinyin: běijīng dìtiě èrshíbā hàoxiàn) is a rapid transit line under construction in Beijing. It was formerly known as CBD line.

Construction started in July 2021. [1] It is planned to open in 2029. [2]

List of stations

Station Name [4] Connections Distance
km
Location
English Chinese
Dongdaqiao 东大桥   6    17    Pinggu  Chaoyang
Jintai Xizhao 金台夕照   10    Pinggu 
Guanghualu 光华路
Hexinqu 核心区
Dawang Lu 大望路   1    14 
Beijing East railway station 北京东站 Sub-Central Beijing East railway station BOP
Dajiaoting 大郊亭   7 
Guangqulu 广渠路
Guangqudonglu 广渠东路

History

In August 2015, planning authorities proposed an underground automatic people mover (APM) line through the Central Business District (CBD). [5]

According to the most recent plan announced in August 2019, the line will run 8.877 km (5.516 mi), have 9 stations from Dongdaqiao to Guangqudonglu. [3] The line was redesigned into a higher capacity light metro line, not an automatic people mover (APM). [3]

A feasibility study for the line was approved in October 2020. [4]

Construction started in July 2021. [1]

Rolling stock

It will use 6-car Type LB linear motor rolling stock, similar to the Capital Airport Express of Beijing Subway, and Guangzhou Metro's Line 4, Line 5 and Line 6. [1]

References

  1. ^ a b c d "北京地铁28号线首站启动建设". 2021-07-27.
  2. ^ a b "多座车站开工建设,这条下穿CBD的北京地铁线有了新消息". www.bjews.com.cn. 2023-11-18. Archived from the original on 2023-11-19. Retrieved 2023-12-19.
  3. ^ a b c d "北京地铁28号线最新车站方案公布:5座车站可以换乘". 2019-08-20.
  4. ^ a b www.bjnews.com.cn. "地铁28号线可行性研究报告批复,纳入今年北京市政府重点工程". www.bjnews.com.cn. Retrieved 2020-10-21.
  5. ^ Cao Zheng (曹政) (13 August 2015). CBD拟通'地下小火车:初步设8站 呈Z形斜穿'. Beijing Daily. Archived from the original on 26 November 2015. Retrieved 12 November 2015.