From Wikipedia, the free encyclopedia

Inglewood Transit Connector
Rendering of the proposed Inglewood Transit Connector
Overview
OwnerCity of Inglewood
Locale Inglewood, California
Stations3
Website envisioninglewood.org/transportation-solutions/itc/
Service
Type Automated people mover
Rolling stock Alstom Innovia APM 300
History
Planned opening2030
Technical
Line length1.6 mi (2.6 km)
CharacterFully elevated
Route map

Market Street Station
K Line 
MSF
Forum Station
Hollywood Park Station

The Inglewood Transit Connector Project is a proposed 1.6-mile (2.6 km) fully elevated, automated people mover system in Inglewood, California, that will connect the Downtown Inglewood station on the K Line of the Los Angeles Metro Rail system to the major sports and entertainment venues in the city: Kia Forum, SoFi Stadium, Hollywood Park Casino and the under-construction Intuit Dome. The project was planned to break ground in 2024 and begin operations in late 2027, ahead of the 2028 Summer Olympics that will use some of the venues. However, the Federal Transit Administration (FTA) currently reports that the transit connector will not open for revenue service until early 2030. [1]

The project is being managed by the Inglewood Transit Connector Joint Powers Authority. [2] The JPA is a partnership between the City of Inglewood and the Los Angeles County Metropolitan Transportation Authority (Metro), representing the County of Los Angeles.

History

Map of the proposed Inglewood Transit Connector

The project is part of the Envision Inglewood plan, that was the culmination of several transportation and mobility initiatives to be undertaken by the City including a citywide event transportation management and operations plan, mobility plan, neighborhood protection plan, and the Inglewood Transit Connector Project that would connect the under-construction Downtown Inglewood station on the Metro K Line to Kia Forum, SoFi Stadium, mixed-use development at Hollywood Park, and the Intuit Dome. [3] [4]

In April 2020, the City was awarded $95.2 million from the California State Transportation Agency's Transit and Intercity Rail Capital Program, [5] and in July 2021 Metro allocated $233.7 million in Measure R sales tax funds. [6] As of 2021, the City has secured approximately $328.9 million in committed funding for the implementation of the Project out of the $2 billion dollars needed. [7] By the close of 2023, the project had secured $873 million in local, state, and federal funds. [8] In January 2024, the FTA announced an $1 billion commitment towards the project via a Capital Investment Grant, covering 50% of the approximately $2 billion total project cost. [1]

Procurement

The City plans to complete the project using an alternative delivery approach as public–private partnership. In December 2021, the City has launched the procurement process for the project with two parallel requests for qualifications (RFQ) issued to the private sector: one for the design, construction, financing, operations and maintenance of the project and one for the proposed the transit technology to be used. [9]

System

The automated transit system will be fully elevated and travel from the Metro K Line's Downtown Inglewood Station at Market Street/Florence Avenue southbound along Market Street, eastbound along Manchester Boulevard, southbound along Prairie Avenue and terminate at Hardy Avenue. The Project will have three stations including one at Market Street / Florence Avenue, Manchester Boulevard / Prairie Avenue, and Hardy Street / Prairie Avenue. [10] The transit system technology and vehicles are expected to be selected through a competitive procurement process. [11]

References

  1. ^ a b Inglewood Transit Connector Project (PDF) (Report). Federal Transit Administration. Retrieved January 5, 2024.
  2. ^ JOINT POWERS AUTHORITY - ITC PROJECT
  3. ^ Editorial Board. "Editorial: Want football fans to take transit? Build a people mover to the new Inglewood stadium". Los Angeles Times.
  4. ^ "Inglewood Transportation Infrastructure Plan | Envision Inglewood". Retrieved April 22, 2022.
  5. ^ CalSTA Award Summary (PDF) (Report).
  6. ^ "Metro Source".
  7. ^ "Details Emerge for Proposed Inglewood People Mover". August 12, 2020.
  8. ^ Luczak, Marybeth (January 5, 2024). "Inglewood Transit Connector Project Lands $1B Federal Grant". Retrieved January 5, 2024.
  9. ^ "RFQ deadline extended for Inglewood Transit Connector". February 15, 2022. Retrieved March 2, 2022.
  10. ^ Sharp, Steven (April 21, 2022). "Inglewood City Council approves $1.4B people mover". Urbanize LA. Retrieved April 22, 2022.
  11. ^ Envision Inglewood (PDF) (Report). City of Inglewood. Retrieved April 22, 2020.

External links