6°11′31″S 106°49′21″E / 6.192011°S 106.822436°E
Indonesia 1 Tower | |
---|---|
Indonesia Satu Tower | |
| |
General information | |
Status | Under construction |
Type | Mixed |
Location | Jakarta, Indonesia |
Address | Jalan M.H. Thamrin No.13, Central Jakarta |
Construction started | 2015 |
Completed | 2024 |
Cost | Rp 8 trillion |
Owner | PT China Sonangol Media Investment (2015-2022) PT Surya Indonesia 1 Properti (2022- |
Height | |
Architectural | 303 m (994 ft) & 306 m (1,004 ft) |
Technical details | |
Floor count | 65 & 60 [1] |
Floor area | 204,000 square meters |
Lifts/elevators | KONE |
Design and construction | |
Architect(s) | Mercurio Design Lab PT Anggara Architeam |
Developer | China State Construction Overseas Development Shanghai |
Structural engineer | Davy Sukamta & Partners Structural Engineers |
Main contractor | China Construction Eight Engineering Division - ACSET Indonusa |
Indonesia 1 Tower ( Indonesian: Indonesia Satu Tower) is an under-construction twin towers consisting of north and south towers at Jalan M.H. Thamrin in Central Jakarta, Indonesia. After completion, this will be the tallest twin towers in Indonesia. [2] It is designed by Mercurio Design Lab. [3]
The towers will have offices, stores, condominiums and service apartments. [4] North Tower with height 303 meters and south tower 306 meters . [5] Construction of the tower is expected to be finished by 2021. South Tower is an office building while North Tower is a multi functional building that includes offices, retail space, and service apartments. [6] Pan Pacific Serviced Suites will occupy levels 47 to 58 in the North Tower of Indonesia I. [7]
It will be connected by tunnel to Bundaran Hotel Indonesia station of Jakarta MRT. [8]
Officially launched via Press Conference in Jakarta, 29 August 2019 at Bromo Ballroom, Grand Hyatt Jakarta [9] [10] [11] [12]
The construction was halted in 19 April 2020 due to COVID-19 pandemic. At the end of first quarter in 2022, Indonesian media conglomerate, Media Group acquired the two towers from China-Sonangol International.Ltd. after the cancellation of joint venture between the two. [13] As of October 2022, the construction is ongoing for a completion date in 2024.
{{