PhotosLocation


Healing_railway_station Latitude and Longitude:

53°34′55″N 0°09′37″W / 53.5819°N 0.1604°W / 53.5819; -0.1604
From Wikipedia, the free encyclopedia

Healing
National Rail
General information
Location Healing, North East Lincolnshire
England
Coordinates 53°34′55″N 0°09′37″W / 53.5819°N 0.1604°W / 53.5819; -0.1604
Grid reference TA218110
Managed by East Midlands Railway
Platforms2
Other information
Station codeHLI
Classification DfT category F2
History
Original company Manchester, Sheffield and Lincolnshire Railway
Pre-grouping Great Central Railway
Post-grouping LNER
Key dates
1 April 1881 (1881-04-01)Station opened
Passengers
2018/19Decrease 8,490
2019/20Increase 9,024
2020/21Decrease 886
2021/22Increase 4,808
2022/23Increase 5,932
Notes
Passenger statistics from the Office of Rail and Road

Healing railway station serves the village of Healing in North East Lincolnshire, England. It was opened on 1 April 1881 by the Manchester, Sheffield and Lincolnshire Railway. [1] The station, and all trains serving it, are operated by East Midlands Railway.

Service

All services at Healing are operated by East Midlands Railway using Class 170 DMUs.

The typical Monday-Saturday service is one train every two hours between Cleethorpes and Barton-on-Humber. [2]

There is a Sunday service of four trains per day in each direction during the summer months only. There are no winter Sunday services at the station.

Services were previously operated by Northern Trains but transferred to East Midlands Railway as part of the May 2021 timetable changes. [3]

Preceding station National Rail National Rail Following station
East Midlands Railway

References

  1. ^ Butt, R.V.J. (1995). The Directory of Railway Stations. Yeovil: Patrick Stephens Ltd. p. 117. ISBN  1-85260-508-1. R508.
  2. ^ Table 28 National Rail timetable, May 2021
  3. ^ "May 2021 Timetable Changes - Healing". East Midlands Railway. Retrieved 26 May 2021.

External links