English:
Bocaue Flyover (Bocaue) 14°47'50"N 120°55'44"E toward
Bocaue Bridge (Bocaue) 14°47'54"N 120°55'38"E Replacement of Bocaue Bridge and Approaches (Bocaue River - Pier, Caingin & Biñang 2nd, Bocaue, Bulacan, MacArthur Highway)
Bocaue Bridge over the Bocaue, Bulacan River
Inaugural Drive-Through of the Bocaue Bridge and Approaches inaugurated on 1 March 2013 - the widening and upgrading of
4-lane bridge length of 67.10 linear meters, P57.42 million cost, completed on Dec. 2, 2012 K00 27 + 021 Bocaue River (Caingin & Biñang 2nd, Bocaue, Bulacan, MacArthur Highway)
Barangay
Caingin 14°48'2"N 120°55'29"E beside
Biñang 2nd 14°47'57"N 120°55'49"E
Bocaue, Bulacan along
MacArthur Highway or Manila North Road) MacArthur Highway (Bocaue, Bulacan section) or Manila North Road on another side (Note: Judge Florentino Floro, the owner, to repeat, Donor
Florentino Floro of all these photos hereby donate gratuitously, freely and unconditionally all these photos to and for Wikimedia Commons, exclusively, for public use of the public domain, and again without any condition whatsoever).