PhotosLocation


Blue_Mountain_Faulkner_1_Geothermal_Power_Plant Latitude and Longitude:

40°59′43″N 118°08′34″W / 40.99528°N 118.14278°W / 40.99528; -118.14278
From Wikipedia, the free encyclopedia
Blue Mountain Faulkner 1 Geothermal Power Plant
CountryUnited States
Location Humboldt County, Nevada
Coordinates 40°59′43″N 118°08′34″W / 40.99528°N 118.14278°W / 40.99528; -118.14278
StatusOperational
Commission dateOctober 2009
Construction costUS$180 million
Operator(s)Nevada Geothermal Power
Geothermal power station
Type Binary cycle
Min. source temp.302 °F (150 °C)
Wells5
Max. well depth8,000 ft (2,400 m)
Power generation
Make and model Ormat Technologies
Nameplate capacity50 MW

Blue Mountain Faulkner 1 Geothermal Power Plant is a geothermal power plant located in Humboldt County, Nevada, United States. It is owned and operated by Nevada Geothermal Power Inc. [1] [2][ unreliable source?] Produced electricity is sold to NV Energy through a 21-mile (34 km) 120-kV transmission line to the transmission grid connection at Mill City, Nevada. [1]

The plant was completed in October 2009. It has an installed capacity of 50 megawatts (67,000 hp). As of November 2010, the plant operated at a net output of 37 megawatts (50,000 hp). It is a binary cycle geothermal plant, which uses a closed-loop heat exchange system. In this system hot geothermal water with an average temperature of 302 °F (150 °C) heats a secondary fluid, isobutane, which is vaporized and used to run a turbine. The geothermal water is supplied by five production wells and injected by six injection wells. There is a program to add three new production wells. [1] The depth of wells is 4,000–8,000 feet (1,200–2,400 m). [2]

The technology was supplied by Ormat Technologies. [1] [2] The well drilling contractors were ThermaSource and Ensign. The piping contractor was JFMPE and the reservoir engineering was handled by GeoThermEx Inc. The plant cost US$180 million, of which $57.9 million was funded under the American Reinvestment and Recovery Act. [1]

References

  1. ^ a b c d e Neville, Angela (2010-12-01). "Top Plant: Blue Mountain Faulkner 1 Geothermal Power Plant, Humboldt County, Nevada". Power. Retrieved 2010-12-18.
  2. ^ a b c "Blue Mountain Geothermal Power Plant Nevada, USA". power-technology.com. Net Resources International. Retrieved 2010-12-18.