Route map:
From Wikipedia, the free encyclopedia
(Redirected from Arkansas Highway 549)

Interstate 49 marker

Interstate 49

I-49 highlighted in red, AR 549 highlighted in blue
Route information
Length124.31 mi [1] (200.06 km)
Existed2014–present
NHSEntire route
Southern segment
South end I-49 at the Louisiana state line
Major intersections
North end US 71 / US 59 in Texarkana
Northern segment
South end I-40 / US 71 in Alma
Major intersections
North end I-49 at the Missouri state line
Location
Country United States
State Arkansas
Counties Miller, Sebastian, Crawford, Washington, Benton
Highway system
AR 48 US 49
I-540AR 549 I-555

Interstate 49 (I-49) is an Interstate Highway in the state of Arkansas. There are two main sections of the highway across different sides of the state. The southern section starts at the Louisiana state line, then runs to Texarkana, at the Texas state line. The northern section begins at I-40 and at U.S. Highway 71 (US 71) in Alma and runs north to the Missouri state line, where the freeway continues into Missouri. An additional small section south of Fort Smith is currently designated as Highway 549 (AR 549) until it is extended northward to the I-40 interchange, at which point it will become part of I-49.

Route description

I-49 enters the state from Louisiana between Ida and Doddridge. The first interchange in Arkansas is with US 71 at exit 4. The Interstate passes near the town of Fouke, where it has another interchange with US 71. The highway enters Texarkana and has an interchange with Highway 151 and runs along the eastern portion of the Texarkana Loop. Between US 82 and US 67, I-49 passes near the Texarkana Regional Airport. The Interstate has an interchange with I-30 before leaving Texarkana. I-49 turns to the west near the Sanderson Lane exit. The Interstate terminates at US 59/US 71. In the Texarkana area, I-49 is known as the Hickerson Freeway, named after Prissy Hickerson. [2]

The Interstate begins again at exit 12 along I-40, one mile (1.6 km) west of Alma, continuing for over 65 miles (105 km) through Crawford, Washington, and Benton counties. It goes through the Ozark Mountains and crosses several large gorge bridges. Just north of the Crawford–Washington county line is the Bobby Hopper Tunnel which is the only large highway tunnel in Arkansas. Notable cities along the route are Fayetteville, Springdale, Rogers, and Bentonville. From I-40 north to Fayetteville, I-49 runs roughly parallel to US 71. Just south of Fayetteville, I-49 combines with US 71 and US 62, forming the major expressway through the northwest Arkansas metro area. US 71 separates from I-49 just south of the Bentonville–Bella Vista city line, where it continues northwest into and through Bella Vista as Bella Vista Way, the city's main thoroughfare. I-49 instead continues westward then northward known as the Bella Vista Bypass, running just to the south and west of the city before continuing into Missouri.

History

I-49 in Northwest Arkansas

The first portion of I-49 was completed in the late 1990s and was opened to Mountainburg as AR 540.[ citation needed] On January 8, 1999, the road was fully opened to traffic and was redesignated part of an extension of I-540, with the name " John Paul Hammerschmidt Highway", in honor of a former US Representative from Arkansas. [3] Having been planned since the early 1970s,[ citation needed] it created a bypass for the older US 71. The state of Arkansas had originally asked the American Association of State Highway and Transportation Officials (AASHTO) to allow this extension, between Fort Smith and Bentonville as I-49, to emphasize plans to extend the route from Shreveport, Louisiana, through Arkansas to Kansas City, Missouri. [4] AASHTO refused, and the route instead opened in 1999 as a northern extension of I-540. [4] However, this route would eventually be redesignated as I-49 in 2014. [5] The exit numbers are still numbered from when it was I-540. From AR 72 (exit 88) to AR 16 (exit 62), the highway was upgraded to a 6-lane freeway (3 lanes in each direction). [6]

AHTD conducted a feasibility study of adding an interchange at AR 162 in Van Buren in 1991, with the results adopted by the Arkansas State Highway Commission in 1992. [4] The Arkansas State Highway Commission (ASHC) studied a designation for I-540 between Mountainburg and Fayetteville as an Arkansas Scenic Byway in a meeting on November 17, 1998.[ citation needed] One of the requirements of designation is "an active organization composed of various private and governmental groups, businesses, and agencies who are interested in preservation, enhancement, marketing, and development of the route's scenic, cultural, recreational, and historic qualities". The ASHC deemed that, since the highway was a new location route, it did not have sufficient businesses to satisfy the requirement, so the ASHC deemed itself a partner organization and proceeded with a designation study. [7] The route was added to the scenic byway system the following year. [8]

I-49 between I-30 and US 71 was finished in May 2013. The route to the Louisiana border was completed and opened on November 10, 2014. [9] The segment was originally going to be designated as I-130, but it was changed to I-49 in 2013. [10] The route to the Missouri border was completed and opened on October 1, 2021. On May 15, 2023, work began to renumber the northernmost four exits to correlate with the correct log mile designations. [11]

Arkansas Highway 549

Highway 549 marker

Highway 549

Location Fort Smith
Existed2004–present

Highway 549 (AR 549) is a temporary designation the Arkansas Department of Transportation (ArDOT) is currently using to designate opened sections of freeway that have not yet officially become part of I-49. There are three instances in which ArDOT has used this designation.

The first section of road to be designated as AR 549 is now the section of I-49 in the southern part of the state. AR 549 was first opened to traffic in December 2004 as a 29.49-mile (47.46 km) route between Texarkana and Fouke.[ citation needed] A second section, between Fouke and Doddridge, opened on October 21, 2005.[ citation needed] A third section between Arkansas Boulevard in Texarkana and US 71 north of Texarkana opened on May 15, 2013. [12] A fourth section 14 miles (23 km) long opened on November 10, 2014, when it officially became part of I-49. [9] At its final length, it was 41.94 miles (67.50 km).

The second section of road to be designated as AR 549 was the Bella Vista Bypass in the northern part of the state. The Bella Vista Bypass was first opened to traffic on April 22, 2014, as a three-mile (4.8 km) two-lane freeway bypassing Hiwasse, now part of the town of Gravette. [13] The route was eventually extended to Rocky Dell Hollow Road west of Bella Vista on May 13, 2015,[ citation needed] and I-49/US 71 in Bentonville in 2017 with ribbon cutting on May 10, 2017, which included a roundabout at the US 71 and then terminus of I-49. [14] The Bella Vista Bypass was planned to be expanded to four lanes, connect directly into I-49 at its south end, and extend north into Missouri, having an interchange with Missouri Route 90 and rejoining US 71 near Pineville, Missouri. The groundbreaking on the final section between Rocky Dell Hollow Road and the Missouri state line occurred on October 15, 2019. [15] The bypass opened to traffic on October 1, 2021, following a ceremonial ribbon cutting on September 30, per ArDOT. With that, I-49 is now continuous from Kansas City, Missouri, to Fort Smith, Arkansas. [16] [17] Additionally, as part of the project, the interchange with US 71/ U.S. Highway 71 Business (US 71B) on the southern end of the 19-mile (31 km) bypass was reconstructed from a trumpet interchange into a single-point urban interchange, the first interchange of its type in Arkansas. The interchange was temporarily reconfigured as a roundabout interchange during construction on the bypass. The roundabout that opened in 2017 was removed. [18] The existing Bella Vista Bypass was upgraded to a four-lane highway.

The third section of road to be designated as AR 549 is a 6.5-mile (10.5 km) orphaned section bypassing Fort Smith. The section, which runs between US 71 and AR 22 and AR 255, opened to traffic following a ribbon-cutting ceremony on July 14, 2015. [19] The designation is planned to be removed when I-49 is constructed from AR 22 to I-40.

Future

Eventually, I-49 will cross the entire state. It will cross into Texas for about 5 to 10 miles (8.0 to 16.1 km) and then cross over a not-yet-built bridge across the Red River into Arkansas. It will eventually reach De Queen, Arkansas, in the near future. It will then run near the western border of the state from De Queen to Fort Smith and will run parallel to US 71.

This stretch has been broken down into several smaller sections: the southernmost section from the Louisiana state line to Doddridge (already completed and opened), Doddridge to the Arkansas–Texas state line (eventually completed on November 10, 2014), the US 71 relocation (planned project, one 6.5-mile (10.5 km) part opened in 2015 as AR 549), an approximately 13.6-mile (21.9 km) stretch near Fort Smith (now in the planning stages), and part of I-540 (previously completed in 1999 and later signed as I-49 in June 2014).

The stretch near Fort Smith is funded because voters passed Issue 1, the Connecting Arkansas Program (permanent extension of 0.5-cent road tax approved in 2012). It would have lasted for ten years (until June 30, 2023). At that time, it raised $1.8 billion. The annual impact for one year: an estimated $300 million.The estimated cost of this stretch is at $787 million, including the bridge over the Arkansas River ($300–$400 million).[ citation needed]

In July 2021, ArDOT announced that they will be progressing to the next phase of development on the 13.6-mile (21.9 km) segment between AR 22 in Barling (project start point) and I-49 in Alma (project end point). This segment needs to be reevaluated because the approval was issued in December 1997 named "US 71 relocation" and has since essentially expired. [20] The I-40 to AR 22 segment was reevaluated in 2021. This likely means that the section from Fort Smith to Texarkana (approved at the same time also) will also need to be reevaluated. The segment will connect to the existing AR 549 on the northern end. The department is also cooperating with the Federal Highway Administration (FHWA) on this project.

In 2022, some studies to reduce the cost was made. The height of the planned bridge over the Arkansas River was shortened. The new roadway will open as a 4-lane meaning it can be designated as I-49. In addition, the existing roadway designated as AR 549 will be redesignated as I-49. On October 13, 2022, groundbreaking began on the proposed southern extension of Future I-49 with construction expected to occur 2024 or 2025 and should be completed by 2030. [21] [22] Phase 1 will be from AR 22 to H Street. Phase 2 will be from H Street to I-40. [23] [24] The Issue 1 approved in 2020 helped fund the project. This segment is now estimated to cost $800 million, almost half of which is going to the bridge over the Arkansas River, [25] [26] although a more recent estimate priced the bridge at $250,000 with a 2030 estimated completion date. [27] ArDOT has mentioned that, after this project, they may work on extending to I-49 southward to Y City. [20] [28] [29]

On May 25, 2023, a ARDOT announced the proposal of a new north–south route to connect AR 612 near the Northwest Arkansas National Airport to the Bella Vista bypass (I-49) near Centerton. [30]

Exit list

StateCountyLocation mi [31] kmOld exit [11]New exit [a]DestinationsNotes
Arkansas Miller0.000.00
I-49 south – Shreveport
Continuation into Louisiana
4.276.874 US 71 – Doddridge
7.1511.516 CR 197
16.7326.9216 US 71 – Fouke
18.3429.5218North Fouke Road
23.9338.5124 CR 10 – Ferguson
26.5842.7826 AR 237
Texarkana28.87–
29.72
46.46–
47.83
29A US 71 – TexarkanaSigned as exit 29 southbound
29B
To US 59 – Dallas, Houston
Access via AR 151 and TX Loop 151; exit number not signed southbound
31.1950.2031 AR 196 (Genoa Road)
32.42–
33.12
52.17–
53.30
32 US 82 (9th Street) / 19th Street
33.6654.17 US 67 – TexarkanaClosed
34.5955.6735Four States Fair Parkway / Arkansas BoulevardFormer AR 245 north; access to Texarkana Regional Airport
36.6458.9737 I-30 – Texarkana, Dallas, Hope, Little RockSigned as exits 37A (east) and 37B (west); I-30 exit 3
39.9564.2941Sanderson Lane
ArkansasTexas line41.4966.7742 US 71 – Texarkana, Ashdown, Fort SmithTemporary northern end of I-49; exit number not signed; all northbound traffic must exit
Gap in route
Arkansas Sebastian0.000.001187 US 71 – Fort Smith, TexarkanaOpened on July 14, 2015, as AR 549; [19] temporary southern end of AR 549; all southbound traffic must exit; future exit 187; future temporary southern endpoint of I-49 current exit 187
Module:Jctint/USA warning: Unused argument(s): state
Fort Smith3.044.894190Massard RoadOpened on July 14, 2015, as AR 549; [19] future exit 190; current exit 190
4.477.195191Roberts BoulevardOpened on July 14, 2015, as AR 549; [19] future exit 191; current exit 191
Barling6.4910.447193 AR 22 (Fort Street) – BarlingOpened on July 14, 2015, as AR 549; [19] temporary northern end of AR 549; future exit 193; all northbound traffic must exit; current exit 193
Arkansas RiverBridge
Crawford9195
To AR 59 / Gun Club Road – Van Buren
to be open by 2030
Kibler17203
To AR 162 / Clear Creek Road – Kibler
to be open by 2030
205.23330.2920206 I-40 ( US 71) – Van Buren, Fort Smith, Alma, Little RockI-40 exit 12; signed as future exits 206A (east) and 206B (west), temporary southern end of I-49; from here northward, exit signs retain the same exit numbers from I-49's previous designation as I-540
Alma206.31332.02207Collum Laneexit re-numbered in the future
209.67337.43210 AR 282 – Rudyexit renumbered in the future
215.10346.17215 AR 282 – MountainburgAccess via AR 282S exit re-numbered in the future
219.53353.30220 AR 282 – Chesterexit renumbered in the future
Washington227.14–
227.44
365.55–
366.03
Bobby Hopper Tunnel
Winslow230.99371.74231 AR 74 – Winslow
West Fork239.78385.89239 AR 170 / AR 156 – West Fork
Greenland243.88392.49244 Greenland
Fayetteville246.50396.70246 AR 265 (Razorback Road) / AR 112 (Cato Springs Road)
247.98399.09247
US 71 south – Fayetteville
Southern end of US 71 concurrency; southbound exit and northbound entrance
247.98399.09247

To US 62 west (West 15th Street) – Fayetteville [37]
Proposed; northbound exit and southbound entrance only
247.98399.09248

US 62 west / AR 16 east (Martin Luther King Jr. Boulevard / AR 16 east) / AR 180 / AR 45
Southern end of US 62 / AR 16 concurrency; to be southbound exit and northbound entrance only
249.79402.00250

AR 16 west / AR 112S east ( Wedington Drive)
Northern end of AR 16 concurrency
250.74403.53251Stephen Carr Memorial BoulevardPorter Road rededicated in July 2022; [38]
252.96407.10253A AR 112 (Garland Avenue)Access to the University of Arkansas
252.43406.25253B
US 71B north / North Fulbright Expressway
Interchange opened around November 2017; access to Washington Regional Medical Center and Fayetteville Historic District
Johnson255.88411.80255Johnson Mill Boulevard
Springdale255.97411.94256Don Tyson ParkwayOpened July 7, 2014; [39]
257.45414.33258 US 412 (Sunset Avenue)
258.86416.59259Elm Springs Road
Benton76.15122.55262Wagon Wheel Road
Lowell77.55124.80263 AR 612 (Springdale Northern Bypass) – Elm Springs, Cave SpringsFirst section opened on April 30, 2018
78.90126.98264 AR 264 (West Monroe Avenue)Access to Northwest Arkansas Regional Airport
Rogers81.01130.37267Pleasant Grove Road
82.79133.24268Promenade Boulevard / West Pauline Whittaker Parkway
83.90135.02269Pinnacle Hills Parkway / West New Hope Road
RogersBentonville line85.30137.28271
AR 12 west

US 71B south (W. Walnut Street)
Southern end of AR 12 concurrency
Bentonville86.80139.69272


US 62 east / AR 12 east (Hudson Road) / AR 102 west (SE 14th Street)
Northern end of US 62 / AR 12 concurrency
87.29140.482738th Street
88.81142.9388A-B274A-B
AR 72 east (E. Central Avenue)
Last exit of I-49's previous designation of I-540; split into exits 274A (east) and 274B (west) northbound
92.49148.8591277
US 71 north
Northern end of US 71 concurrency; former northern end of I-49 until October 1, 2021; former southern end of AR 549; Single-point urban interchange; [40] exit renumbered on May 15, 2023; [41] [42]
HiwasseCenterton line98.28158.1797283

AR 72 east (Centerton) / AR 72 west (Hiwasse)
Exit renumbered in the future ; [41] [42]
HiwasseGravette line101.23162.91100286

AR 72 east (Hiwasse) / AR 72 west (Gravette)
Exit renumbered in the future ; [41] [42]
Bella Vista103.63166.78102288 CR 34 (Rocky Dell Hollow Road)Former northern end of AR 549; exit renumbered in the future ; [41] [42]

I-49 north – Joplin
Continuation into Missouri
1.000 mi = 1.609 km; 1.000 km = 0.621 mi

See also

Notes

  1. ^ Exit numbers on the section of I-49 from I-40 to the Missouri border is based on the former I-540 exit numbering; others are based on the mileage from the Louisiana state line. [32] [33] [34] [35] [36]

References

  1. ^ Starks, Edward (January 27, 2022). "Table 1: Main Routes of the Dwight D. Eisenhower National System of Interstate and Defense Highways". FHWA Route Log and Finder List. Federal Highway Administration. Retrieved December 24, 2023.
  2. ^ "Loop 245 Named For Prissy Hickerson". KTBS-TV. July 23, 2007. Retrieved May 28, 2017.
  3. ^ Gerhardt, Kara (January 8, 1999). "Secretary Slater Joins in Dedication of Final Segment of Arkansas' I-540" (Press release). United States Department of Transportation. Retrieved May 2, 2009 – via The Crittenden Automotive Library.
  4. ^ a b c Arkansas State Highway Commission (January 22, 1991). "Minutes of the Meeting" (PDF). Little Rock: Arkansas State Highway Commission. pp. 199, 868. Archived from the original (PDF) on December 25, 2013. Retrieved December 24, 2013.
  5. ^ Wood, Ron (April 23, 2014). "First Section of Bella Vista Bypass Opened: New I-49 Signs Going Up on Old I-540". Northwest Arkansas Democrat-Gazette. Retrieved October 6, 2021.
  6. ^ Souza, Kim (June 15, 2020). "I-49 widening to six lanes should be complete by late summer". Talk Business & Politics. Retrieved June 4, 2022.
  7. ^ Arkansas State Highway Commission (November 17, 1998). "Minutes of the Meeting" (PDF). Little Rock: Arkansas State Highway Commission. p. 1205. Archived from the original (PDF) on December 25, 2013. Retrieved December 24, 2013.
  8. ^ Arkansas State Highway Commission (November 17, 1999). "Minutes of the Meeting" (PDF). Little Rock: Arkansas State Highway Commission. p. 1411. Archived from the original (PDF) on December 25, 2013. Retrieved December 24, 2013.
  9. ^ a b Vitrano, Amy (November 10, 2014). "New section of I-49 opens, connects Shreveport to Texarkana". KTBS-TV. KTBS-TV. Retrieved December 17, 2019.
  10. ^ Arkansas State Highway and Transportation Department. "AHTD List of ARRA projects" (PDF). Arkansas State Highway and Transportation Department. (Though both are labeled "Hwy. 71" here, as described #030325 is AR 245/future I-130 & I-49, while #030354 is AR 549/future I-49.)
  11. ^ a b Bailey, Spencer (May 12, 2023). "ARDOT announces exit numbers changing on I-49". Rogers, Arkansas: KNWA-TV. Retrieved May 15, 2023.
  12. ^ "Arkansas Highway 549 To Open To Traffic Wednesday". www.ualrpublicradio.org. Associated Press. May 14, 2013. Retrieved May 7, 2021.
  13. ^ "First Section of Bella Vista Bypass Now Open". Arkansas Matters. Little Rock, Arkansas: KARK-TV. April 22, 2014. Archived from the original on December 7, 2017. Retrieved May 14, 2014.
  14. ^ "New Portion Of I-49 Bypass Complete In Bella Vista". 5newsonline.com. May 10, 2017. Retrieved April 8, 2022.
  15. ^ McClintock, Kevin (October 15, 2019). "Final phase of Bella Vista Bypass under construction". Joplin Globe. Retrieved October 2, 2021.
  16. ^ Barker, Kimberly (March 30, 2021). "Missouri's section of Bella Vista Bypass scheduled for completion in fall". Joplin Globe. Retrieved June 22, 2021.
  17. ^ Gill, Todd (October 1, 2021). "I-49 Bella Vista bypass now complete". Fayetteville Flyer. Retrieved October 1, 2021.
  18. ^ Wood, Ron (September 30, 2021). "Decades-long Bella Vista Bypass project opens today". Arkansas Democrat Gazette. Retrieved October 2, 2021.
  19. ^ a b c d e Marney, Meridith (July 14, 2015). "Leaders Dedicate Highway 549 At Chaffee Crossing". KFSM-TV. KFSM-TV. Retrieved December 17, 2019.
  20. ^ a b Suhr, Robert (July 23, 2021). "Plans For I-49 extension in River Valley move ahead". 4029 News. KHBS-TV. Retrieved August 13, 2021.
  21. ^ Dale, Tina Alvey (October 13, 2022). "Officials break ground on the next section of I-49". Talk Business & Politics. Retrieved October 15, 2022.
  22. ^ Claybrook, Emma (October 14, 2022). "ARDOT broke ground on I-49 expansion in Barling". 4029 News. KHBS-TV. Retrieved October 15, 2022.
  23. ^ Gladden, Alex (March 18, 2022). "Some opposition heard on plans for Interstate 49". Southwest Times Record. Retrieved March 25, 2022.
  24. ^ Wood, Ron (January 12, 2022). "Site work expected to begin on I-49 extension to Barling in the Fall". Arkansas Democrat-Gazette. Retrieved February 11, 2022.
  25. ^ Smith, Jacob (October 10, 2022). "Future Interstate 49 to break ground in Barling". KNWA FOX24. Retrieved May 5, 2023.
  26. ^ Williams, Rachel (October 14, 2022). "Arkansas officials break ground on I-49 expansion in Barling". 5newsonline.com. Retrieved May 5, 2023.
  27. ^ Brich, Monica (August 16, 2023). "Womack talks impact of Fort Smith's Peak Innovation Center, Interstate 49 expansion in the River Valley". Arkansas Online. Retrieved August 17, 2023.
  28. ^ "ARDOT announces next phase of River Valley I-49 extension underway". KNWA FOX24. July 20, 2021. Retrieved October 2, 2021.
  29. ^ Bell, Andrew (August 6, 2022). "On the road to completion: First step to I-49 connection between Fort Smith, Texarkana to begin in 2024". Texarkana Gazette. Retrieved May 6, 2023.
  30. ^ Rosa, Jeff Della (May 25, 2023). "ArDOT to release findings on proposed $250M highway west of I-49". Talk Business & Politics. Retrieved May 26, 2023.
  31. ^ Route and Section Maps (Map). Little Rock: Arkansas Department of Transportation. December 30, 2019. Retrieved May 27, 2021.
  32. ^ Arkansas Highway and Transportation Department Planning and Research Division (2014). State Highway Map (Map) (2014–15 ed.). Little Rock: Arkansas Highway and Transportation Department. §§ A2–D2, H2–J2.
  33. ^ Arkansas Highway and Transportation Department. Map of Proposed I-49 (Map). Little Rock: Arkansas Highway and Transportation Department. Sheets  1, 2, and 3 (PDF). {{ cite map}}: External link in |sheets= ( help) Retrieved January 23, 2015.
  34. ^ "Re: I-49 in Arkansas". AARoads Forum. January 25, 2022. Retrieved February 20, 2022.[ unreliable source?]
  35. ^ Trace, Michael (January 25, 2022). I 49 BVB Northbound. Retrieved February 20, 2022 – via YouTube.
  36. ^ Trace, Michael (January 25, 2022). I 49 BVB Southbound. Retrieved February 20, 2022 – via YouTube.
  37. ^ "In-person Public Comment Meeting Regarding Proposed Improvements to I-49/Hwy. 62 Interchange". Arkansas Department of Transportation. Retrieved October 9, 2022.
  38. ^ Staff (July 21, 2022). "Stephen Carr Memorial Boulevard signs installed on Interstate 49". 5newsonline.com. KFSM-TV. Retrieved July 22, 2022.
  39. ^ Caraway, Steve (July 3, 2014). "Springdale's Tyson Interchange to Open Month Early: Work Will Create Easy Access to Ballpark Development Area". Northwest Arkansas Democrat-Gazette. Retrieved July 3, 2014.
  40. ^ Gilker, Kathryn (May 10, 2017). "New Portion Of I-49 Bypass Complete In Bella Vista". 5 News Online. Fort Smith, Arkansas: KFSM-TV. Retrieved May 10, 2017.
  41. ^ a b c d Roberts, Adam (May 14, 2023). "Four I-49 exit numbers to change in Benton County". KHBS. Retrieved May 17, 2023.
  42. ^ a b c d Wood, Ron (May 16, 2023). "Exit numbers changing on Interstate 49 in Bella Vista". Arkansas Online. Retrieved May 17, 2023.

External links

KML is from Wikidata


Interstate 49
Previous state:
Louisiana
Arkansas Next state:
Texas
Previous state:
Texas
Next state:
Missouri