PhotosLocation


Adamów_Coal_Mine Latitude and Longitude:

52°01′09″N 18°37′59″E / 52.0191°N 18.6331°E / 52.0191; 18.6331
From Wikipedia, the free encyclopedia
Adamów coal mine
Adamów power plant
Location
Adamów coal mine is located in Poland
Adamów coal mine
Adamów coal mine
Location Turek
Voivodeship Greater Poland Voivodeship
Country Poland
Coordinates 52°01′09″N 18°37′59″E / 52.0191°N 18.6331°E / 52.0191; 18.6331
Production
Products lignite
Production1,600,000
History
Opened1979
Closed2021
Owner
CompanyKopalnia Węgla Brunatnego Adamów
Company
Company type Public company

The Adamów brown coal mine ( Polish: Kopalnia Węgla Brunatnego „Adamów”) was a large open-pit mine in Turek, Greater Poland Voivodeship, central Poland, 208 km west of the capital, Warsaw. At the time of its commissioning Adamów held one of the largest lignite reserves in Poland, estimated to be 90 million tonnes of coal. [1] The annual coal production was around 1.6 million tonnes.

In August 2020 the management announced that the mine will be closed by the end of the year. [2] Because there was still some coal left, the management decided to continue operations and the last excavator was permanently turned off at 4:50 pm on 17 February 2021. There are plans to install a photovoltaic array on the site. [3]

References

  1. ^ "References" (PDF). poltegor.pl. 2010. Archived from the original (PDF) on 2012-03-13. Retrieved 2010-09-28.
  2. ^ "Koniec kopalni węgla brunatnego Adamów. Zamiast wydobycia, odnawialne źródła energii - Polsat News". polsatnews.pl (in Polish). 2020-08-04. Retrieved 2024-02-14.
  3. ^ "Na odkrywce Adamów wydobyto ostatnią tonę węgla. Kopalnia zakończyła definitywnie działalność" [Last tonne of coal from Adamów pit. Mine definitely closed.]. Turek.net.pl (in Polish). 19 February 2021.

External links