Wirye Line | |
---|---|
Overview | |
Native name | 서울 경전철 위례선 (慰禮線) |
Status | Approved |
Termini | |
Stations | 12 |
History | |
Planned opening | September 2025 |
Technical | |
Line length | 5.44 km (3.38 mi) |
The Wirye Line ( Korean: 위례선; Hanja: 慰禮線) is a future tram line in Seoul, South Korea serving Wirye New Town. Construction is planned to begin on 5 December 2022 and the line is scheduled to be opened in September 2025, with a projected cost of ₩261.4 billion (US$194.4 million). It will be the first tram line to run in Seoul since the closure of the city's tram system in 1968. [1] [2]
The names of the stations are not yet final.
Station Number |
Station Name English |
Station Name Hangul |
Station Name Hanja |
Transfer | Distance in km |
Total Distance |
Location | ||
W01
|
Macheon | 마천 | 馬 川 | ||||||
W02
|
Singeoyeo | 신거여 | 新 巨 余 | ||||||
W03
|
Geoyeosageori | 거여사거리 | 巨 余 四거리 | ||||||
W04
|
Geowon | 거원 | 巨 元 | ||||||
W05
|
Sinjangji | 신장지 | 新 長 旨 | ||||||
W06
|
Songnye | 송례 | 松 禮 | ||||||
W07
|
Wirye Jungang | 위례중앙 | 慰 禮 中 央 | Wirye–Sinsa Line | |||||
W08
|
Changgok | 창곡 | 倉 谷 | Branch line | |||||
W11
|
Changgokcheon | 창곡천 | 倉 谷 川 | ||||||
W12
|
Bokjeong | 복정 | 福 井 |
Station Number |
Station Name English |
Station Name Hangul |
Station Name Hanja |
Transfer | Distance in km |
Total Distance |
Location | ||
W08
|
Changgok | 창곡 | 倉 谷 | Main line | |||||
W09
|
Sinchanggok | 신창곡 | 新 倉 谷 | ||||||
W10
|
Namwirye | 남위례 | 南 慰 禮 |