Four offshore wind farms are in the Thames Estuary area: Kentish Flats, Gunfleet Sands, Thanet and London Array. The latter was largest in the world.
Offshore wind farm locations

This article lists the largest offshore wind farms that are currently operational rated by nameplate capacity. It also lists the largest offshore wind farms currently under construction, the largest proposed offshore wind farms, and offshore wind farms with notability other than size.

As of 2022, Hornsea 2 in the United Kingdom is the largest offshore wind farm in the world at 1,386 MW. [1]

Largest operational offshore wind farms

This is a list of offshore wind farms with at least 400 MW nameplate capacity that are currently operational.

Wind farm Location Coordinates Capacity
( MW)
Turbines
number
Turbines
model
Commissioning
date
Refs
Hornsea Project Two United Kingdom 53°54′36.0″N 1°33′6.5″E / 53.910000°N 1.551806°E / 53.910000; 1.551806 (Hornsea Project Two (1368 MW)) 1,386 165 Siemens Gamesa 8.0-167 DD 2022 [2] [3]
Hornsea Project One United Kingdom 53°53′6″N 1°47′28″E / 53.88500°N 1.79111°E / 53.88500; 1.79111 (Hornsea Project One (1218 MW)) 1,218 174 Siemens Gamesa SWT-7.0-154 2019 [4] [5]
Seagreen United Kingdom 56°35′17″N 1°44′28″W / 56.58806°N 1.74111°W / 56.58806; -1.74111 (Seagreen (1075 MW)) 1,075 114 MHI Vestas V164-10 MW 2023 [6]
Moray East United Kingdom 58°10′1.49″N 2°41′54.67″W / 58.1670806°N 2.6985194°W / 58.1670806; -2.6985194 (Moray East (950 MW)) 950 100 MHI Vestas V164-9.5 MW 2022 [7]
Triton Knoll United Kingdom 53°24′N 0°54′E / 53.400°N 0.900°E / 53.400; 0.900 (Triton Knoll (857 MW)) 857 90 MHI Vestas V164-9.5 MW 2021 [8] [9]
Hollandse Kust Noord Netherlands 52°42′54.4″N 4°15′3.6″E / 52.715111°N 4.251000°E / 52.715111; 4.251000 (Hollandse Kust Noord (759 MW)) 759 69 Siemens Gamesa 11.0-200 DD 2023 [10]
Borssele I & II Netherlands 51°42′10″N 3°4′34″E / 51.70278°N 3.07611°E / 51.70278; 3.07611 (Borssele I & II (752 MW)) 752 94 Siemens Gamesa 8MW 2020 [11] [12]
Borssele III & IV Netherlands 51°42′25.2″N 2°54′44.6″E / 51.707000°N 2.912389°E / 51.707000; 2.912389 (Borssele III & IV (731.5 MW)) 731.5 77 MHI Vestas V164-9.5 MW 2021 [13] [14]
East Anglia ONE United Kingdom 52°39′57″N 2°17′44″E / 52.66583°N 2.29556°E / 52.66583; 2.29556 (East Anglia ONE (714 MW)) 714 102 Siemens Gamesa SWT-7.0-154 2020 [15] [16]
Walney Extension United Kingdom 54°2′38.4″N 3°31′19.2″W / 54.044000°N 3.522000°W / 54.044000; -3.522000 (Walney Extension (659 MW)) 659 40+47 MHI- Vestas 8.25 MW
Siemens Gamesa SWT-7.0-154
2018 [17]
London Array United Kingdom 51°38′38″N 01°33′13″E / 51.64389°N 1.55361°E / 51.64389; 1.55361 (London Array (630 MW)) 630 175 Siemens Gamesa SWT-3.6-120 2013 [18] [19] [20]
Kriegers Flak Denmark 55°3′46″N 13°0′17″E / 55.06278°N 13.00472°E / 55.06278; 13.00472 (Kriegers Flak (605 MW)) 605 72 Siemens Gamesa SWT-8.4-167 2021 [21] [22]
Gemini Wind Farm Netherlands 54°2′9.6″N 5°57′46.8″E / 54.036000°N 5.963000°E / 54.036000; 5.963000 (Gemini Wind Farm (600 MW)) 600 150 Siemens Gamesa SWT-4.0 2017 [23] [24] [25] [26]
Beatrice United Kingdom 58°7′48″N 3°4′12″W / 58.13000°N 3.07000°W / 58.13000; -3.07000 (Beatrice Wind Farm (588 MW)) 588 84 Siemens Gamesa SWT-7.0-154 2019 [27]
Gode Wind (phases 1+2) Germany 54°3′0″N 7°1′48″E / 54.05000°N 7.03000°E / 54.05000; 7.03000 (Gode Wind I+II (582 MW)) 582 97 Siemens Gamesa SWT-6.0-154 2017 [28] [29]
Gwynt y Môr United Kingdom 53°27′N 3°35′W / 53.450°N 3.583°W / 53.450; -3.583 (Gwynt y Môr (576 MW)) 576 160 Siemens Gamesa SWT-3.6-107 2015 [30]
Race Bank United Kingdom 53°16′30″N 0°50′0″E / 53.27500°N 0.83333°E / 53.27500; 0.83333 (Race Bank (573 MW)) 573 91 Siemens Gamesa SWT-6.0-154 2018 [31] [32]
Greater Gabbard United Kingdom 51°52′48″N 1°56′24″E / 51.88000°N 1.94000°E / 51.88000; 1.94000 (Greater Gabbard wind farm (504 MW)) 504 140 Siemens Gamesa SWT-3.6-107 2012 [33] [34] [35]
Jiangsu Qidong H1+H2 China 32°7′12″N 122°9′36″E / 32.12000°N 122.16000°E / 32.12000; 122.16000 (Jiangsu Qidong H1+H2 (503 MW)) 503 84 Shanghai Electric 2021 [36] [37]
CGN Shanwei Jiazi I China 22°36′05″N 116°05′07″E / 22.6015°N 116.0854°E / 22.6015; 116.0854 (CGN Shanwei Jiazi I (503 MW)) 503 78 MySE6.45-180 2022 [38]
Jieyang Shenquan II China 22°40′02″N 116°18′58″E / 22.6673°N 116.3162°E / 22.6673; 116.3162 (Jieyang Shenquan II (502 MW)) 502 34+16 Shanghai Electric 2022 [39]
Shandong Bozhong B2 China 38°16′26″N 118°55′21″E / 38.2739°N 118.9225°E / 38.2739; 118.9225 (Shandong Bozhong B2 (501.5 MW)) 501.5 59 2023 [40]
Shandong Bozhong A China 38°18′01″N 118°32′26″E / 38.3003°N 118.5405°E / 38.3003; 118.5405 (Shandong Bozhong A (501 MW)) 501 60 CSIC Haizhuang H220-8.35 2022 [41]
Huadian Yangjiang Qingzhou III China 20°58′12″N 111°36′29″E / 20.9699°N 111.6080°E / 20.9699; 111.6080 (Huadian Yangjiang Qingzhou III (500.6 MW)) 500.6 37+30 MySE6.8-158
MySE8.3-180
2022 [42]
CGN Shanwei Houhu China 22°42′55″N 116°03′30″E / 22.7152°N 116.0582°E / 22.7152; 116.0582 (CGN Shanwei Houhu (500.5 MW)) 500.5 91 MingYang MySE5.5-155 2021 [43]
Hohe See Germany 54°26′N 6°19′E / 54.433°N 6.317°E / 54.433; 6.317 (Hohe See (497 MW)) 497 71 Siemens Gamesa SWT-7.0-154 2019 [44]
Saint-Brieuc France 48°51′36″N 2°32′6″W / 48.86000°N 2.53500°W / 48.86000; -2.53500 (Saint-Brieuc Wind Farm (496 MW)) 496 62 Siemens Gamesa SG 8.0-167 DD 2023 [45] [46] [47]
Saint-Nazaire [ fr] France 47°9′38″N 2°37′36″W / 47.16056°N 2.62667°W / 47.16056; -2.62667 (Saint-Nazaire Wind Farm (480 MW)) 480 80 GE Haliade 150-6MW 2022 [48]
Borkum Riffgrund 2 Germany 53°56′49″N 6°29′7″E / 53.94694°N 6.48528°E / 53.94694; 6.48528 (Borkum Riffgrund 2 (450 MW)) 450 56 MHI Vestas V164-8.0 MW 2019 [49]
Horns Rev 3 Denmark 55°41′49″N 7°40′9″E / 55.69694°N 7.66917°E / 55.69694; 7.66917 (Horns Rev 3 (407 MW)) 407 49 MHI Vestas V164-8.3 MW 2019 [50]
CGN Shanwei Jiazi II China 22°37′15″N 116°09′48″E / 22.6209°N 116.1632°E / 22.6209; 116.1632 (CGN Shanwei Jiazi II (403 MW)) 403 62 MySE6.45-180 2022 [38] [51]
Dudgeon United Kingdom 53°14′56.4″N 1°23′24.0″E / 53.249000°N 1.390000°E / 53.249000; 1.390000 (Dudgeon Offshore Wind Farm (402 MW)) 402 67 Siemens Gamesa SWT-6.0-154 2017 [52]
Veja Mate Germany 54°40′N 6°10′E / 54.667°N 6.167°E / 54.667; 6.167 (Veja Mate Wind Farm (402 MW)) 402 67 Siemens Gamesa SWT-6.0-154 2017 [53] [54]
CGN Yangjiang Nanpeng Island China 21°28′13″N 112°15′16″E / 21.4702°N 112.2545°E / 21.4702; 112.2545 (CGN Yangjiang Nanpeng Island (401.5 MW)) 401.5 73 Mingyang MY-5.5 MW 2020 [55] [56]
Anholt Denmark 56°36′0″N 11°12′36″E / 56.60000°N 11.21000°E / 56.60000; 11.21000 (Anholt Offshore Wind Farm (400 MW)) 400 111 Siemens Gamesa SWT-3.6-120 2013 [57] [58] [59] [60]
BARD Offshore 1 Germany 54°21′30″N 5°58′30″E / 54.35833°N 5.97500°E / 54.35833; 5.97500 (BARD Offshore 1 (400 MW)) 400 80 BARD 5.0MW 2013 [61] [62] [63]
Global Tech I [ de] Germany 54°30′0″N 6°21′30″E / 54.50000°N 6.35833°E / 54.50000; 6.35833 (Global Tech I (400 MW)) 400 80 Areva Multibrid M5000 5.0MW 2015 [64]
Rampion United Kingdom 50°39′53″N 0°16′44″W / 50.66472°N 0.27889°W / 50.66472; -0.27889 (Rampion (400 MW)) 400 116 MHI Vestas V112-3.45 MW 2018 [65]
Binhai North H2 China 34°30′00″N 120°20′00″E / 34.50000°N 120.33333°E / 34.50000; 120.33333 (Binhai North Wind) 400 100 Siemens Gamesa SWT-4.0-120 2018 [66]
CTGNE Yangjiang Shapa - phase II China 21°19′05″N 111°29′18″E / 21.3180°N 111.4882°E / 21.3180; 111.4882 (CTGNE Yangjiang Shapa - phase II (400 MW)) 400 62 Mingyang MySE6.45-180 2021 [67] [68]
Rudong H6 China 400 100 Siemens Gamesa SWT-4.0-146 2021 [69] [67]
Rudong H10 China 400 100 Siemens Gamesa SWT-4.0-146 2021 [70] [67]
SPIC Rudong H7 China 400 100 Siemens Gamesa SWT-4.0-146 2021 [71]
SPIC Rudong H4 China 400 100 Siemens Gamesa SWT-4.0-146 2021 [72]

Largest under construction

This is a list of wind farms with a nameplate capacity of more than 400 MW currently under construction.

Wind farm Location Coordinates Capacity
( MW)
Turbines & model Completion Ownership Refs
Sofia United Kingdom 54°58′45.8″N 2°13′48.4″E / 54.979389°N 2.230111°E / 54.979389; 2.230111 (Sofia (1400 MW)) 1,400 100 × Siemens Gamesa 14MW 2026 RWE [73]
Dogger Bank A United Kingdom 54°44′56.0″N 1°55′48.4″E / 54.748889°N 1.930111°E / 54.748889; 1.930111 (Dogger Bank A (1200 MW)) 1,200 95 × GE Haliade-X 13MW 2023 SSE (40%), Equinor (40%), Vårgrønn (20%) [74]
Dogger Bank B United Kingdom 54°59′11.8″N 1°39′43.9″E / 54.986611°N 1.662194°E / 54.986611; 1.662194 (Dogger Bank B (1200 MW)) 1,200 95 × GE Haliade-X 13MW 2024 SSE (40%), Equinor (40%), Vårgrønn (20%) [74]
Borkum Riffgrund 3 Germany 54°2′35″N 6°11′46″E / 54.04306°N 6.19611°E / 54.04306; 6.19611 (Borkum Riffgrund 3 (913 MW)) 913 83 × Siemens Gamesa 11.0-200 DD 2025 Ørsted [75]
Greater Changhua (1 & 2A) Taiwan 24°09′21″N 119°52′10″E / 24.1558°N 119.8694°E / 24.1558; 119.8694 (Greater Changhua 1 & 2A (900 MW)) 900 111 × Siemens Gamesa 8.0-167 DD 2022 [76]
Moray West United Kingdom 58°5′38″N 2°59′17″W / 58.09389°N 2.98806°W / 58.09389; -2.98806 (Moray West (882 MW)) 882 60 × Siemens Gamesa 14-222 DD 2025 [77]
Vineyard Wind United States 41°02′00″N 70°37′00″W / 41.03325°N 70.61667°W / 41.03325; -70.61667 (Vineyard Wind (800 MW)) 800 62 x 13.6MW GE Haliade-X 2024 CIP(50%), Avangrid (50%) [78] [79] [80] [81]
Hollandse Kust (Zuid) III & IV Netherlands 52°22′0.001″N 4°7′0.001″E / 52.36666694°N 4.11666694°E / 52.36666694; 4.11666694 (Hollandse Kust (Zuid) III & IV (770 MW)) 770 70 × Siemens Gamesa 11.0-200 DD 2023 Vattenfall (50.5%), BASF(24.3%) and Allianz(25.2%) [82]
Hollandse Kust (Zuid) I & II Netherlands 52°22′0.001″N 4°7′0.001″E / 52.36666694°N 4.11666694°E / 52.36666694; 4.11666694 (Hollandse Kust (Zuid) I & II (770 MW)) 759 69 × Siemens Gamesa 11.0-200 DD 2023 Vattenfall (50.5%), BASF(24.3%) and Allianz(25.2%) [83]
Yunlin Taiwan 23°35′09″N 120°01′48″E / 23.5859°N 120.0300°E / 23.5859; 120.0300 (Yunlin (640 MW)) 640 80 × Siemens Gamesa 8.0-167 DD 2023 [84] [85]
Changfang Taiwan 24°00′11″N 120°08′20″E / 24.0030°N 120.1388°E / 24.0030; 120.1388 (Changfang 1 & 2 (541.5 MW)) 589 62 × MHI Vestas V174-9.5 MW 2023 [86] [87] [88]
Guodian Xiangshan 1 phase 2 China 500 41 x 12MW units 2025 [38] [89]
Fécamp France 49°54′15.1″N 0°13′13.1″E / 49.904194°N 0.220306°E / 49.904194; 0.220306 (Fécamp Wind Farm (497 MW)) 497 71 × Siemens Gamesa SWT-7.0-154 2023 EDF (82.1%), Enbridge (17.9%) [90]
Baltic Eagle Germany 54°49′29.3″N 13°51′42.1″E / 54.824806°N 13.861694°E / 54.824806; 13.861694 (Baltic Eagle (476 MW)) 476 50 × MHI Vestas V174-9.5 MW 2024 Iberdrola [91]
Calvados France 49°27′22″N 0°29′53″W / 49.45611°N 0.49806°W / 49.45611; -0.49806 (Calvados Wind Farm (448 MW)) 448 64 × Siemens Gamesa SWT-7.0-154 2024 EDF (88.3%), Enbridge (21.7%) [92]
Neart na Gaoithe United Kingdom 56°16′4″N 2°19′15″W / 56.26778°N 2.32083°W / 56.26778; -2.32083 (Neart na Gaoithe (448 MW)) 450 54 × Siemens Gamesa 8.0-167 DD 2023 EDF, ESB [93] [94]

Largest proposed

The following table lists largest offshore wind farm areas (by nameplate capacity) that are only at a proposal stage, and have achieved at least some of the formal consents required before construction can begin.

Wind farm Location Coordinates Capacity
( MW)
Projected completion Consents Refs
Chaozhou China 43,300 Projected to start work before 2025 [95]
Sinan Korea Offshore South Korea 8,200 2030 Project approved in 2021. Estimated cost: €36 billion. [96] [97] [98]
Berwick Bank United Kingdom 4,100 2027 SSE merged Berwick Bank (2.3GW) and Marr Bank (1.85GW) into single project. [99] Planning application will be sent to Scottish government in Spring 2022. If accepted, project will be shovel ready by 2024 and will be generating electricity by 2027 [100] [101] [102] [103] [104] [105]
East Anglia Hub

(formerly Norfolk Bank)

United Kingdom 3,100 2026 ScottishPower Renewables merged East Anglia TWO (900 MW), East Anglia THREE (1,400 MW) and East Anglia ONE North (800MW) into single hub.

Anticipated project start in 2022. Project completion anticipated in 2026.

[106] [107]
Med Wind Italy 2,800 2030

Floating offshore wind farm. Scoping procedure completed in 2021. Construction to start in 2025. Expected project completion in 2030.

[108] [109]
Coastal Virginia Offshore Wind United States 36°53′16″N 75°29′50″W / 36.8878333°N 75.4973333°W / 36.8878333; -75.4973333 2,640 Phase 1 (880 MW), Phase 2 (880 MW), Phase 3 (880 MW) [110] [111] [112] [113] [114]
Hornsea Project Four United Kingdom 2,600 [115]
Southwest Offshore South Korea 2,500 Phase 1 (60 MW), Phase 2 (400 MW), Phase 3 (2000 MW) [116] [117] [118] [119]
Hornsea Project Three United Kingdom 2,400 Crown Estate Round 3 [120]
Mayflower Wind United States 2,400 in two phases TBA BOEM
Wilmington East & Wilmington West Wind Farm United States 2,250 TotalEnergy Renewables USA [121] [122]
Formosa III Taiwan 2,000 Undergoing environmental impact assessment and approvals which are expected to be completed between 2021 and 2025. [123]
IJmuiden Ver Alpha Netherlands 2,000 2029 [124]
IJmuiden Ver Beta Netherlands 2,000 2029 [124]
IJmuiden Ver Gamma Netherlands 2,000 [124]
Norfolk Vanguard United Kingdom 1,800 Planning Consent Granted on 11 February 2022. Offshore works expected to begin in 2025 [125] [126] [127] [128] [129]
Norfolk Boreas United Kingdom 1,800 Planning Consent Granted on 10 December 2021. Offshore works are expected to begin in 2025. [130] [131] [132] [128] Project shelved in July 2023. [133]
OWF Bałtyk I Poland 1,560 Connection to national grid approved in 2021 [134] [135] [136]
Atlantic Shores United States 1,510 2028 NJBPU [137] [138]
Dogger Bank C

(formerly Teesside A)

United Kingdom 1,200 Offshore export cable installation will commence in Q1 2024; Offshore platform installation will commence in Q2, 2024; foundation installation will commence in Q3, 2024; Turbine installation will commence in Q2, 2025. First power is anticipated in Q3, 2025 and full power in Q1, 2026. [74]
Rampion 2 United Kingdom 1,200 Concept/Early Planning. Planning application expected 2022 [139] [140]
Beacon Wind United States 1,230 2028 NYSERDA [141] [142] [143]
Baltic Power Poland 1,140 2026 [144]
Thor Denmark 1,008 2027 [145]
Inch Cape United Kingdom 1,000 Consent Authorised. Up to 72 wind turbines [146]
Storgrundet Sweden 1,000 Environmental permit granted in September 2023 [147] [148]
Nordlicht I Germany 980 2027 Vattenfall [149]
Skipjack United States 966 2027 Ørsted (company) [150] [151] [152]
He Dreiht Germany 960 2025 [153]
Gennaker Germany 927 2026 [154]
Sunrise Wind United States 880 2024 NYSERDA [155] [156] [157]
Empire Wind United States 40°19′45″N 73°30′28″W / 40.329226°N 73.507861°W / 40.329226; -73.507861 816 2024 NYSERDA [158] [159] [160] [156] [157]
Park City Wind United States 804 2025 Connecticut DEEP [161]
Kitty Hawk Wind United States 800 2026 800 MW in Phase 1, proposed total of 2500 MW BOEM [162] [163]
Hollandse Kust (West) VI Netherlands 750 2026 Shell, Eneco [164]
Hollandse Kust (West) VII Netherlands 750 2026 RWE [164]
OWF Bałtyk II Poland 720 2026 Construction anticipated in 2025/2026 [165] [135]
OWF Bałtyk III Poland 720 2026 Construction anticipated in 2025/2026 [166] [135]
Revolution Wind United States 704 2025 Connecticut DEEP Rhode Island PUC [167] [168] [169]
Baltic Sea Energy Island I Lithuania 55°55′00″N 20°20′00″E / 55.916667°N 20.333333°E / 55.916667; 20.333333 700 2028 Expected to be finished by 2028. Several investors that submitted bids is currently under evaluation by Lithuanian government [170] [171] [172] [173]
Baltic Sea Energy Island II Lithuania 700 2030 Expected to be finished by 2030 after first wind park completed [174]
Noirmoutier France 496 2023 Delivery and commissioning expected for 2023. Project will consist of 62 Siemens Gamesa 8.0-167 DD. [175] [176]

Largest Cancelled Wind Farms

Ocean Wind 1 United States 39°21′58″N 74°24′51″W / 39.366111°N 74.414167°W / 39.366111; -74.414167 1,100 2024 NJBPU [177] [178] [179] [180] [181]
Ocean Wind 2 United States 1,148 2027 NJBPU [137] [182]

Other notable offshore wind farms

Wind Farm Country Coordinates Year Notability Refs
Vindeby Denmark 54°58′12″N 11°7′48″E / 54.97000°N 11.13000°E / 54.97000; 11.13000 (Vindeby (4.95 MW)) 1991 First offshore wind farm; 11 × Bonus 450 kW. Decommissioned in 2017. [183] [184] [185] [186] [187] [188] [189]
Beatrice United Kingdom 58°7′48″N 3°4′12″W / 58.13000°N 3.07000°W / 58.13000; -3.07000 (Beatrice Wind Farm) 2007 Deepest fixed-foundation at 45-metre water depth. 2 × Senvion 5MW prototype turbines [190] [191] [192]
Yttre Stengrund Sweden 56°9′N 16°3′E / 56.150°N 16.050°E / 56.150; 16.050 (Yttre Stengrund (10 MW)) 2001 First offshore wind farm to be decommissioned (in November 2015)
Fryslân Netherlands 53°0′0″N 5°16′0″E / 53.00000°N 5.26667°E / 53.00000; 5.26667 (Fryslân (382.7 MW)) 2021 Largest freshwater wind farm with a total capacity of 382.7 MW [193] [194]
Hywind Norway 2009 First full-scale, deep-water floating turbine: Siemens 2.3 MW turbine in 220 meter-deep water [195] [196]
Hywind Scotland United Kingdom 57°29′0″N 1°21′0″W / 57.48333°N 1.35000°W / 57.48333; -1.35000 (Hywind Scotland (30 MW)) 2017 First full-scale, deep-water floating wind farm, at 30 MW capacity [197]
Hywind Tampen Norway 61°20′1.7″N 2°15′33.8″E / 61.333806°N 2.259389°E / 61.333806; 2.259389 (Hywind Tampen (88 MW)) 2022 Currently the largest deep-water floating wind farm with 88 MW capacity. Built specifically to power offshore oil and gas platforms. [198]

See also

References

  1. ^ "Hornsea 2, the world's largest windfarm, enters full operation".
  2. ^ "About the project". Hornsea Project Two. Orsted. Retrieved 2 August 2020.
  3. ^ "Hornsea 2: North Sea wind farm claims title of world's largest".
  4. ^ "DONG Tables Hornsea Project One Offshore Construction Schedule". Offshore Wind. Archived from the original on 20 April 2018. Retrieved 20 April 2018.
  5. ^ "World's Largest Offshore Wind Farm Fully Up and Running". Offshore Wind. 30 January 2020. Retrieved 3 February 2020.
  6. ^ "Seagreen Wind Energy - Home". SeagreenWindEnergy. Retrieved 17 October 2023.
  7. ^ "Moray East Reaches Full Output". Offshore Wind. 7 April 2022. Retrieved 29 May 2022.
  8. ^ "Triton Knoll reaches turbine commissioning completion". 4c Offshore. 13 January 2022. Archived from the original on 13 January 2022. Retrieved 13 January 2022.
  9. ^ "Asset map | The Crown Estate". www.thecrownestate.co.uk. Archived from the original on 19 January 2022. Retrieved 13 January 2022.
  10. ^ "The Netherlands hits offshore wind target of 4.5 GW with Hollandse…". Crosswind Hollandse Kust Noord (in Dutch). Retrieved 20 December 2023.
  11. ^ "Borssele 1&2". Ørsted. Archived from the original on 19 November 2018. Retrieved 19 November 2018.
  12. ^ "Ørsted fully commissions Borssele 1 & 2 offshore wind farm in Netherlands". www.power-technology.com. Archived from the original on 29 November 2021. Retrieved 13 January 2021.
  13. ^ "Borssele 3 and 4 - Blauwwind - Under Construction Offshore Wind Farm - Netherlands | 4C Offshore". www.4coffshore.com. Retrieved 1 April 2020.
  14. ^ "Borssele III and IV Offshore Wind Farm, the Netherlands". Power Technology | Energy News and Market Analysis. Retrieved 1 April 2020.
  15. ^ "Seajacks, Van Oord to Install East Anglia ONE Foundations". Offshore Wind. Archived from the original on 20 April 2018. Retrieved 20 April 2018.
  16. ^ "East Anglia One Now Officially Fully Operational". Offshore Wind. 3 July 2020. Retrieved 1 August 2020.
  17. ^ "About the project". Archived from the original on 6 September 2018. Retrieved 6 September 2018.
  18. ^ "London Array's own website announcement of commencement of offshore works" (PDF). londonarray.com. Archived from the original (PDF) on 22 July 2011. Retrieved 8 March 2011.
  19. ^ Wittrup, Sanne. First foundation Archived 2011-03-09 at the Wayback Machine Ing.dk, 8 March 2011. Accessed: 8 March 2011.
  20. ^ "London Array - The Project". londonarray.com. Archived from the original on 21 February 2014. Retrieved 10 June 2015.
  21. ^ "Kriegers Flak Offshore Wind Farm - Power Technology". Power Technology. Archived from the original on 20 April 2018. Retrieved 20 April 2018.
  22. ^ "About Kriegers Flak" (PDF). Vattenfall. Retrieved 6 September 2021.
  23. ^ "E_Facts | figures". Archived from the original on 10 April 2018. Retrieved 8 May 2017.
  24. ^ "The 600-MW Gemini offshore wind farm is successfully up & running". Windpower Engineering & Development. Archived from the original on 21 January 2019. Retrieved 12 February 2019.
  25. ^ "Gemini offshore wind project fully completed". Archived from the original on 21 January 2019. Retrieved 8 May 2017.
  26. ^ "Gemini". 4coffshore.com. Archived from the original on 24 January 2016. Retrieved 4 September 2015.
  27. ^ "Oleg Strashnov Installs First Beatrice Jacket Foundation". Offshore Wind. Archived from the original on 7 October 2017. Retrieved 18 October 2017.
  28. ^ "Gode Wind foundation installed successfully". 4coffshore.com. Archived from the original on 24 January 2016. Retrieved 4 September 2015.
  29. ^ "DONG Energy Inaugurates 582 Megawatt Gode Wind I & 2 Offshore Wind Farms". CleanTechnica. Archived from the original on 16 September 2017. Retrieved 3 July 2017.
  30. ^ "World's second largest offshore wind farm opens off coast of Wales". Wales Online. Archived from the original on 19 June 2015. Retrieved 18 June 2015.
  31. ^ "Full power at Race Bank Offshore Wind Farm". orsted.com. Archived from the original on 12 October 2018. Retrieved 2 February 2018.
  32. ^ "Innovation Installs First Foundation at Race Bank". offshorewind.biz/. 30 June 2016. Archived from the original on 2 July 2016. Retrieved 2 July 2016.
  33. ^ "UK: Greater Gabbard Offshore Wind Farm Generates Power". 7 September 2012. Archived from the original on 11 October 2012. Retrieved 7 September 2012.
  34. ^ "Offshore Wind Farms 2008" (PDF). EWEA. 2 February 2009. Archived from the original (PDF) on 19 April 2009. Retrieved 4 February 2009.
  35. ^ "SSE plc - The UK's broadest-based energy company". scottish-southern.co.uk. Archived from the original on 11 January 2011. Retrieved 10 June 2015.
  36. ^ "China's largest offshore wind farm is now fully connected to the grid". Electrek. 27 December 2021. Archived from the original on 29 January 2022. Retrieved 29 January 2022.
  37. ^ "Largest Offshore Wind Farm in China Fully Grid Connected". Offshorewind. 27 December 2021. Archived from the original on 29 January 2022. Retrieved 29 January 2022.
  38. ^ a b c "Global Offshore Wind Report 2021" (PDF). Global Offshore Wind Report 2021. World Forum Offshore Wind. February 2022.
  39. ^ Buljan, Adrijana (29 December 2022). "SPIC Puts First Commercial Offshore Wind Farm Using 11 MW Turbines Into Operation". Offshore Wind. Retrieved 16 July 2023.
  40. ^ "Guohua Investment's Shandong B2 Offshore Wind Power Project Began Full-capacity Operation". www.ceic.com. Retrieved 17 July 2023.
  41. ^ Carmen (18 April 2023). "Power plant profile: Shandong Dongying Bozhong Wind Farm Site A, China". Power Technology. Retrieved 16 July 2023.
  42. ^ Buljan, Adrijana (18 August 2020). "MingYang to Supply Yangjiang Qingzhou III Offshore Wind Turbines". Offshore Wind. Retrieved 17 July 2023.
  43. ^ "Global Offshore Wind Report 2021". WFO-Global. Retrieved 16 July 2023.
  44. ^ "Foundation first at Hohe See". reNEWS - Renewable Energy News. 17 April 2018. Archived from the original on 19 April 2018. Retrieved 20 April 2018.
  45. ^ "Iberdrola's Saint-Brieuc wind farm generates first power". Power Technology. 7 July 2023.
  46. ^ "Saint-Brieuc: Iberdrola's first large-scale offshore wind power project in Brittany". Iberdrola. Retrieved 11 October 2021.
  47. ^ "Fantastic lift-off in France: Siemens Gamesa confirms order for 496 MW Bay of Saint Brieuc offshore wind power plant". www.siemensgamesa.com. Retrieved 11 October 2021.
  48. ^ Williams, Nia (23 November 2022). "France's first commercial-scale offshore wind farm starts full operations". Reuters. Retrieved 24 November 2022.
  49. ^ "MHI Vestas Sets Up Borkum Riffgrund 2 Base in Emden". Offshore Wind. Archived from the original on 20 April 2018. Retrieved 20 April 2018.
  50. ^ " Horns Rev 3 offshore wind farm Archived 2016-10-22 at the Wayback Machine" Vattenfall, 27 June 2016. Accessed: 29 October 2016.
  51. ^ "CGN Shanwei Jiazi II Offshore Wind Farm - Under Construction - China | 4C Offshore". www.4coffshore.com. Retrieved 21 July 2022.
  52. ^ Ltd, Renews (4 October 2017). "Dudgeon hits CfD milestone". reNEWS - Renewable Energy News.
  53. ^ "World's Largest OW Jack-Up Vessel Installs World's Heaviest Monopile at Veja Mate OWF". Archived from the original on 17 June 2016. Retrieved 6 June 2016.
  54. ^ "Construction complete for 402-MW Veja Mate offshore wind park". Renewables Now. Archived from the original on 21 January 2019. Retrieved 31 May 2017.
  55. ^ "Construction under way at China's largest offshore wind farm". 4c Offshore. Archived from the original on 9 May 2019. Retrieved 9 May 2019.
  56. ^ "CGN Yangjiang Nanpeng Island - Fully Commissioned Offshore Wind Farm - China | 4C Offshore". www.4coffshore.com. Retrieved 13 January 2021.
  57. ^ " VIPs cut ribbon at 400MW Anholt Archived 2013-09-07 at the Wayback Machine" Recharge News, 4 September 2013. Accessed: 4 September 2013.
  58. ^ Jan Bjerre Lauridsen & Søren Andersen. " Queen says Good Wind to giant turbines Archived 2013-09-13 at the Wayback Machine" Berlingske, 4 September 2013. Accessed: 4 September 2013.
  59. ^ "All turbines at Anholt Offshore wind farm now operational" (Press release). DONG Energy. 20 June 2013. Archived from the original on 6 October 2013. Retrieved 27 August 2013.
  60. ^ Anholf Offshore wind farm in 4C Offshore Archived 2012-06-27 at the Wayback Machine Retrieved 2013-08-27
  61. ^ "BARD 1 (4c)". 4coffshore.com. Archived from the original on 24 January 2016. Retrieved 10 June 2015.
  62. ^ Rösler eröffnet Offshore-Windpark Bard 1 Archived 2013-08-28 at the Wayback Machine Retrieved 2013-08-26
  63. ^ German Federal Minister Inaugurates BARD Offshore 1 Archived 2013-08-30 at the Wayback Machine Retrieved 2013-08-26
  64. ^ "Global Tech I officially inaugurated". sunwindenergy.com/. Archived from the original on 11 September 2015. Retrieved 4 September 2015.
  65. ^ "Rampion Offshore Wind Farm Hits Full Stride". Offshore Wind. Archived from the original on 18 April 2018. Retrieved 3 May 2018.
  66. ^ "SPIC Binhai North H2 400MW". www.4coffshore.com. Archived from the original on 30 July 2018. Retrieved 26 November 2018.
  67. ^ a b c "Construction Starts on Chinese Offshore Wind Super Projects". Offshore Wind. 24 February 2020. Retrieved 1 April 2020.
  68. ^ "CTGNE Yangjiang Shapa - phase II - Under Construction Offshore Wind Farm - China | 4C Offshore". www.4coffshore.com. Retrieved 1 April 2020.
  69. ^ "Rudong H6 - Under Construction Offshore Wind Farm - China | 4C Offshore". www.4coffshore.com. Retrieved 1 April 2020.
  70. ^ "Rudong H10 - Under Construction Offshore Wind Farm - China | 4C Offshore". www.4coffshore.com. Retrieved 1 April 2020.
  71. ^ "Key project dates for SPIC Rudong H7 - China | 4C Offshore". www.4coffshore.com. Retrieved 13 June 2022.
  72. ^ "SPIC Rudong H4 Offshore Wind Farm - Fully Commissioned - China | 4C Offshore". www.4coffshore.com. Retrieved 13 June 2022.
  73. ^ "Home". Sofia Offshore Wind Farm. Retrieved 9 April 2023.
  74. ^ a b c "DOGGER BANK C REACHES FINANCIAL CLOSE". Dogger Bank Wind Farm. 2 December 2021. Retrieved 26 December 2021.
  75. ^ "Borkum Riffgrund 3". orsted.de (in German). Retrieved 15 October 2023.
  76. ^ 陳映璇. "離岸風電是未來趨勢產業!沃旭帶來上兆元投資,創造彰化在地就業機會". 社企流 (in Chinese (Taiwan)).
  77. ^ "Moray West Offshore Wind Farm Project - Renewable wind energy". www.moraywest.com. Retrieved 15 October 2023.
  78. ^ "Vineyard Wind - Offshore Wind Farm Project | 4C Offshore". www.4coffshore.com.
  79. ^ "Vineyard Wind". Vineyard Wind.
  80. ^ "Two big wind farms to rise off coast of Martha's Vineyard". Boston Globe. 23 May 2018. Retrieved 11 August 2018.
  81. ^ "Vineyard Wind: delayed project reveals bluster in US's offshore wind ambitions". 4 December 2019.
  82. ^ "BREAKING: Vattenfall Wins Second Dutch Zero Subsidy Offshore Wind Tender". Offshore Wind. 10 July 2019. Retrieved 3 October 2021.
  83. ^ "Vattenfall Hollandse Kust - Windpark op de Noordzee". Windpark Hollandse Kust Zuid. (in Dutch). Retrieved 25 August 2021.
  84. ^ "Yunlin Offshore Wind Farm - Partial Generation/Under Construction - Taiwan | 4C Offshore". www.4coffshore.com. Retrieved 13 June 2022.
  85. ^ "Yunlin Offshore Wind Farm, Taiwan Strait, Taiwan". Power Technology. Retrieved 13 June 2022.
  86. ^ "Changfang and Xidao Ready for First Jackets". Offshore Wind. 17 August 2021. Retrieved 13 June 2022.
  87. ^ "Changfang - phase 1 Offshore Wind Farm - Under Construction - Taiwan | 4C Offshore". www.4coffshore.com. Retrieved 13 June 2022.
  88. ^ "Changfang - phase 2 Offshore Wind Farm - Under Construction - Taiwan | 4C Offshore". www.4coffshore.com. Retrieved 13 June 2022.
  89. ^ "Guodian Xiangshan 1 - phase 2 Offshore Wind Farm - Under Construction - China | 4C Offshore". www.4coffshore.com. Retrieved 21 July 2022.
  90. ^ "Taylor Hopkinson to Support Fécamp Offshore Wind Farm Commissioning". Offshore Wind. 8 November 2021. Retrieved 20 December 2021.
  91. ^ "Offshore Wind Park Baltic Eagle".
  92. ^ "France's Calvados Offshore Wind Farm Enters Construction Phase". Offshore Wind. 22 February 2021. Retrieved 20 December 2021.
  93. ^ "Siemens Gamesa celebrates 'the Strength of the Wind' with firm 448 MW Scottish offshore order". www.siemensgamesa.com. Retrieved 10 December 2020.
  94. ^ "Neart na Gaoithe enters first phase of offshore construction – NnG Offshore Wind". Retrieved 10 December 2020.
  95. ^ "Southern China city plans 43.3-gigawatt offshore wind project". ieefa.org. Retrieved 22 October 2022.
  96. ^ "South Korea Launches EUR 36 Billion Offshore Wind Project". 5 February 2021.
  97. ^ "S. Korea Fast-Tracks Plan to Build World's Largest Offshore Wind Farm".
  98. ^ "South Korea plans 8.2-GW offshore wind power complex".
  99. ^ "SSE to merge Berwick Bank and Marr Bank offshore wind farms". Retrieved 10 October 2021.
  100. ^ "The Project". Berwick Bank. Retrieved 10 October 2021.
  101. ^ "Nexans to Supply Seagreen Phase 1 Export Cables". Offshore Wind. 4 November 2019. Retrieved 10 January 2020.
  102. ^ "Seagreen Wind Energy - Home". SeagreenWindEnergy. Retrieved 10 January 2020.
  103. ^ "Round 3 Wind Farms | Offshore Renewable Energy Developments | Knowledge & Advice | RYA - Royal Yachting Association". www.rya.org.uk. Retrieved 10 January 2020.
  104. ^ "Seagreen 2 and 3 Get New Names". Offshore Wind. 7 July 2020. Retrieved 19 November 2020.
  105. ^ "General 1". Berwick Bank. Retrieved 10 October 2021.
  106. ^ "ScottishPower Renewables Bundles East Anglia Offshore Wind Trio". Offshore Wind. 26 November 2019. Retrieved 11 October 2021.
  107. ^ "The East Anglia Hub". ScottishPower Renewables. Retrieved 11 October 2021.
  108. ^ "Med Wind Offshore Wind Farm". Med Wind. 27 July 2022. Retrieved 27 July 2022.
  109. ^ "Med Wind floating offshore project Italy". Power Technology. 13 December 2021. Retrieved 27 July 2022.
  110. ^ "Virginia Dominion - Phase one - Concept/Early Planning Offshore Wind Farm - United States | 4C Offshore". www.4coffshore.com. Retrieved 31 August 2020.
  111. ^ "Virginia Dominion - Phase two - Concept/Early Planning Offshore Wind Farm - United States | 4C Offshore". www.4coffshore.com. Retrieved 31 August 2020.
  112. ^ "About the project". Dominion Energy. Retrieved 30 August 2020.
  113. ^ "About the project". Washington Post. Retrieved 30 August 2020.
  114. ^ "Virginia Dominion - Phase three - Concept/Early Planning Offshore Wind Farm - United States | 4C Offshore". www.4coffshore.com. Retrieved 31 August 2020.
  115. ^ "Hornsea Project Four Offshore Wind Farm - Consent Authorised - United Kingdom | 4C Offshore". www.4coffshore.com. Retrieved 15 October 2023.
  116. ^ Buljan, Adrijana (5 May 2021). "TÜV SÜD Wins Contract for Southwest Offshore Wind Project in South Korea". Offshore Wind. Retrieved 15 October 2023.
  117. ^ "Southwest Offshore - phase 3 Offshore Wind Farm - Concept/Early Planning - South Korea | 4C Offshore". www.4coffshore.com. Retrieved 15 October 2023.
  118. ^ "Southwest Offshore - phase 2 Offshore Wind Farm - Consent Application Submitted - South Korea | 4C Offshore". www.4coffshore.com. Retrieved 15 October 2023.
  119. ^ "Southwest Offshore Demonstration Offshore Wind Farm - Fully Commissioned - South Korea | 4C Offshore". www.4coffshore.com. Retrieved 15 October 2023.
  120. ^ "Hornsea Project Three - 4C Offshore". www.4coffshore.com. Archived from the original on 21 April 2018. Retrieved 20 April 2018.
  121. ^ McGrath, Gareth. "Turning wind into power off the Wilmington coast could be a decade away". Wilmington Star-News. Retrieved 20 September 2023.
  122. ^ McGrath, Gareth. "With an eye out for whales, survey work starts on offshore wind farms south of Wilmington". Wilmington Star-News. Retrieved 20 September 2023.
  123. ^ 彭暄貽 (12 December 2018). "上緯旗下海能風電與台電簽定風力發電離岸系統電能購售契約". 中時電子報 (in Chinese (Taiwan)).
  124. ^ a b c "IJmuiden Ver Wind Farm Zone | RVO.nl". english.rvo.nl. Retrieved 16 July 2023.
  125. ^ "Norfolk vanguard development consent order". Infrastructure planning inspectorate. Retrieved 21 September 2020.
  126. ^ "Norfolk Vanguard". Vattenfall. Retrieved 21 September 2020.
  127. ^ "Norfolk Vanguard Offshore Wind Farm". Vattenfall. Retrieved 4 November 2021.
  128. ^ a b "Vattenfall's Norfolk Boreas gets planning consent". 4c Offshore. Retrieved 13 December 2021.
  129. ^ "Norfolk Vanguard gets green-light". 4c Offshore. Retrieved 11 February 2022.
  130. ^ "Norfolk Boreas". Infrastructure planning inspectorate. Retrieved 21 September 2020.
  131. ^ "Norfolk Boreas". Vattenfall. Retrieved 21 September 2020.
  132. ^ "Norfolk Boreas Offshore Wind Farm". Vattenfall. Retrieved 4 November 2021.
  133. ^ Norfolk Boreas: Work on offshore wind farm stops over soaring costs
  134. ^ "News". www.mfwbaltyk1.pl. Retrieved 4 October 2021.
  135. ^ a b c "Offshore Wind Farms | Polenergia". www.polenergia.pl. Retrieved 4 October 2021.
  136. ^ "Home". www.mfwbaltyk1.pl. Retrieved 4 October 2021.
  137. ^ a b "Offshore Wind | Project Areas". NJDEP. Retrieved 4 March 2022.
  138. ^ "Clean Wind Energy in New Jersey & New York". Atlantic Shores Offshore Wind. Retrieved 4 March 2022.
  139. ^ "Rampion wind farm: Objections raised over proposed extension". BBC News. 21 September 2021. Retrieved 30 September 2021.
  140. ^ "The Project". Rampion 2. Retrieved 30 September 2021.
  141. ^ "Beacon Wind | Tethys". tethys.pnnl.gov. Retrieved 18 September 2023.
  142. ^ "New York's Offshore Wind Projects". NYSERDA. Retrieved 18 September 2023.
  143. ^ "Home". Beacon Wind. 18 September 2023. Retrieved 18 September 2023.
  144. ^ "Baltic Power". balticpower.pl. Retrieved 15 October 2023.
  145. ^ "Thor wind farm". thor.rwe.com. Retrieved 15 October 2023.
  146. ^ "Inch Cape Offshore Wind Farm". Inch Cape Wind. Retrieved 30 September 2021.
  147. ^ Memija, Adnan (14 September 2023). "Skyborn Reaches Major Milestone on Swedish Offshore Wind Project". Offshore Wind. Retrieved 15 October 2023.
  148. ^ "Skyborn receives environmental permit to build 1 GW-Storgrundet Offshore wind farm in Sweden". www.skybornrenewables.com. Retrieved 15 October 2023.
  149. ^ "New German offshore wind farm renamed Nordlicht I". Vattenfall. Retrieved 15 October 2023.
  150. ^ "Skipjack Wind". skipjackwind.com. Retrieved 20 September 2023.
  151. ^ Fine, Ariana (21 February 2022). "Skipjack Wind 2 Chosen as Second Offshore Wind Project in MD". North American Windpower. Retrieved 20 September 2023.
  152. ^ "SkipJack Wind | Tethys". tethys.pnnl.gov. Retrieved 20 September 2023.
  153. ^ "EnBW wind farm He Dreiht | EnBW". EnBW wind farm He Dreiht. Retrieved 15 October 2023.
  154. ^ "Giant Gennaker project pumps Siemens Gamesa's offshore sails". www.siemensgamesa.com. Retrieved 15 October 2023.
  155. ^ "Sunrise Wind - Offshore Wind Farm Project | 4C Offshore". www.4coffshore.com.
  156. ^ a b "Map Library". NYSERDA.
  157. ^ a b "New York awards record 1,700 MW offshore wind contracts". Utility Dive.
  158. ^ "Empire Wind - Offshore Wind Farm Project | 4C Offshore". www.4coffshore.com.
  159. ^ https://www.boem.gov/sites/default/files/uploadedImages/BOEM/BOEM_Newsroom/Press_Releases/2018/NY_Call_4_4_2018_montauk.jpg [ bare URL image file]
  160. ^ "Equinor's Empire Wind - equinor.com". www.equinor.com. 27 April 2023.
  161. ^ https://www.parkcitywind.com/ Park City Wind
  162. ^ "Kitty Hawk Offshore".
  163. ^ "North Carolina Activities | Bureau of Ocean Energy Management".
  164. ^ a b "Hollandse Kust (west) Wind Farm Zone | RVO.nl". english.rvo.nl. Retrieved 4 April 2023.
  165. ^ "Home". www.baltyk2.pl. Retrieved 4 October 2021.
  166. ^ "Home". www.baltyk3.pl. Retrieved 4 October 2021.
  167. ^ "Revolution Wind - Offshore Wind Farm Project | 4C Offshore". www.4coffshore.com.
  168. ^ "Rhode Island Regulators Approve Revolution Wind Power Contract". us.orsted.com.
  169. ^ "About Revolution Wind". revolution-wind.com. Retrieved 15 October 2023.
  170. ^ Šaltiniai: „Orlen“ dalyvauja vėjo parko Baltijos jūroje konkurse
  171. ^ Baltijos jūros dugno tyrimai: teritorija tinkama vystyti jūrinio vėjo elektrinių parką
  172. ^ Vėjo parko Baltijos jūroje projektas
  173. ^ Lithuania unveils plans for another Baltic Sea wind farm
  174. ^ „Ignitis grupė“ ir „Ocean Winds“ jūrinio vėjo konkurso laimėtojais turėtų būti paskelbti rugsėjį
  175. ^ "Prysmian to supply cables for 496-MW wind complex off France". Renewablesnow.com. Retrieved 20 December 2021.
  176. ^ "Noirmoutier Offshore Wind Farm - Consent Authorised - France | 4C Offshore". www.4coffshore.com. Retrieved 20 December 2021.
  177. ^ "Ocean Wind - Offshore Wind Farm Project | 4C Offshore". www.4coffshore.com.
  178. ^ Warren, Michael Sol (21 June 2019). "N.J. just gave the green light to build the nation's largest offshore wind farm". nj.
  179. ^ Martin, Chris (21 June 2019). "N.J. Betting Big on Orsted as Offshore Wind Poised to Boom". www.bloomberg.com.
  180. ^ "NJ OKs biggest US wind farm off Jersey Shore; will power 500K homes". Asbury Park Press.
  181. ^ "PSEG Looks to Become Active Player in Offshore Wind Development". NJ Spotlight. 30 October 2019.
  182. ^ "New Jersey Selects Ørsted's Ocean Wind 2 as Part of the State's Second Offshore Wind Solicitation". us.orsted.com. Retrieved 4 March 2022.
  183. ^ Operational offshore wind farms in Europe, end 2009 Archived 2010-11-21 at the Wayback Machine EWEA. Retrieved: 23 October 2010.
  184. ^ Christensen, Allan S. & Madsen, Morten. Supply Chain study on the Danish offshore wind industry Archived 2016-05-15 at the Portuguese Web Archive page 33-42 Offshore Center Denmark, 29. August 2005. Retrieved: 23 October 2010.
  185. ^ "Introduction to the (Nysted offshore) park". Archived from the original on 30 July 2012. Retrieved 19 August 2010.
  186. ^ "Data on operating and decommissioned wind turbines (as at end of June 2010)". ENS. 16 July 2010. Archived from the original on 19 July 2011. Retrieved 9 August 2010.
  187. ^ "4cOffshore listing for Vindeby". 4coffshore.com. Archived from the original on 27 January 2011. Retrieved 1 September 2010.
  188. ^ Stenstrop, Georg. Vindeby Archived 2016-04-23 at the Wayback Machine Kulturarv. Retrieved: 1 September 2010.
  189. ^ Prinds, Karsten. "Where offshore wind was invented" Archived 2012-03-11 at the Wayback Machine. OceanWise, 2011
  190. ^ Sharp, Stephen. Scotland shares excellence in renewable energy at World Investment Congress[ permanent dead link] Scottish Enterprise, 15 June 2007. Retrieved: 18 October 2010. "subsea jacket structure which enables the turbines to sit in 45m of water" .. "deepest water depth"
  191. ^ Kempton et al. Supporting Information Archived 2015-09-24 at the Wayback Machine page 3 Proceedings of the National Academy of Sciences, 14 August 2009. Retrieved: 17 October 2010.
  192. ^ "beatricewind.co.uk". Archived from the original on 22 July 2015. Retrieved 10 June 2015.
  193. ^ "Windpark Fryslân - Friese windenergie voor een duurzame toekomst". www.windparkfryslan.nl. Retrieved 18 October 2023.
  194. ^ "The World's Largest Freshwater Wind Farm". earthobservatory.nasa.gov. 31 July 2023. Retrieved 18 October 2023.
  195. ^ Patel, Prachi (22 June 2009). "Floating Wind Turbines to Be Tested". IEEE Spectrum. Archived from the original on 28 June 2009. Retrieved 25 June 2009. will test how the 2.3-megawatt turbine holds up in 220-meter-deep water.
  196. ^ Madslien, Jorn (8 September 2009). "Floating challenge for offshore wind turbine". BBC News. BBC. Archived from the original on 11 September 2009. Retrieved 16 September 2009. world's first full-scale floating wind turbine
  197. ^ "Floating turbines deliver first electricity". BBC. 18 October 2017. Archived from the original on 29 March 2019. Retrieved 5 March 2019.
  198. ^ "Hywind Tampen". www.equinor.com. Retrieved 16 October 2023.